Mid-rise frames
Downtown, NoMa, the Wharf
Columns, composite floors and braced cores.
College of Medicine, Philippines: multi-story steel frame by World Steel
Six avenues
From downtown and NoMa to the Navy Yard, the campus belt, the RFK campus, New York Avenue and east of the river, the District’s large projects gather in six places. Each has its own buildings and its own weather.
Offices, hotels and mixed use.
Mixed use, venues and waterfront work.
Campus additions and labs.
Venues, parks and public work.
Depots, service buildings and studios.
Hospitals, schools and new mixed use.
Offices, hotels and mixed use.
Navy Yard and the Wharf.
Universities and hospitals.
Venues and public work.
Depots and service buildings.
Hospitals and schools.
Washington, DC guides
One guide per DC condition: the construction codes, tight city sites, seismic, rooftop snow drift, the port route, and the mid-rise, campus and venue projects that drive the market.
Ready for Washington, DC
2,500 metric tons of structural steel a month from our own plant, released area by area.
Large-project program →Calculations that state the DC Construction Codes edition, District amendments and the loads.
DC Construction Codes guide →Steel packed by area and erection sequence, scheduled to the crane on a site with no laydown.
Tight city sites guide →AWS D1.8-qualified welding procedures and welders, with protected zones marked on request.
Demand-critical welds →The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.
IAS AC472 accreditation →Tekla shop and erection drawings for every Washington, DC project at no extra cost, ready for approval.
Shop drawings, included →Every member followed through cutting, welding, coating and loading in PEB Studio, from your office.
PEB Studio tracking →Solution advisor
Structural steel for the project types Washington, DC builds most, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Downtown, NoMa, the Wharf
Columns, composite floors and braced cores.
College of Medicine, Philippines: multi-story steel frame by World Steel
Foggy Bottom, Northwest, Ward 8
Stiff floors, interstitial steel and roof plant.
Boss Pharmacere factory, Thailand: plant steel by World Steel
Navy Yard and the RFK campus
Long-span roofs and trusses.
Hangar, Thailand: long-span World Steel frames
Navy Yard and Union Market
Podium frames and transfer steel.
Makro Prachinburi, Thailand: clear-span World Steel frames
New York Avenue and Northeast
Bus and maintenance depots.
M&D warehouse, Thailand: 2,000 t of World Steel structural steel
Blue Plains and the river
Plant buildings and equipment steel.
Interlink factory, Thailand: plant steel by World Steel
Across the District
Substation and plant steel to owner specs.
GPPD Energy factory, Vietnam: plant steel by World Steel
Parks and recreation sites
Recreation halls and canopies.
JSB warehouse, Thailand: clear-span World Steel frames
The Washington, DC ecosystem
Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.
Large Washington, DC structures, beyond metal buildings.
Complete buildings engineered for Washington, DC sites.
Members and parts made in our Vietnam plant.
The design basis your building official checks.
How you buy and follow your steel.
From the plant in Vietnam to your Washington, DC site.
Open call · Washington, DC contractors
Mid-rise offices and mixed-use buildings, hospital and university additions, labs, venues and service depots in the District are large steel packages on lots with no laydown room. You win the job, hold the street permits and run the site. We design, detail and fabricate the steel in our own plant, deliver it in erection order from Baltimore and back your bids with drawings and live tracking.
Where Washington, DC partners win with us
Buying steel from outside the US
The questions Washington, DC owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.
Real World Steel photos
Real photos from World Steel: the plant front, plate store, saw station, girders, weld checks, blasting, primed columns and packed stacks. None is shown as a Washington, DC site.
Worry-free shipping
Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.
We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.
West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.
The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.
The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.
A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.
Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.
Questions from Washington, DC buyers
The DC Construction Codes in Title 12 of the DC Municipal Regulations, which adopt the ICC codes with District amendments. The Department of Buildings reviews and permits projects, and third-party plan review is allowed. We confirm the edition and review path early.
We pack the steel by area and erection sequence so each truck carries what the crane lifts next. Your team holds the street occupancy and crane permits; we schedule loads to match.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match the erection sequence.
Our steel usually lands at the Port of Baltimore, about an hour by truck on I-95 and the Baltimore–Washington Parkway. Norfolk is the alternative. Members are packed in erection order.
No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, delivery, seismic and snow questions for your site.
Honest status. World Steel designs and fabricates to the DC Construction Codes and ASCE 7. We hold no state or local approval and no Washington, DC engineering license, and we do not submit plans for approval or apply for permits; the seal, the permit and inspections are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.
Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, prepare it for Department of Buildings review, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.