Montana · Energy
Structural steel for Montana refinery and energy plants
Billings and Laurel are home to most of Montana’s refining, and the eastern edge of the state shares the Bakken oil field with North Dakota. Plants and service companies need process buildings, shops, platforms and equipment steel built to the owner’s specifications. We fabricate and coat that steel.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your Montana site.
- Refining
- Billings and Laurel
- Oil field
- Bakken, Sidney
- Coatings
- Galvanized outdoors
- Spec
- Owner specifications
Why it matters
Process steel on the Yellowstone
A refinery turnaround or expansion fits steel between running units on a tight schedule, while Bakken service shops need wide doors and crane bays for rigs and trucks.
We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel and pack it by system so each area goes up in order.
What we design and fabricate
Steel for energy sites
Equipment structures
Platforms and supports for process and electrical equipment.
Plant buildings
Process, compressor and maintenance buildings.
Galvanized steel
Hot-dip galvanizing for exposed outdoor steel.
Owner specifications
Fabrication to the owner’s project specifications.
Who does what
Energy steel, split clearly
World Steel supplies
- Plant buildings, platforms and equipment steel
- Fabrication to owner specifications
- Galvanizing or coating systems for the exposure
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Process design and equipment data from the owner
- Engineer of Record approval and PE seal
- Foundations and equipment setting
- Piping, electrical and controls
- Erection and site work
Montana
What we do not claim
World Steel names no Montana energy or utility company as a customer and claims no completed Montana energy project. Process design and equipment are the owner’s scope.
Montana ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Montana contractors
Montana contractors: let’s win the next project together
If your next bid involves refineries and energy, World Steel wants to be your long-term, win-win steel partner in Montana. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Montana project is cut, welded, inspected and packed.
Q&A
What Montana buyers ask
Do you work to refinery specifications?
Yes. We fabricate to the owner’s project specifications and inspection plan.
Can you build oil field shops?
Yes. We frame heated shops with crane bays and wide doors.
Do you name refiners as customers?
No. World Steel names no company as a customer on this site.
Official sources: Montana Department of Environmental Quality
Montana solutions
Every Montana guide
Related pages
Code facts on this page summarize Montana practice, the Montana building code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Montana?
Send the drawings or the site address, size and use. We set the Montana design basis with your Engineer of Record, design or detail the steel to the Montana building code, western seismic belts and mountain snow, and quote it made in our plant in Vietnam, packed complete in erection order and delivered by rail or truck to your site.