Readiness check
Ready for California before your first drawing arrives
Every capability a California project needs, in one spec sheet, with the page where you can check it for yourself.
-
California Building Code
Ready
Design to the CBC edition in force at permit, ASCE 7-22 loads and local amendments, ready for your engineer’s review.
Steel building design → -
Seismic Design Categories D to F
Ready
Braced and moment frames designed and fabricated to AISC 341 and AISC 358, with seismic loads from ASCE 7-22 for your site.
AISC 341 seismic provisions → -
Seismic welding
Ready
Shop welding procedures and welders qualified to AWS D1.8, with demand-critical welds recorded member by member.
AWS D1.8 seismic welding → -
Traceable, tough steel
Ready
EN 10204 3.1 mill certificates by heat from mills in Vietnam, with Charpy V-notch results on request.
Toughness and mill certificates → -
Special inspection
Ready
In-plant inspection by your agency, in person or over live video, under IBC Chapter 17 and AISC 341 Chapter J.
Seismic inspection and QA → -
Accredited plant
Ready
The first and only fabricator in Vietnam accredited under IAS AC472; your building official decides how it is used.
IAS AC472 accreditation → -
Title 24 energy
Ready
Roof and wall systems and solar-ready roof framing set to the Title 24 path your energy consultant uses.
Title 24 energy guide → -
California gateways
Ready
Shipments planned to Los Angeles, Long Beach, Oakland or San Diego, packed in erection order.
California ports guide →
California guides, along the fault line
Seven in-depth guides for building in California
From mid-rise seismic frames to wildfire zones and the ports, each guide explains what California asks for and what we design and supply.
- Flagship Seismic multi-story buildings Mid-rise offices, clinics and mixed use in Seismic Design Categories D to F: AISC 341 systems, AWS D1.8 welds and in-plant inspection. Read the guide →
- Seismic design in California Seismic Design Categories, site class, near-fault sites and the steel systems that fit warehouses, plants and shops. Read the guide →
- Code, plan check and inspection The California Building Code, local amendments, plan check, DSA and HCAI review, special inspection and fabricator approval. Read the guide →
- Title 24 energy Insulation, cool roofs, daylighting and solar-ready roof framing for the California Energy Code path you use. Read the guide →
- Wildfire and WUI zones CBC Chapter 7A for Fire Hazard Severity Zones: noncombustible steel frames, metal envelopes and rated vents and openings. Read the guide →
- Warehouses and industry Distribution, cold storage, food processing, data centers and crane buildings, from the Inland Empire to the Central Valley. Read the guide →
- Ports and delivery Los Angeles, Long Beach, Oakland and San Diego, with packing in erection order and the Incoterm stated in writing. Read the guide →
Flagship solution
Multi-story steel for California’s seismic regions
A mid-rise in Los Angeles, the Bay Area or San Diego carries earthquake demands few buildings anywhere face. We fabricate its seismic frames, connections and floors to AISC 341 and AWS D1.8 in our own plant in Vietnam, with every weld, heat number and inspection recorded for your submittal.
- Special braced, BRB and moment frames
- AISC 358 connections
- AWS D1.8 welds
- CBC, DSA and HCAI paths
Solution advisor
Pick what you are building. We recommend the steel solution.
Our advice on the World Steel solution portfolio for California, project type by project type: where it is usually built, what we recommend and where to read more.

Distribution and logistics
Where in California
Inland Empire, the Central Valley and the ports corridor
We recommend
Clear-span or multi-span PEB frames with tapered built-up members, an ordinary seismic system where the category allows it, solar-ready roof framing and Title 24 envelope.
Warehouse buildings →Cross-dock buildings →Warehouses guide →
Ask about this project typeAcross California
Six regions, six different design drivers
California is several markets in one. This is what tends to drive the steel in each region; your site’s own data always decides.
Los Angeles and Orange County
High seismic categories near many mapped faults, city amendments, fabricator approval programs and tight urban sites.
Inland Empire
Large distribution buildings near the San Andreas and San Jacinto faults, with Title 24 solar and daylighting decisions on huge roofs.
San Francisco Bay Area
Hayward and San Andreas faults, soft bay soils, local amendments and dense multi-story work.
Central Valley
Food processing, cold storage and agriculture, with high summer heat and lower seismic values in parts of the valley.
Sierra Nevada and the north
Ground snow and drifting at elevation, wildfire hazard zones and long haul routes from the port.
