River and creek crossings, Guyana
18 pedestrian bridges, Guyana
Enclosed steel box-truss footbridges built in pairs beside existing road bridges, spans 26 m to 47.5 m (85 to 156 ft).
Large-project capacity
A footbridge is rarely the whole job. It comes with the station, the campus, the plant or the road program around it, and the same contractor wants one fabricator for all of it. Our plant fabricates 2,500 metric tons (about 2,750 US tons) of structural steel a month, so the bridges run beside the buildings.
The first and only fabricator in Vietnam accredited under IAS AC472, audited twice a year.
Chords, girders and box members welded on automatic beam lines, plate cut by CNC and laser up to 100 mm thick.
Every piece of every span followed in PEB Studio from cutting to container.
Largest single jobs, metric tons
Plant output: 2,500 t (about 2,750 US tons) a month. How large jobs run
Bridges we have built
A U-frame over a canal, a through truss that carries people and pipes, and a program of eighteen box trusses: each solved a different problem in the shop.
River and creek crossings, Guyana
Enclosed steel box-truss footbridges built in pairs beside existing road bridges, spans 26 m to 47.5 m (85 to 156 ft).
Singapore
A grey steel through-truss with a checker-plate walkway and pipe saddles, trial-assembled in our plant and lifted at night over a waterway.
Singapore
A red bolted U-frame footbridge over a canal between housing blocks, with perforated walkway plates and friction-grip splices.
Eight guides
Who does what
Where they go
Who commissions footbridges in the US: pedestrian bridges by market. The code behind the design: pedestrian bridge standards.
In our plant, 2026
Chords, gussets and splice plates for eighteen bridges, cut, welded, drilled and marked in our plant in Vietnam.
Questions
Yes. We design and fabricate steel truss and girder footbridges, skywalks, utility walkways and their stair towers. Our references include the Footbridge and the CP4 Steel Bridge in Singapore and 18 pedestrian bridges for Guyana with spans from 26 m to 47.5 m (85 to 156 ft).
Our plant fabricates about 2,500 metric tons (2,750 US tons) of structural steel a month, and our largest single jobs reach 5,000 t. A program of footbridges, or a footbridge inside a larger station or campus package, fits beside our other work.
No. World Steel supplies the steel structure. Erection, the lift and site work are the scope of the US contractor, our customer. We supply erection drawings, match-marked pieces and lifting information so the crew can set the span.
The US contractor and its Engineer of Record. We deliver calculations and drawings ready for their review and approval; the PE seal and the permit are theirs.
The code the owner and the Engineer of Record name, usually the AASHTO guide specification for pedestrian bridges, with AISC 360 for the steel and AWS D1.1 for welding unless the specification calls for another welding code.
Federally funded highway and transit work often requires steel produced in the United States, which steel made in Vietnam does not meet. Our bridges suit private, campus, industrial and locally funded work. Check the funding rules before you bid.
Our plant is accredited under IAS AC472. Some owners ask for a specific bridge fabrication certification; tell us what the specification requires at bid stage and we will say plainly whether we meet it.
It is fabricated in segments that fit a 40 ft container or a flat rack, trial-assembled in our plant, then shipped in erection order with bolted field splices. The guide to shipping long spans shows how.
Send the general arrangement, the span and width, the design code and the site. We return a written scope for the steel, designed to US codes, trial-assembled in our plant and shipped to your US port.