Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Haiti steel solutions

Structural steel for large Haiti projects, designed for earthquakes and storms

Haiti sits on two major faults and in the path of Atlantic hurricanes. The earthquakes of 2010 and 2021 showed how deadly heavy, brittle buildings can be. Schools, hospitals, warehouses, markets and factories now need to be built light and ductile. We design and fabricate their steel in our own plant in Vietnam, 2,500 t a month, with AWS D1.8-qualified welders, and ship it packed in erection order to Port-au-Prince or Cap-Haïtien.

L’Union fait la force · Unity is strength

Large-project capacityIAS AC472

2,500 t

of structural steel a month, own plant in Vietnam, shipped to Port-au-Prince or Cap-Haïtien

Mobile crane lifting a member into a multi-story steel frame
Going up beside the plant in Vietnam: World Steel framed its own office building.

Why World Steel

What a large Haitian project gets from World Steel

Large-project capacity

2,500 metric tons of structural steel a month from our own plant, released area by area.

Large-project program →

Seismic frames

Ductile frames detailed to AISC 341 and welded by AWS D1.8-qualified welders.

Earthquake guide →

Hurricane and flood design

Frames, cladding and anchors designed for the storm, with floors set above the flood.

Hurricane and flood guide →

Ready for review

Calculations that state the code basis for your engineer and the reviewers.

Building code guide →

Records for funders

Mill certificates, weld and coating records for every member, ready for inspectors.

Schools and public works guide →

Shipped to your port

Packed in erection order and shipped to Port-au-Prince or Cap-Haïtien.

Port delivery guide →

Ten departments, one republic

Pick your department. Each one has its own steel page.

Haiti has ten departments, from Ouest with Port-au-Prince and Nord with Cap-Haïtien and the Citadelle, through the rice valley of the Artibonite and the Central Plateau, to the long southern peninsula of Sud, Nippes and Grand’Anse. Each page covers the department capital, the ground, the earthquake, hurricane and flood conditions, the route from the port and the steel we recommend for what gets built there.

NorthArtibonite and CentreWest and south-eastSouthern peninsula

North

Nord-Ouest, Nord and Nord-Est: Cap-Haïtien, the Citadelle and the industrial parks near the border.

Artibonite and Centre

The rice valley of the Artibonite and the Central Plateau up to the Dominican border.

West and south-east

Ouest with Port-au-Prince and the Gonâve island, and Sud-Est with Jacmel.

Southern peninsula

Nippes, Sud and Grand’Anse: Les Cayes, Jérémie and the long south-western peninsula.

National symbols of Haiti

Built with respect for Haiti

Blue and red, the two peoples united, and at the centre the royal palm topped with the cap of liberty over the cannons and the motto L’Union fait la force. Four national symbols, and what each one means for the steel we make for Haitian buildings.

The royal palm

At the centre of the arms, the palm topped by the cap of liberty. Tall, light and flexible in the wind, the way a steel frame should be.

The Citadelle Laferrière

The mountain fortress near Cap-Haïtien, built after independence and still standing. Proof that buildings made right can last.

The Hispaniolan trogon

The national bird, the ‘kanson fèt’, in the flag’s blue and red. Our coatings are chosen with the same care for the climate.

Blue and red, 1804

The first free Black republic, founded in 1804. Unity is strength, the motto on the arms, is how a frame carries its load.

Project types

What Haiti builds in steel, and where

The four project types behind most steel orders in the country, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.

Warehouse frame from above, purlins and girts fixed to the rafters and columns

Warehouses and logistics

Port-au-Prince, Cap-Haïtien, Les Cayes, Gonaïves

Clear-span warehouses for food, relief stocks and imports, near the ports and the main roads.

Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.

Stiffened heavy plate girders resting on shop supports

Factories and industrial parks

Nord-Est, Ouest

Apparel and assembly plants and workshops in the industrial parks and free zones.

Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Buy it all in one place · Haiti

Everything your project in Haiti needs in steel, from one desk

Schools, hospitals and public buildings, warehouses and industrial parks. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Port-au-Prince, with every piece tracked live in PEB Studio.

All solutions and products for Haiti
SupplierWorld Steel, own plant in Vietnam
Port of dischargePort-au-Prince
TermsFOB Vietnam or CIF Port-au-Prince
ErectionYour contractor

Picked for Haiti

One desk, every step

  1. DesignTo the basis your engineer of record sets
  2. DrawingsShop and erection drawings, no extra cost
  3. MaterialsNamed mills, a mill certificate for each piece
  4. FabricationLaser cut up to 100 mm, 2,500 t a month
  5. CoatingPaint brands sold locally, galvanizing where needed
  6. Quality controlAn ITP per project, ILAC-accredited labs
  7. PackingErection order, piece marks, packing lists
  8. ShippingFOB Vietnam or CIF Port-au-Prince
  9. Your contractor erectsClearance at Port-au-Prince, site work and erection, with the engineer of record.
FOBVietnam port, your forwarder
CIFPort-au-Prince, freight and insurance by us
Track it live in PEB Studio →

No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.

Seeking Haitian contractor partners

Haitian contractors: you win the job, we fabricate the steel

Schools, hospitals, warehouses, markets and factories across Haiti are big steel packages, often funded by development partners with strict seismic and quality requirements. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Port-au-Prince or Cap-Haïtien and back your bid with drawings, inspection records and live tracking.

  • Schools and hospitals built for earthquakes
  • Warehouses for food and relief stocks
  • Factories in the industrial parks

Hurricanes, salt air, earthquakes

Steel for Haiti’s storms and sea

A broad hazard picture for Haiti and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.

All Caribbean hurricane and marine guides

Real World Steel photos

Every Haiti package starts in our plant in Vietnam

Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Haiti.

Gate of the World Steel plant with the office block and two of its fabrication halls
The plant that fabricates US orders: World Steel in Tay Ninh Province, Vietnam (Hai Son Industrial Park, formerly Long An).
Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Two welders operating a submerged-arc welding station on a member
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Operator checking web and flange plates set in blue H-beam assembly jigs
Web and flange plates set in the H-beam assembly jigs before automatic welding, Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Crew loading steel parts onto the shot-blasting conveyor
Parts going into the blaster ahead of primer, World Steel, Vietnam.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Caribbean logistics

Ports for Haiti: shipped from our plant in Vietnam

All Caribbean ports and routes

Questions from Haitian buyers

Haiti questions we hear most

Which building rules apply to steel buildings in Haiti?

The Haiti National Building Code (CNBH, 2012) sets the design rules, with the Ministry of Public Works (MTPTC) and the communes involved in permits. It draws on US standards such as the IBC, ASCE 7 and AISC for loads and steel design. We state the code basis your engineer of record sets on the first calculation sheet.

How serious is the earthquake risk in Haiti?

Very serious. The Enriquillo-Plantain Garden fault crosses the south and caused the 2010 and 2021 earthquakes; the Septentrional fault runs along the north coast. Steel frames are designed for the high seismic values your engineer sets, with ductile detailing to AISC 341.

Do hurricanes hit Haiti?

Yes. Hurricane Matthew struck the southern peninsula in 2016, and storms such as Jeanne in 2004 caused deadly floods. We design for the wind speed and exposure your engineer sets for the site.

How large a package can you take?

Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.

Which port do you ship to?

Port-au-Prince or Cap-Haïtien, confirmed with the importer for each shipment. From there steel goes by road to site.

Do you erect the steel?

No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.

Talk to an engineer

Send the department and the plan. We tell you what Haiti asks of your steel.

Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.

Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Haiti and the US standards it references. We hold no approval, licence or registration in Haiti and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.

Keep reading

Contact World Steel · Haiti

Talk to us about steel for Haiti

WhatsApp, email or a video call with our engineers, booked at an hour that suits Port-au-Prince. Our contact page for Haiti has the ports, the local time and the form.