Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Gulf Coast · Louisiana

Steel buildings shipped up the Mississippi to New Orleans

Port NOLA is the only deepwater US port served by six Class I railroads, through the New Orleans Public Belt. That reach up the Mississippi valley makes it a strong gateway for Louisiana, Mississippi and the Mid-South.

Channel depth
15.2 m (50 ft) Mississippi River channel
Rail
Six Class I railroads via the New Orleans Public Belt
Ocean route
Through the Panama Canal
Our plant → New OrleansGulf Coast
Illustrative sea route from the World Steel plant in Vietnam to the Port of New Orleans, through the Panama Canal. World Steel plant · Vietnam New Orleans Panama Canal
  • Made in our IAS AC472 plant, Vietnam
  • Port of New Orleans
  • Illustrative route; set per booking
Location
New Orleans, Louisiana
Port authority
Port of New Orleans (Port NOLA)
Highways
I-10, I-610, US-90
Your state guide
Steel buildings in Louisiana

Made in Vietnam, landed at New Orleans

Why ship your building through New Orleans

The Port of New Orleans runs container and breakbulk terminals along the east bank of the Mississippi River. Containers are handled at the Napoleon Avenue Container Terminal, and the riverfront wharves handle steel, heavy-lift and project cargo. A new Louisiana International Terminal downriver at Violet is planned to open in 2028.

Ships reach the city on the Mississippi River ship channel, deepened to 15.2 m (50 ft) through New Orleans. Your building is fabricated in World Steel’s plant in Vietnam, crosses the Pacific and the Panama Canal, and comes up the river to the terminal named on your booking.

  • One package, one plant

    Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.

  • Accredited fabrication

    World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.

  • Designed to US codes

    IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.

  • Packed for this port

    Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.

Port facts

Terminals, channel and connections at New Orleans

Channel

15.2 m (50 ft) Mississippi River channel

Rail

Six Class I railroads via the New Orleans Public Belt

Highways

I-10, I-610, US-90

TerminalWhere / operatorCargo
Napoleon Avenue Container TerminalOperated by Ports AmericaContainers
Nashville Avenue TerminalHeavy-lift and project cargo, Ports AmericaBreakbulk
Riverfront breakbulk wharvesFirst Street, Seventh Street, Harmony Street and othersBreakbulk

Source: Port NOLA: terminals, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.

From our plant to New Orleans

How your steel gets here

Across the Pacific, through the Panama Canal and the Gulf of Mexico, then about 160 km (100 miles) up the Mississippi River to New Orleans.

Your shipment to New Orleans, leg by leg

Run the full simulation →
Our plantTay Ninh, Vietnam

By road

About 2 hours

World Steel pays

Cai Mep / Cat LaiPort of loading

By sea · via Panama

≈ 11,400 nmi illustrative lane

Split between us

New OrleansNew Orleans, Louisiana

Customs, truck or rail

Planned with your trucker

You pay

Your siteErected by the US contractor
Under FOB explained

Risk passes to you when the steel is on board the vessel at the named Vietnamese port.

Inland reach

Where steel goes from New Orleans

The New Orleans Public Belt hands cars to UP, BNSF, CN, CSX, NS and CPKC, covering the Mississippi valley, Texas and the Southeast. Barge service up the river is an option for oversize pieces.

Map of the United States with the Port of New Orleans, Louisiana highlighted, and the states it also serves: Mississippi, Tennessee, Arkansas and Illinois. IL AR MS TN LA
Port stateAlso served from New OrleansPort of New Orleans

Designed for the region

Site conditions we design for around New Orleans

Hurricane Coast Steel Buildings

Southeast Louisiana is hurricane-prone, with wind-borne debris regions near the coast.

How we design for it

Coastal Corrosion Protection

Humid, salty air calls for the right coating system.

How we design for it

High-Wind Steel Buildings

ASCE 7 wind design governs frames and cladding.

How we design for it

On arrival

Receiving your steel at New Orleans

Use the rail reach

For Memphis or Chicago, ask about rail from Port NOLA through the Public Belt.

River conditions

High or low Mississippi water can affect berthing; sailings are confirmed at booking.

Hurricane season

June to November: plan site storage and temporary bracing.

Documents sent ahead to your broker

  • Commercial invoice and packing list per container
  • Bill of lading and certificate of origin
  • Container packing report with seal number and VGM
  • EN 10204 3.1 mill certificates
  • Shipping marks with a QR link to each member’s passport

What the quote states for New Orleans

  • The Incoterm, for example FOB Vietnam, CFR or CIF New Orleans
  • Who acts as importer of record
  • Containers, flat racks or breakbulk for oversize members
  • Delivery to the port or to a named US place, if offered

No prices, freight rates or duty estimates are published.

PEB Studio · real-time tracking

Follow every bundle from our shop floor to New Orleans

Watch production stage by stage, open the container packing report when the seal goes on, and scan a member’s QR tag at the port or on site to see what it is and where it goes.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Built near New Orleans

Industries and buildings this port serves

World Steel in the US

Projects we have shipped to the United States

All projects

Asked by US buyers

New Orleans shipping questions

Why choose New Orleans for a Mid-South job?

Its rail links reach Memphis, Chicago and Texas, so steel for Mississippi, Tennessee or Arkansas can ride rail from the port.

How deep is the Mississippi channel at New Orleans?

The federal channel has been deepened to 15.2 m (50 ft) from the Gulf through New Orleans.

What is the Louisiana International Terminal?

A new container terminal planned downriver at Violet, in St. Bernard Parish, expected to open in 2028.

Keep reading

Related pages

Other Gulf Coast ports

Building within reach of New Orleans?

Send the site address and what the building is for. Our engineers confirm the design basis, suggest the gateway port and Incoterm, and return a written scope for steel made in our Vietnam plant.