Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Truss and girder types

Pony, through, box or U-frame: the footbridge form that fits your span

The form of a footbridge is set by its span, the clearance below, the view you want and the way the steel will travel. We have fabricated three of them for real: a U-frame in Singapore, a through truss in Singapore and eighteen box trusses for Guyana.

Pony truss
Through truss
Box truss
U-frame
Plate girder

Elevation drawer

Five forms, one drawing each

Spans are typical ranges for early planning. The designer sets the form from the loads, clearances and vibration criteria of your site.

Pony truss

Typical span
About 15 to 40 m (50 to 130 ft)
Shape
Trusses about handrail height, nothing overhead
Best for
Creeks, park paths and campus links where the view matters
Built by World Steel
In building structures; ask us for a footbridge proposal

Through truss

Typical span
About 30 to 60 m (100 to 200 ft)
Shape
Deep trusses with portal frames at each end
Best for
Longer crossings over roads, water and rail
Built by World Steel
CP4 Steel Bridge, Singapore (2020)

Box truss

Typical span
About 25 to 50 m (80 to 165 ft)
Shape
Trusses braced across the top as well
Best for
Slim long spans, canopies and enclosed walkways
Built by World Steel
18 footbridges, Guyana (2026)

U-frame

Typical span
About 15 to 35 m (50 to 115 ft)
Shape
Portal frames rising from a girder deck
Best for
Canals, plazas and housing estates with a light look
Built by World Steel
Footbridge, Singapore (2025)

Plate girder

Typical span
Up to about 25 m (80 ft)
Shape
Two girders with floor beams, the shallowest look
Best for
Short crossings that can ship whole and go in one lift
Built by World Steel
In building structures; ask us for a footbridge proposal

Web patterns

Warren, Pratt or Howe inside the truss

Warren

Diagonals alternate up and down with no verticals. Fewer pieces, a clean look, more members working in both tension and compression.

Pratt

Verticals in compression and diagonals sloping toward the middle in tension. Long diagonals stay slim because they only pull.

Howe

The mirror of a Pratt: diagonals in compression and verticals in tension. Used when the designer wants stockier diagonals.

Before you pick

Six questions that choose the form for you

How long is the span?

Short spans favour girders and pony trusses; past about 40 m a through or box truss is usual.

What sits below?

A road or rail line sets a clearance envelope, which limits how deep the structure can go under the deck.

Will it be enclosed?

A roof, screens or glazing add weight and wind, and need top chords or frames to carry them.

How lively may it feel?

Light spans can bounce under crowds; the depth is set so the natural frequency stays clear of walking pace.

How will it travel?

Segment length, depth and weight must fit a container, a flat rack and the crane on site.

How will it look?

Open trusses, crisp U-frames or plain girders: the owner’s eye is a design input too.

Loads, vibration and code checks belong to the design: design and submittals. Long spans in segments: shipping long spans.

From our shop

Trusses and frames we fabricated

Bolted truss of the CP4 bridge laid out along the shop for trial assembly
Red U-frame footbridge preassembled on the ground under a crane hook near housing blocks
Bridge chords with triangular gusset plates welded on for the truss diagonals
Red bolted deck grillage of the Singapore footbridge over a canal

Questions

Choosing a footbridge form

Which truss type is cheapest for a footbridge?

It depends on the span and the site. Short spans are often most economical as plate girders or pony trusses; longer spans as through or box trusses. Send the span, width and clearances and we can compare more than one form for you.

What is the difference between a pony truss and a through truss?

A pony truss is low, about handrail height, with nothing overhead. A through truss is deep enough to need bracing or portal frames above the walkway, which lets it span further.

Have you built each of these forms?

We have fabricated a U-frame footbridge (Singapore, 2025), a through-truss bridge (CP4, Singapore, 2020) and eighteen enclosed box-truss footbridges (Guyana, 2026), as well as plate girders and trusses for buildings.

Can a truss carry a roof or glazing?

Yes. Box and through trusses can carry a canopy, screens or a full enclosure. Tell us early, because the extra weight and wind change the member sizes.

Who decides the form?

The owner and the Engineer of Record. We can propose options and the steel weight of each, and our design is reviewed and approved by your engineer.

Not sure which form fits?

Send the span, width, clearance and site. We return the forms that fit, the steel weight of each and how each one would ship.