Colorado · Wind and hail
Structural steel for Front Range wind and hail
Along the foothills from Boulder to Golden, winter downslope winds can gust well above the usual design values, and some jurisdictions set their own wind speeds. Out on the plains east of Denver, the Front Range sits in one of the most hail-prone parts of the country. Both decide how doors, walls and roofs are framed.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed on the West Coast and railed to Denver for your Colorado site.
Summit registerFront Range wind and hail
- Foothills
- Downslope gusts
- Plains
- Frequent large hail
- Most exposed
- Doors, walls, roofs
- Our part
- Local wind values
Why it matters
Gusts at the door, hail on the roof
Downslope winds hit buildings at the foot of the mountains in strong, gusty bursts. Large doors, end walls and the bracing that carries the load to the ground need to be designed for the local wind value, which can be higher than the ASCE 7 map in some foothill towns.
On the plains, hail decides the roof and wall system. We frame for the panel and gauge your team chooses for hail, keep purlin spacing to suit it, and design door framing, bracing and anchorage for the site wind.
What we design and fabricate
Steel for wind and hail
Opening framing
Jambs and headers for doors under gust pressure.
Bracing
Wall and roof bracing that carries the gusts to the ground.
Anchorage
Base plates and anchor rods for uplift and shear.
Hail-ready roofs
Purlin spacing that suits the chosen roof panel.
Who does what
Wind and hail design, split clearly
World Steel supplies
- Frame, bracing and opening framing for the stated wind
- Roof and wall framing to suit the chosen panels
- Anchorage design for uplift and shear
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Local wind value confirmed by the Engineer of Record
- Roof panel and hail rating chosen with the owner and insurer
- Engineer of Record approval and PE seal
- Local permit and inspections
- Erection and site work
Colorado
What we do not claim
World Steel claims no hail rating for any roof. Roof panels carry their own impact ratings, chosen with your owner and insurer.
Colorado ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Colorado contractors
Colorado contractors: let’s win the next project together
If your next bid involves Front Range wind and hail, World Steel wants to be your long-term, win-win steel partner in Colorado. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Colorado project is cut, welded, inspected and packed.
Q&A
What Colorado buyers ask
Do foothill towns use higher wind speeds?
Some do. We take the local value where the jurisdiction sets one, otherwise ASCE 7 for the site.
Can the roof be designed for hail?
We frame the roof for the panel your team chooses for hail. The panel itself carries the impact rating.
Which openings need the most care?
Large doors and end walls facing the prevailing gusts, where jambs, headers and bracing carry the most load.
Official sources: ASCE Hazard Tool · NOAA National Weather Service Boulder
Colorado solutions
Every Colorado guide
Related pages
Code facts on this page summarize Colorado practice, local IBC adoption, county snow tables, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the county or city building department confirm the code and edition in force for your project.
Building in Colorado?
Send the drawings or the site address, size and use. We set the Colorado design basis with your Engineer of Record, design or detail the steel to your local code, snow table and wind, and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.