Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

From our plant in Vietnam to a Washington port

Washington is the US gateway closest to Asia by sea. Seattle and Tacoma, run together as the Northwest Seaport Alliance, handle containers for Puget Sound and the inland routes over the Cascades; Vancouver, Kalama and Longview on the Columbia River take breakbulk and project cargo. We pick the port with the shortest haul to your site.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Washington port.

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Washington project is cut, welded, inspected and packed.

Q&A

What Washington buyers ask

Which port will my steel arrive at?

The one with the shortest haul to your site and a suitable sailing: usually Seattle or Tacoma, or a Columbia River port for Southwest Washington.

Can long members ship as breakbulk?

Yes. Members too long for containers can ship as breakbulk to Tacoma or the Columbia River ports; we plan it with your logistics team.

Do winter passes affect delivery east of the Cascades?

They can. We plan deliveries over the passes with your trucker and leave room for chain-up and closure days in the schedule.

Official sources: Northwest Seaport Alliance

Washington solutions

Every Washington guide

Related pages

Code facts on this page summarize Washington rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in Washington?

Send the drawings or the site address, size and use. We set the Washington design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.