-
Email
Drawings, questions and quote requests from any Caribbean country, read by our sales and engineering team.
dang.victor@worldsteelgroup.com -
Phone & WhatsApp
International calls reach our head office in Vietnam. Tell us your island and time zone.
+84 902 881 833 WhatsApp +84 902 881 833 -
Video call
Walk through drawings with an engineer, or watch an inspection live at our plant in Vietnam.
Ask for a call -
Contractors
You win the job and build it; we design, detail and fabricate the steel and ship it to your port.
Contractor partnership
Contact pages by country
Pick your country. Each one has its own contact page.
Each page shows the local time, the ports we ship to, the questions contractors there ask first and a form with your country already filled in.
CARICOM members
15 member statesCARICOM associate members
5 territoriesCaribbean neighbours
6 countries and territoriesSend us a message
Tell us about your Caribbean project
A few lines are enough to start: the country and island, what you are building and a rough size. You get a reference number by email straight away, and a member of our team replies with questions or a written scope of supply.
Who reads your message
The team that answers the Caribbean
One sales team answers contractors, owners and engineers across the Caribbean, from our head office in Vietnam and our office in California.
Before you write
Questions Caribbean contractors ask first
Does World Steel have offices in the Caribbean?
No. World Steel answers Caribbean projects from its head office and plant in Vietnam and its US office in Westminster, California. We work with contractors in each country: they win the job and build it, we design, detail and fabricate the steel and ship it to their port.
Which countries do you serve?
All 15 CARICOM members, the five associate members and six neighbours: the Dominican Republic, Puerto Rico, the US Virgin Islands, Aruba, Curaçao and Sint Maarten. Each has its own contact page with its ports, its local time and the questions contractors there ask first.
How do I reach you fastest?
WhatsApp or call +84 902 881 833, or send the form on this page with your drawings attached. Tell us your country and your time zone, and we set up calls inside your working day.
Do you erect the steel or file the permit?
No. World Steel supplies the steel structure only. The contractor, our customer, erects it, and the engineer of record in your country approves the drawings and takes them through the permit. We give your engineer calculations, shop drawings and erection drawings to work from.
Do you publish prices?
No. Every structure is designed for its site, its loads and its code basis, so each quote is written for its project. Send what you have and you receive a scope of supply with the price, FOB Vietnam or CIF to the port we suggest.
Made in Vietnam. Shipped to your Caribbean port.
Send a footprint, a sketch or a full drawing set with the country and island. You get a technical review and a scope of supply for the steel and the freight to your port.