Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Texas structural steel solutions

Structural steel for large Texas projects, from the Gulf Coast to the Panhandle

Petrochemical plants on the Ship Channel, distribution campuses in Dallas–Fort Worth, data centers and factories along I-35: Texas buys steel in thousands of tons. We design it to the code your jurisdiction enforces, fabricate it in our own plant in Vietnam and ship it to Port Houston, Freeport or Corpus Christi.

Map of Texas with Port Houston, Port Freeport, the Port of Corpus Christi, Beaumont, the main cities and the I-35, I-10, I-45 and I-20 corridors GULF OF MEXICO Dallas–Fort Worth Austin San Antonio El Paso Midland–Odessa Amarillo Laredo Port Houston Port Freeport Port of Corpus Christi Beaumont
Gulf ports I-35, I-10, I-45, I-20 Cities

Ready for Texas

What a large Texas project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released in erection sequences for big Texas jobs.

Large-project program →

Code by jurisdiction

Design to the IBC edition your city enforces, or to the basis your Engineer of Record sets where no local code applies.

Texas codes and permits →

Gulf Coast windstorm

ASCE 7-22 wind design and records prepared for the inspection a TDI windstorm certificate requires.

Gulf Coast windstorm guide →

Petrochemical structures

Pipe racks, equipment structures and process buildings fabricated to owner and engineering-contractor specifications.

Petrochemical steel structures →

Accredited plant

The first and only fabricator in Vietnam accredited under IAS AC472, with mill certificates traced by heat.

IAS AC472 accreditation →

Shop drawings included

Tekla shop and erection drawings for every Texas project at no extra cost, ready for your engineer’s approval.

Shop drawings, included →

Live production tracking

Every member followed through cutting, welding, coating and loading in PEB Studio, from your Texas office.

PEB Studio tracking →

Texas gateways

Shipments planned to Port Houston, Freeport or Corpus Christi, packed in erection order for your site.

Texas ports guide →

Solution advisor

Pick what you are building. We recommend the steel.

Structural steel for the project types Texas builds most, with where they cluster and what we recommend.

Long Son petrochemical complex, Vietnam: 2,000 t of World Steel structural steel
Long Son petrochemical complex, Vietnam: 2,000 t of World Steel structural steel

Petrochemical and LNG facilities

Houston Ship Channel, Freeport, Beaumont–Port Arthur and Corpus Christi

Pipe racks, equipment structures, compressor shelters and process buildings in hot-dip galvanized or coated steel, fabricated to the owner’s specification with fireproofing coordinated where it applies.

M&D warehouse, Thailand: 2,000 t of World Steel frames during erection
M&D warehouse, Thailand: 2,000 t of World Steel frames during erection

Distribution and logistics

Dallas–Fort Worth, Houston, San Antonio and the Laredo corridor

Clear-span or multi-span frames with tapered built-up members, large roofs designed for Texas wind and hail exposure, and dock and cross-dock layouts.

Clear-span World Steel frame with tall columns and roof sheeting on, Vietnam
Clear-span World Steel frame with tall columns and roof sheeting on, Vietnam

Data centers

Dallas–Fort Worth, San Antonio, Austin and West Texas

Data hall frames, heavy roof equipment framing and phased campus steel, packed per building and phase.

Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel
Sunpro Steel factory, Vietnam: 5,000 t of World Steel structural steel

Manufacturing and crane buildings

Austin, San Antonio, the Rio Grande Valley and North Texas

Crane-served built-up frames, crane runway beams and mezzanines for plants that make semiconductors, vehicles, equipment and food.

GPPD Energy factory, Vietnam, steel by World Steel
GPPD Energy factory, Vietnam, steel by World Steel

Energy and utilities

Statewide, from the Permian to the coast

Equipment buildings, switchgear shelters, solar support steel and substation structures to the utility’s standards.

New Era cold storage, Vietnam, steel by World Steel
New Era cold storage, Vietnam, steel by World Steel

Cold storage and food processing

Houston, Dallas–Fort Worth, the Valley and the High Plains

Insulated metal panel envelopes, galvanized or duplex-coated steel for washdown areas and frames sized for refrigeration equipment.

Six-story World Steel frame with the floor deck in place
Six-story World Steel frame with the floor deck in place

Offices and multi-story commercial

Houston, Dallas, Austin and San Antonio

Multi-story steel frames with composite floors, braced cores and the connection design your Engineer of Record specifies.

Six Texas regions

What drives the steel design across Texas

Upper Gulf Coast and Houston

Hurricane wind, the TDI windstorm area along the coast, petrochemical plants, humid air and expansive Gulf Coast clays.

