
Proven at scale
Jobs from 1,000 to 5,000 t, from a 2,500 t/month plant
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so a large US package is a normal month, not a stretch.
-
5,000 t
Sunpro Steel Factory
Steel industry · about 5,500 short tons
-
2,500 t
CPV Food Processing Factory
Food processing · about 2,750 short tons
-
2,000 t
Long Son petrochemical complex
Oil and gas · about 2,200 short tons
-
2,000 t
M&D (MD Factory)
Warehouse and industrial · about 2,200 short tons
-
1,500 t
Tongwei Tien Giang feed factory, phase 1
Animal feed · about 1,650 short tons
-
1,000 t
New Era cold storage
Cold storage, phase 1 tonnage · about 1,100 short tons
Your role, your problems
The problems we hear most, and our answer to each
Rust, leaks and worn roofs
Older buildings show where coatings and fasteners were not matched to the site.
No drawings on file
Many owners cannot find the drawings or material records for the building they have.
Growth that does not fit
Additions are hard when the original frame was never planned to grow.
- Coatings for your exposurePaint systems, galvanizing and fastener grades picked for coastal, rural or industrial air.
- A record you keepMill certificates, coating reports, drawings and the as-shipped list, handed over with the steel.
- Additions planned around what existsNew bays and buildings designed to tie into your existing structure, measured in mm.
- Accredited design and fabricationIAS AC472 since 2019, audited twice a year, the first and only accreditation of its kind in Vietnam.
Handed over with the steel
What goes into your building record
Keep it with the deed. The next owner, insurer or engineer will ask for it.
What goes into your building record
Mill certificates
EN 10204 3.1 certificates traced by heat number to the members in your frame.
Coating reports
Surface preparation, dry film thickness readings and the paint system used.
Inspection records
Dimensional checks, weld visual inspection and NDT where specified.
Drawings and calculations
Erection drawings, anchor rod layout and design calculations as approved.
As-shipped list
Every piece mark, bundle and container, so a missing part is easy to trace.
Care notes
Panel, fastener and gutter care that keeps the warranty conditions met.
Request a quotation
Send us your next steel package
Drawings, a site address or a short brief is enough to start. You get back a design basis, an itemized scope of supply and our open questions.
Your scope, mapped
Systems, guides and services that come up in your work
The parts of World Steel that building owners use most, each with its own page to read before you call.
Ecosystem for Building Owners
Photo
Photo
Photo
Photo
Engineering guides
- Snow Load Steel BuildingsGround snow, drift and sliding snow, designed in
- Lifecycle MaintenanceAn owner's plan for every US climate
- Coastal Corrosion ProtectionCoatings picked from the real exposure
How we work
- Quality controlEight inspection points you can witness on site, through a third-party inspector or live by video.
- Wind, snow & seismic designHow we size a US steel building for ASCE 7-22 wind, snow and earthquake loads at your exact address.
- PEB Studio trackingYour own login to follow fabrication, inspections, packing and shipping of your structure in real time.
Buildings to look at
- AddarioUnited States · 2024
Photo
- Apache Camper CenterUnited States · 2023
3D model
- UR Warehouse 2United States · 2019
Photo
- IAS AC472 — Metal Building Systems
- EN ISO 3834-2 Welding Quality INY-CER/23/1056 Rev.0
- EN 1090 EXC3 (CE marking) 2797 CPR 827443
- AS/NZS 5131 CC3 BMP 827566
How mill certificates and inspection records reach your inspector
Questions
What building owners ask us first
Still have one? Ask it in the quote form and an engineer answers in writing.
Can you add onto a building that someone else supplied?
Often, yes. Send the drawings or site measurements of the existing structure. Our engineers check how a new bay or building can tie in, and your contractor’s Engineer of Record approves the details.
Which coating should we choose near the coast?
It depends on the distance to salt water, humidity and use. We propose a paint system or galvanizing for your exposure category and state the dry film thickness on the drawings.
What records do we receive?
A Manufacturing Data Record with mill certificates, coating and inspection records, drawings, calculations and the as-shipped list, delivered with the steel and available in PEB Studio.
Who builds the building on our site?
A US contractor of your choice, or one you already work with, buys and erects the steel. World Steel designs, fabricates and supplies it.
Is the steel made in the US?
No. It is fabricated in World Steel’s own plant in Vietnam and shipped to the US. Our Westminster, California office coordinates US projects.
Can a large owner project be handled?
Yes. The plant fabricates about 2,500 metric tons of structural steel a month, and single jobs have reached 5,000 t.
Similar roles
State guides
Code editions, local amendments and design loads differ by state. Check the guide for your project location.
All state guides →World Steel designs, fabricates and supplies structural steel and pre-engineered steel buildings from its own plant in Vietnam; erection, drawing approval, the PE seal and permits are the US contractor’s scope. In Vietnam our work is called kết cấu thép (structural steel) and nhà thép tiền chế (pre-engineered steel buildings).
Ready to price your next steel package?
Send drawings, a site address or a short brief. Our engineers return a design basis, an itemized scope of supply and the questions to settle first, from a plant that fabricates 2,500 metric tons of structural steel a month.