San Diego and the border region
Coastal exposure, Rose Canyon and other faults, and a port option for southern sites.
The California ecosystem
Every product and solution a California project needs, in one place
Buildings, seismic structures, products, engineering, supply, delivery and industries, from one partner and one plant in Vietnam. Choose a group to see it.
The California ecosystem
Steel buildings
Buildings by use, engineered for California sites.
- Multi-story steel buildings
- Warehouse and distribution
- Cross-dock logistics
- Manufacturing with cranes
- Cold storage
- Data center shells
- Aircraft hangars
- Commercial shells
- Solar and EV canopies
- Agricultural buildings

How we work on a California project
From your soils report to a container in Long Beach
The same path for a warehouse in Ontario or a mid-rise in Oakland. You see every input and every decision before the steel is cut.
-
Site criteria
Risk category, site class, seismic category, wind, snow, fire zone and climate zone for your address.
-
Review path
Building department, DSA or HCAI, local amendments and the shop inspection plan agreed first.
-
Seismic system
Braced, moment or dual system set with your Engineer of Record, designed to AISC 341 and 358.
-
Drawing set
Calculations and drawings for your Engineer of Record’s approval; shop drawings included at no extra charge.
-
Made in Vietnam
AWS D1.8 welding, traceable steel and in-plant inspection, live in PEB Studio.
-
California port
Packed in erection order to Los Angeles, Long Beach, Oakland or San Diego.
-
Your contractor erects
Erection is the US contractor’s scope, working from our erection drawings.
Buying steel from outside the US
Worried about a fabricator outside the US? So were our California clients.
These are the questions California owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
- Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
- An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
- Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
- Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
- Real-time tracking in PEB Studio“How will I know where my order really is?”
- Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
- Incoterm and importer of record in writing“Who handles customs and duties?”
- One English-speaking project manager“Time zones and language will slow everything down.”
- Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
- Scope split agreed before you sign“Who is responsible for the design?”
- First and only IAS AC472 plant in Vietnam
- Designed to US codes
- Shop drawings at no extra charge
- Live production in PEB Studio
- Supplied to US contractors
Real World Steel photos
Every California building starts in our plant in Vietnam
Real photos from World Steel: the plant, the welding lines, seismic-grade members under inspection, packing and our own multi-story office frame. None is shown as a US site.
Worry-free shipping
Steel for your California project, without the shipping worries
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
-
Planned from your site date
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
-
The best-fit route to your site
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
-
Customs paperwork ready early
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
-
Loaded in erection order
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
-
One team that knows the US
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
-
Every container live in PEB Studio
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from California buyers
California questions we hear most
Are your buildings designed to the California Building Code?
Yes. We design the steel structure to the California Building Code edition in force at your permit date, with local amendments where your city or county has them, ASCE 7-22 loads for your site and AISC 341 seismic detailing where the system requires it. Your Engineer of Record reviews and approves our drawings, and the building department makes the permit decision.
Can a fabricator in Vietnam really handle California seismic work?
Yes, when the seismic requirements are built into the process. Our plant is the first and only fabricator in Vietnam accredited under IAS AC472, our welding procedures and welders are qualified to AWS D1.8, mill certificates with Charpy results are available by heat, and your special inspector can witness the work in person or over live video.
Do you hold DSA, HCAI or Los Angeles fabricator approval?
No, not in our own name. Public schools, hospitals and some cities run their own review and inspection programs. We plan the inspection path with your design team and building official before pricing, and support in-plant special inspection wherever an approval is not held.
Which California ports do you ship to?
Most often the Port of Los Angeles and the Port of Long Beach for Southern California and the Inland Empire, and the Port of Oakland for the Bay Area, Sacramento and the northern Central Valley. San Diego is used when it gives a shorter haul.
Do you erect buildings in California?
No. World Steel supplies the steel structure only, to US contractors. Erection is the contractor’s scope, done from our erection drawings and piece marks.
Are shop drawings included?
Yes. Shop drawings come with every project at no extra charge, and you follow your own members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Send the address. We tell you what California asks of your building.
Our engineers and project managers work in English and reply with the seismic, code, energy and fire-zone criteria for your site.
Keep reading
Building in California?
Send the site address, size and use. We set the California criteria with your Engineer of Record, design the steel to the California Building Code and quote it made in our plant in Vietnam, with the inspection path agreed in writing.















