Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

East Coast · New Jersey & New York

Steel buildings shipped to the Port of New York and New Jersey

The largest port on the East Coast puts your building within reach of the densest market in the country. We land the steel at a Newark, Elizabeth, Bayonne or Staten Island terminal and plan the last mile around Northeast traffic and rules.

Channel depth
15.2 m (50 ft) channels
Rail
ExpressRail to CSX and Norfolk Southern
Ocean route
Mostly through the Panama Canal
Our plant → New York–New JerseyEast Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of New York and New Jersey, through the Panama Canal. World Steel plant · Vietnam New York–New Jersey Panama Canal
  • Made in our IAS AC472 plant, Vietnam
  • Port of New York and New Jersey
  • Illustrative route; set per booking
Location
Newark and Elizabeth, New Jersey
Port authority
Port Authority of New York and New Jersey
Highways
I-95 / New Jersey Turnpike, I-78, I-278

Made in Vietnam, landed at New York–New Jersey

Why ship your building through New York–New Jersey

The Port Authority of New York and New Jersey oversees six container terminals around the harbor, on 15.2 m (50 ft) channels. Raising the Bayonne Bridge in 2019 opened the Newark Bay terminals to the largest ships, and ExpressRail links the terminals to CSX and Norfolk Southern.

World Steel has supplied US projects in the region, including a warehouse in New York of about 230 t. Your building is fabricated in our plant in Vietnam, shipped through the Panama Canal on most services and cleared by your broker in New York or New Jersey.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at New York–New Jersey

Channel

15.2 m (50 ft) channels

Rail

ExpressRail to CSX and Norfolk Southern

Highways

I-95 / New Jersey Turnpike, I-78, I-278

TerminalWhere / operatorCargo
Port Newark Container TerminalNewark, NJContainers
Maher TerminalsElizabeth, NJContainers
APM Terminals ElizabethElizabeth, NJContainers
GCT BayonneBayonne, NJContainers
GCT New YorkStaten Island, NYContainers
Red Hook Container TerminalBrooklyn, NYContainers
Breakbulk at Port Newark and Red HookBy arrangement with the terminal operatorBreakbulk

Source: Port Authority of NY & NJ: port capabilities, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to New York–New Jersey

How your steel gets here

Through the Panama Canal and up the Atlantic coast on most services; some services run via the Cape of Good Hope or the Suez Canal.

Your shipment to New York–New Jersey, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea · via Panama

≈ 12,200 nmi illustrative lane

Split between us

New York–New JerseyNewark and Elizabeth, New Jersey

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from New York–New Jersey

Trucks serve New Jersey, New York City and Long Island; I-78 runs west to the Lehigh Valley warehouse belt. ExpressRail trains carry containers to upstate New York, Pennsylvania and the Midwest.

Map of the United States with the Port of New York and New Jersey, New Jersey and New York highlighted, and the states it also serves: Pennsylvania, Connecticut, Massachusetts and Ohio. MA NJ PA CT NY OH
Port stateAlso served from New York–New JerseyPort of New York and New Jersey

Designed for the region

Site conditions we design for around New York–New Jersey

Snow Load Steel Buildings

Northeast sites design for ASCE 7 snow, drift and rain-on-snow loads.

How we design for it

High-Wind Steel Buildings

Coastal New Jersey, New York City and Long Island see high coastal winds.

How we design for it

Energy Code Building Envelopes

New York and New Jersey energy codes set insulation for walls and roofs.

How we design for it

On arrival

Receiving your steel at New York–New Jersey

Last-mile restrictions

City deliveries have truck routes and time windows; give your trucker the site’s rules early.

Lehigh Valley jobs

Pennsylvania warehouse sites are a short run west on I-78.

Winter work

Plan for snow, ice and cold-weather procedures on site.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for New York–New Jersey

  • The Incoterm, for example FOB Vietnam, CFR or CIF New York–New Jersey
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to New York–New Jersey

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near New York–New Jersey

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

New York–New Jersey shipping questions

Which terminal will my containers use?

The carrier’s rotation decides: Newark, Elizabeth, Bayonne, Staten Island or Brooklyn. Your booking names it, and we forward it to your broker and trucker.

Have you supplied buildings in New York?

Yes. World Steel’s US references include a warehouse in New York of about 230 t.

Can you design to the New York City Building Code?

We design to the code the project’s jurisdiction enforces, including local amendments, and your Engineer of Record reviews and approves our drawings for the permit.

Keep reading

Related pages

Other East Coast ports

Building within reach of New York–New Jersey?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.