New York · Multi-story

Structural steel for multi-story New York buildings

In New York City and the suburbs around it, offices, labs, schools, garages and mixed-use buildings go up, not out. Steel frames with composite floors and braced cores keep floors light and spans open, and tight urban sites need steel that arrives in the order it is erected.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at the Port of New York and New Jersey for your New York site.

Multi-story steelNY
Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.
Typical
Offices, labs, schools
Floors
Composite deck on steel
Lateral
Braced cores or moment frames
Delivery
Floor by floor

Why it matters

Tight sites need steel in sequence

An urban site has little room to store steel. Members have to arrive in the order the crew sets them, tier by tier, with every connection detailed and every piece marked.

We work from your Engineer of Record’s design or design the steel to it, detail columns, beams, braces and floor framing in Tekla, and release packages floor by floor or tier by tier. Fireproofing is coordinated with the specified rating and the applicator.

What we design and fabricate

Steel for multi-story frames

Columns and beams

Rolled and built-up columns spliced for erection.

Composite floors

Floor beams and girders for deck and concrete.

Braced cores

Braces and gusset connections for the lateral system.

Fire protection ready

Surfaces prepared for the specified fireproofing.

Who does what

Multi-story steel, split clearly

World Steel supplies

  • Frame design or detailing to the Engineer of Record’s design
  • Tekla shop and erection drawings, included
  • Packages released floor by floor
  • Mill certificates traced by heat
  • Live tracking in PEB Studio

The US contractor arranges

  • Engineer of Record approval and PE seal
  • Filing, permits and special inspections
  • Concrete, deck placement and fireproofing
  • Site logistics and crane planning
  • Erection and site work

New York

What we do not claim

World Steel holds no New York City approval and claims no completed New York City building. Your Engineer of Record designs or approves the frame and your team files it.

New York ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · New York contractors

New York contractors: let’s win the next project together

If your next bid involves multi-story steel, World Steel wants to be your long-term, win-win steel partner in New York. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your New York project is cut, welded, inspected and packed.

Metal floor deck laid on each level of a steel-framed building
Going up beside the plant in Vietnam: World Steel framed its own office building.
Six-story steel frame seen from the front, floor deck in place
Going up beside the plant in Vietnam: World Steel framed its own office building.
Tubular column with a square base plate and bolt holes, crew working behind it
Column with its base plate and anchor-bolt holes, fabricated in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.

Q&A

What New York buyers ask

Can you deliver floor by floor?

Yes. We release and pack the steel by tier or floor, so each delivery matches the next lift.

Do you supply the metal deck?

We can supply decking with the frame, or coordinate with your deck supplier.

Can you work from our engineer’s design?

Yes. We detail to your Engineer of Record’s design, or design the steel to it and send calculations for approval.

Official sources: NYC Department of Buildings

New York solutions

Every New York guide

Related pages

Code facts on this page summarize New York practice, the NYS Uniform Code, the NYC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the code official or the Department of Buildings confirm the code and edition in force for your project.

Building in New York?

Send the drawings or the site address, size and use. We set the New York design basis with your Engineer of Record, design or detail the steel to the Uniform Code or the NYC codes and your site’s snow and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.