Proven at scale
Jobs from 1,000 to 5,000 t, from a 2,500 t/month plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
-
5,000 t
Sunpro Steel Factory
Steel industry · about 5,500 short tons
-
2,500 t
CPV Food Processing Factory
Food processing · about 2,750 short tons
-
2,000 t
Long Son petrochemical complex
Oil and gas · about 2,200 short tons
-
2,000 t
M&D (MD Factory)
Warehouse and industrial · about 2,200 short tons
-
1,500 t
Tongwei Tien Giang feed factory, phase 1
Animal feed · about 1,650 short tons
-
1,000 t
New Era cold storage
Cold storage, phase 1 tonnage · about 1,100 short tons
Where jobs get stuck
What federal prime contractors tell us goes wrong
- Domestic-content clausesClauses in the contract may limit or rule out imported steel.
- Long submittal registersContract-specific documents for every item.
- Strict site and data rulesAccess, document control and security requirements.
What changes with World Steel
How we take those problems off your desk
- Requirements confirmed firstNothing is priced until your contracting officer has confirmed what applies.
- TraceabilityHeat-number traceability from mill to member.
- Register-ready recordsQuality records organized to your submittal register.
- Designed to US standardsFabrication to AISC 360, AWS D1.1 and ASTM material standards.
Gate by gate
The order we work in
Federal work only moves forward in this order.
The order we work in
- Contracting officer You confirm whether imported steel is allowed on this contract.
- Requirements list We read the specification, submittal register and flow-downs.
- Technical offer Scope, design basis and documents, only where imported steel is accepted.
- Records Traceability and quality records delivered to the register.
World Steel fabricates in Vietnam and makes no domestic-content or eligibility claims. Where a contract does not accept imported steel, we do not quote.
Request a quotation · Federal Prime Contractors
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Become our partner in the US
Support for federal primes is agreed one project at a time.
See the Contractor Partnership ProgramYour scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that federal prime contractors use most, each with its own page to read before you call.
Ecosystem for Federal Prime Contractors
Photo
Photo
Photo
Engineering guides
- Hurricane Coast Steel BuildingsGulf and Atlantic sites, designed to the coastal rules
- Seismic DesignSeismic Design Category drives the details
- Connections & Load PathEvery link from roof sheet to anchor rod
How we work
- Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
- Project managementA named project manager, scheduled reports and one point of contact from contract to final delivery.
Buildings to look at
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What federal prime contractors ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can World Steel supply steel for a federal project?
Only where the contract and the contracting officer allow imported steel. We ask you to confirm that before we price anything.
What documents can you provide?
Mill certificates with heat-number traceability, weld procedures and qualifications, inspection and coating records, calculations and drawings.
Which standards do you fabricate to?
AISC 360 design, AWS D1.1 welding and ASTM material standards, as the contract specifies. We design and fabricate to these standards.
Does World Steel make any domestic-content claim?
No. The steel is fabricated in Vietnam. We make no domestic-content or eligibility claims.
Can you provide technical data for discussions with the contracting officer?
Yes. We can supply material and fabrication data your team can use in those discussions.
Who holds the federal contract?
You do. World Steel is a supplier to the contractor.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.