Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Tall lattice crane columns standing in a row on a World Steel project

Crane runway & industrial supports

Built for wheel loads and fatigue

Runway beams, brackets, stepped columns, equipment platforms and walkways designed to AISC and CMAA practice from the crane maker’s wheel loads. Our plant fabricates 2,500 t of structural steel a month and built the steel for the 5,000 t Sunpro Steel factory.

2,500 tfabricated per month
5,000 tSunpro Steel factory
2,000 tM&D warehouse, Thailand
AWS D1.8qualified WPS and welders

The runway, part by part

Everything between the wheel and the footing

WHEEL LOADS · IMPACT · FATIGUE

Runway beams

Built-up or rolled girders with cap channels where needed, checked for vertical, lateral and longitudinal crane forces.

Brackets

Cantilevered seats on the building column for lighter cranes.

Stepped columns

A crane leg and a roof leg in one column for heavier cranes.

Stops and ties

End stops, tie-backs and bracing that take the crane’s surge and impact.

Platforms and walkways

Access for crane maintenance along the runway.

Rails and electrification

Optional, from qualified makers, priced separately.

CMAA 70 service classes

How hard will the crane work?

The service class from the crane maker tells us how many load cycles the runway must survive. Pick a class.

CMAA service class

Class A

Standby

Precise handling at slow speeds with long idle periods, such as power stations.

Class B

Light

Light service with few lifts a day, such as repair shops and light assembly.

Class C

Moderate

Machine shops and paper mill machine rooms, with moderate lifts per hour.

Class D

Heavy

Heavy machine shops, foundries and fabricating plants with frequent near-capacity lifts.

Class E

Severe

Magnet, bucket and scrap yard cranes working near capacity all shift.

Class F

Continuous severe

Custom cranes at rated capacity continuously in severe conditions.

Summary of the CMAA 70 classes. The crane maker states the class for your crane.

Largest job on our books

Sunpro Steel factory: about 5,000 t

Heavy frames and tall columns for a steel factory in Can Tho City, Vietnam, designed, fabricated and supplied by World Steel in 2024. Tap a photo to open it full size.

Tall steel columns of the Sunpro Steel factory standing in a row Photo
Heavy steel frames of the Sunpro Steel factory during erection Photo
Inside the Sunpro Steel factory frame Photo
Overhead cranes above an aisle of fabricated members at the World Steel plant Photo

A project outside the US, shown for the structure type; it is not a US site.

US practice

How we engineer crane support

Crane support structures

Runway beams, brackets and stepped columns are designed for the wheel loads, impact and fatigue cycles the crane manufacturer provides, following AISC and CMAA practice.

Third-party equipment

Cranes and hoists come from qualified manufacturers; their certification, installation and load testing are separate from the steel structure.

Large-project capacity

Heavy industrial tonnage is routine here

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

In the catalog

Crane and industrial items in the catalog

Where it meets the other systems

Primary Structural System

Runway brackets and stepped crane columns are designed as part of the main frames.

Design limit: The crane maker must supply wheel loads, impact allowances and duty cycle before the frames are designed. · What gets checked: Runway position and level checked against the tolerance table.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Runway beams, brackets, stepped columns, stops and walkways designed for the crane maker’s loads
  • Fabrication with qualified weld procedures and inspection to the project ITP
  • Shop drawings with runway alignment data, at no extra cost
  • Cranes, hoists, rails and electrification from qualified makers, optional and priced separately

The US contractor, our customer

  • Crane certification, installation and load testing with the crane maker
  • Runway alignment survey and erection at site
  • Drawing approval, the PE seal and the permit with your Engineer of Record

Questions from US contractors

Crane runway questions and answers

6 answers, grouped by topic.

Design 3 answers

What do you need to design a crane runway?

The crane maker’s wheel loads, wheel spacing, span, lift height, speed and the CMAA service class. These set the runway beam, the column and the fatigue checks.

Which practice are runways designed to?

Runway beams, brackets and stepped columns are designed to AISC and CMAA practice for the wheel loads, impact and fatigue cycles the crane maker provides.

Bracket or stepped column: which do I need?

Brackets suit lighter cranes; stepped columns carry heavier cranes with a separate crane leg. The choice comes out of the design for your crane.

Cranes and rails 2 answers

Do you supply the crane itself?

Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.

Are rails and electrification included?

They are optional and priced separately. Your quote lists exactly what is in the runway package.

Large projects 1 answer

Have you built heavy industrial buildings?

Yes. Our largest job is the Sunpro Steel factory at about 5,000 t, and the plant fabricates 2,500 t of structural steel a month for heavy industrial work.

Keep reading

Related pages

Price it or partner with us

Send the crane maker’s data.

Wheel loads, span, lift height and service class are enough to start. We design the runway with the frame and fabricate it in our plant.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details