Dallas–Fort Worth and North Texas

Huge distribution and data center campuses, hail and severe thunderstorms, and Blackland Prairie clay under the slab.

Austin–San Antonio and the I-35 corridor

Manufacturing, technology and logistics growth, heat, and city codes that differ from one town to the next.

Corpus Christi and the Coastal Bend

Export terminals and industry, salt air and coastal windstorm rules for the counties along the bay.

West Texas and the Permian Basin

Oil and gas facilities, long haul distances, dust, heat and wide temperature swings.

Panhandle and the High Plains

Strong winds, hail, drifting snow at roof steps and agricultural and energy buildings far from the ports.

The Texas ecosystem

Every product and solution a Texas project needs, in one place

Structural steel by project type, building packages, products, engineering, supply and delivery: each one a page you can check.

Buying steel from outside the US

Buying structural steel from outside the US? Here is what Texas buyers check.

The questions Texas owners, contractors and engineers ask before they order steel made in Vietnam. Each one has a written answer and a page you can check.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

Real World Steel photos

Every Texas package starts in our plant in Vietnam

Real photos from World Steel: the plant, the welding lines, heavy girders under inspection, packing and loading. None is shown as a Texas site.

Drone view across the World Steel plant: office block in front, fabrication halls behind
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.
Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Quality inspector taking dimensions on a finished steel member
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.
Trucks loaded with fabricated steel leaving the World Steel plant, seen from the air
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).

Worry-free shipping

Steel for your Texas project, without the shipping worries

Our logistics team knows the US market: its gateway ports, customs entries, rail ramps and trucking rules. We plan backward from the date your site needs steel, pick the port and inland route that meet it fastest with the least risk, and show every container live in PEB Studio.

  • Planned from your site date

    We start from the day your erector needs steel and work backward to the production slot, the packing order and the sailing.

  • The best-fit route to your site

    West, Gulf or East Coast port, then truck or rail: we compare the options for your address and recommend the one that meets your schedule.

  • Customs paperwork ready early

    The full document set reaches your customs broker before the vessel arrives, and the quote already names the importer of record and who carries any Section 232 duties.

  • Loaded in erection order

    The first containers carry the first steel your crew sets. Large jobs can ship in lots that follow the erection sequence, so the site can start sooner.

  • One team that knows the US

    A dedicated project manager and our Westminster, California office coordinate with your forwarder, broker, trucker and erector, at hours that suit your time zone.

  • Every container live in PEB Studio

    Seal numbers, packing reports, documents and site readiness appear as they are released, so nobody chases a shipment by phone.

Questions from Texas buyers

Texas questions we hear most

Which building code will my Texas project be designed to?

The one your jurisdiction enforces. Texas cities adopt and amend the International Building Code locally, unincorporated county land often has no commercial building code, and the Gulf Coast adds the Texas Department of Insurance windstorm rules. We confirm the edition with your Engineer of Record and building official, then design the steel to it with ASCE 7-22 loads for your site.

Do you hold a TDI windstorm certificate or TWIA approval?

No. Windstorm certificates are issued by the Texas Department of Insurance for a building after inspection by a TDI-appointed engineer arranged for that project. We prepare the wind design, drawings and records that inspection needs; the certificate is for the building, never for a fabricator.

Can you take the steel package of a large Texas project?

Yes. Our plant fabricates 2,500 metric tons of structural steel a month, and our largest jobs include Sunpro Steel at 5,000 t and the Long Son petrochemical complex at 2,000 t, a plant of more than 56,000 m² (600,000 sq ft). Large Texas packages are released in erection sequences and shipped as they are fabricated.

Which Texas ports do you ship to?

Most often Port Houston for Houston, Dallas–Fort Worth, Austin and San Antonio. Port Freeport and the Port of Corpus Christi suit Gulf Coast and South Texas sites, and Galveston or Beaumont can work for project cargo. We pick the port with the shortest haul to your site.

Do you erect the steel in Texas?

No. World Steel supplies the steel structure only, to US contractors who are our customers. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Are shop drawings included?

Yes. Shop drawings come with every project at no extra charge, and you follow your members through cutting, welding, coating, QC release and loading in PEB Studio.

Talk to an engineer

Send the address. We tell you what Texas asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, soil and port questions for your site.

Honest status. World Steel designs and fabricates to the code your Texas jurisdiction enforces and ASCE 7-22. We hold no TDI windstorm certificate, TWIA eligibility, city approval or Texas engineering license; drawing approval, the PE seal and the permit are the US contractor’s scope with their Engineer of Record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Building in Texas?

Send the drawings or the site address, size and use. We set the Texas design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.