Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Owner-occupied retail steel building supplied by World Steel

For owner-occupiers

A steel building you will own for thirty years, with the record to prove what is in it

You are the one who lives with the roof, the coatings and the next expansion. World Steel designs and fabricates your building in its own plant in Vietnam and hands over a Manufacturing Data Record that says exactly what was supplied.

  • Coatings and fasteners matched to your climate
  • A record of exactly what was supplied
  • Additions that tie into what you already own

2,500 t a month · IAS AC472 since 2019 · jobs up to 5,000 t

Building record

  • Mill certificates
  • Coating reports
  • Inspection records
  • Drawings and calculations
  • As-shipped list
  • Care notes

Your role, your problems

The problems we hear most, and our answer to each

  • Rust, leaks and worn roofs

    Older buildings show where coatings and fasteners were not matched to the site.

  • No drawings on file

    Many owners cannot find the drawings or material records for the building they have.

  • Growth that does not fit

    Additions are hard when the original frame was never planned to grow.

  • Coatings for your exposurePaint systems, galvanizing and fastener grades picked for coastal, rural or industrial air.
  • A record you keepMill certificates, coating reports, drawings and the as-shipped list, handed over with the steel.
  • Additions planned around what existsNew bays and buildings designed to tie into your existing structure, measured in mm.
  • Accredited design and fabricationIAS AC472 since 2019, audited twice a year, the first and only accreditation of its kind in Vietnam.

Handed over with the steel

What goes into your building record

Keep it with the deed. The next owner, insurer or engineer will ask for it.

What goes into your building record

  • Mill certificates

    EN 10204 3.1 certificates traced by heat number to the members in your frame.

  • Coating reports

    Surface preparation, dry film thickness readings and the paint system used.

  • Inspection records

    Dimensional checks, weld visual inspection and NDT where specified.

  • Drawings and calculations

    Erection drawings, anchor rod layout and design calculations as approved.

  • As-shipped list

    Every piece mark, bundle and container, so a missing part is easy to trace.

  • Care notes

    Panel, fastener and gutter care that keeps the warranty conditions met.

Request a quotation

Send us your next steel package

Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.

Plan your next building
Become our partner in the USOwners who expand step by step keep the same engineering team and building record across every phase. Partner program

Your scope, mapped

Systems, guides and services that come up in your work

The parts of World Steel that building owners use most, each with its own page to read before you call.

Ecosystem for Building Owners

  • Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
  • Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
  • PEB Studio trackingYour own login to follow fabrication, inspections, packing and shipping of your structure in real time.
  • IAS AC472 — Metal Building Systems
  • EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
  • EN 1090 EXC3 (CE marking) 2797 CPR 827443
  • AS/NZS 5131 CC3 BMP 827566

How mill certificates and inspection records reach your inspector

Questions

What building owners ask us first

Still have one? Ask it in the quote form and an engineer answers in writing.

Plan your next building
Can you add onto a building that someone else supplied?

Often, yes. Send the drawings or site measurements of the existing structure. Our engineers check how a new bay or building can tie in, and your contractor’s Engineer of Record approves the details.

Which coating should we choose near the coast?

It depends on the distance to salt water, humidity and use. We propose a paint system or galvanizing for your exposure category and state the dry film thickness on the drawings.

What records do we receive?

A Manufacturing Data Record with mill certificates, coating and inspection records, drawings, calculations and the as-shipped list, delivered with the steel and available in PEB Studio.

Who builds the building on our site?

A US contractor of your choice, or one you already work with, buys and erects the steel. World Steel designs, fabricates and supplies it.

Is the steel made in the US?

No. It is fabricated in World Steel’s own plant in Vietnam and shipped to the US. Our Westminster, California office coordinates US projects.

Can a large owner project be handled?

Yes. The plant fabricates about 2,500 metric tons of structural steel a month, and single jobs have reached 5,000 t.

Code editions, local amendments and design loads differ by state. Check the guide for your project location.

All state guides →

World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).

Ready to price your next steel package?

Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.