Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Pedestrian bridges · For US contractors

Steel pedestrian bridges, fabricated at large-project scale

Footbridges over rivers, roads, rail lines and plant yards, skywalks between buildings and the stair towers that reach them. We design and fabricate the steel in our own plant in Vietnam, trial-assemble the spans and ship them to your US port in segments your crew can lift.

2,500 tof structural steel a month
16footbridges for one program in Guyana
47.5 mlongest span in that program (156 ft)
Diagram · Warren truss footbridgeWorld Steel · Vietnam

Large-project capacity

A bridge fabricator that also carries the rest of your job

A footbridge is rarely the whole job. It comes with the station, the campus, the plant or the road program around it, and the same contractor wants one fabricator for all of it. Our plant fabricates 2,500 metric tons (about 2,750 US tons) of structural steel a month, so the bridges run beside the buildings.

Own plant, IAS AC472

The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year.

Built-up lines in house

Chords, girders and box members welded on automatic beam lines, plate cut by CNC and laser up to 100 mm thick.

Tracked live

Every piece of every span followed in PEB Studio from cutting to container.

Largest single jobs, metric tons

CPV Food Processing Factory 2,500 t
Long Son petrochemical complex 2,000 t
M&D (MD Factory) 2,000 t
Tongwei Tien Giang feed factory, phase 1 1,500 t

Plant output: 2,500 t (about 2,750 US tons) a month. How large jobs run

Bridges we have built

Three footbridge jobs, three different structures

A U-frame over a canal, a through truss that carries people and pipes, and a program of eighteen box trusses: each solved a different problem in the shop.

3D design model of two enclosed steel box-truss footbridges either side of an existing road bridge in Guyana 2026

River and creek crossings, Guyana

18 pedestrian bridges, Guyana

Enclosed steel box-truss footbridges built in pairs beside existing road bridges, spans 26 m to 47.5 m (85 to 156 ft).

16footbridges
26 to 47.5 m85 to 156 ft spans
4.3 kN/m²90 psf crowd load
4span lengths, one design family
How the program ran
Finished grey steel through-truss of the CP4 bridge on its supports in Singapore 2020

Singapore

CP4 Steel Bridge, Singapore

A grey steel through-truss with a checker-plate walkway and pipe saddles, trial-assembled in our plant and lifted at night over a waterway.

Through trussopen top, portal ends
Walkwaychecker plate, handrails
Pipe saddlesservices carried in the deck
One nightlift beside a live road
Project page
Red steel portal frames of the Singapore footbridge in a row along the deck 2025

Singapore

Footbridge, Singapore

A red bolted U-frame footbridge over a canal between housing blocks, with perforated walkway plates and friction-grip splices.

U-frameportal frames on a girder deck
Boltedfriction-grip splices
Perforatedwalkway plates
Canalcrossing in a housing estate
Project page

Who does what

We make the steel. Your team builds the bridge.

World Steel

  • Steel design to the code the owner names, with calculations for your Engineer of Record
  • Proposal, approval, shop and erection drawings at no extra cost
  • Trusses, girders, floor beams, deck plate, handrails, stair towers and bearings plates
  • Trial assembly, blasting and coating in our plant, with records in PEB Studio
  • Segments packed in erection order and shipped to your US port

The US contractor, our customer

  • Drawing approval, the PE seal and the permit, with your Engineer of Record
  • Abutments, piers, foundations and bearings
  • Road, rail or river closures, the lift plan and the cranes
  • Erection, deck finish, lighting, canopies and fit-out
  • Import, customs and inland haul as the Incoterm sets out

In our plant, 2026

The Guyana footbridges on the shop floor

Chords, gussets and splice plates for eighteen bridges, cut, welded, drilled and marked in our plant in Vietnam.

Overhead crane moving long welded bridge girders along the shop
Drilled splice bolt patterns on the ends of welded bridge girders
Bridge chords with triangular gusset plates welded on for the truss diagonals
Operator at the CNC cutting table nesting connection plates
Two fitters fitting cross-member cleats to a bridge chord
Automatic H-beam assembly and welding machine with its operator
Crew sorting stacks of cut gusset and splice plates
Fitter drilling a stiffened bridge girder marked with its piece mark

Questions

Pedestrian bridges: what US contractors ask first

Does World Steel fabricate steel pedestrian bridges?

Yes. We design and fabricate steel truss and girder footbridges, skywalks, utility walkways and their stair towers. Our references include the Footbridge and the CP4 Steel Bridge in Singapore and 18 pedestrian bridges for Guyana with spans from 26 m to 47.5 m (85 to 156 ft).

How large a bridge program can you take on?

Our plant fabricates about 2,500 metric tons (2,750 US tons) of structural steel a month, and our largest single jobs reach 5,000 t. A program of footbridges, or a footbridge inside a larger station or campus package, fits beside our other work.

Do you install the bridge?

No. World Steel supplies the steel structure. Erection, the lift and site work are the scope of the US contractor, our customer. We supply erection drawings, match-marked pieces and lifting information so the crew can set the span.

Who approves and seals the design?

The US contractor and its Engineer of Record. We deliver calculations and drawings ready for their review and approval; the PE seal and the permit are theirs.

Which design code do you use?

The code the owner and the Engineer of Record name, usually the AASHTO guide specification for pedestrian bridges, with AISC 360 for the steel and AWS D1.1 for welding unless the specification calls for another welding code.

Can your steel be used on a federally funded bridge?

Federally funded highway and transit work often requires steel produced in the United States, which steel made in Vietnam does not meet. Our bridges suit private, campus, industrial and locally funded work. Check the funding rules before you bid.

Is World Steel a certified bridge fabricator?

Our plant is accredited under IAS AC472. Some owners ask for a specific bridge fabrication certification; tell us what the specification requires at bid stage and we will say plainly whether we meet it.

How does a long span get to the US?

It is fabricated in segments that fit a 40 ft container or a flat rack, trial-assembled in our plant, then shipped in erection order with bolted field splices. The guide to shipping long spans shows how.

Bidding a footbridge, or a program of them?

Send the general arrangement, the span and width, the design code and the site. We return a written scope for the steel, designed to US codes, trial-assembled in our plant and shipped to your US port.