Wyoming · Mining
Structural steel for Wyoming coal and trona mines
The Powder River Basin around Gillette is the largest coal-producing region in the country, and the Green River Basin holds the largest trona deposits in the world, refined into soda ash. Their plants need process buildings, truck shops, crane bays and conveyor steel. We fabricate that steel to the owner’s specifications.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail along I-80 for your Wyoming site.
- Coal
- Powder River Basin
- Trona
- Green River Basin
- Typical steel
- Plants, shops, conveyors
- Spec
- Owner specifications
Why it matters
Mines at a huge scale
Haul trucks in the Powder River Basin are among the largest in the world, so their shops need very wide doors and heavy crane bays. Soda ash plants run process buildings with heavy equipment and dust.
We fabricate process buildings, crane bays and conveyor steel to the owner’s specifications and coat them for dust and weather.
What we design and fabricate
Steel for mines and mills
Process buildings
Mill, concentrator and truck shop buildings.
Crane bays
Crane columns and runways for maintenance.
Conveyor steel
Galleries, trestles and transfer towers to owner specs.
Coatings
Galvanizing or duplex systems for dust and weather.
Who does what
Mine steel, split clearly
World Steel supplies
- Process buildings, crane bays and conveyor steel
- Fabrication to owner specifications
- Coating systems for the exposure
- Packing for remote site delivery
- Tekla shop and erection drawings, included
The US contractor arranges
- Process design and equipment data from the owner
- Engineer of Record approval and PE seal
- Site access and foundations
- Mine safety and permits
- Erection and site work
Wyoming
What we do not claim
World Steel names no Wyoming mining company as a customer and claims no completed Wyoming mine project. Mine permits and safety are the owner’s scope.
Wyoming ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wyoming contractors
Wyoming contractors: let’s win the next project together
If your next bid involves coal and trona mines, World Steel wants to be your long-term, win-win steel partner in Wyoming. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wyoming project is cut, welded, inspected and packed.
Q&A
What Wyoming buyers ask
Do you work to mine owner specifications?
Yes. We fabricate to the owner’s project specifications and inspection plan.
Can you build large truck shops?
Yes. We frame shops with wide doors and heavy crane bays.
Do you handle mine permits?
No. Mine permits and safety are the owner’s scope.
Official sources: Wyoming Mining Association
Wyoming solutions
Every Wyoming guide
Related pages
Code facts on this page summarize Wyoming practice, the code that applies at your site, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wyoming?
Send the drawings or the site address, size and use. We set the Wyoming design basis with your Engineer of Record, design or detail the steel for Wyoming wind, drifting snow and northwest seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail along I-80 for the truck to your site.