Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Digital project control · PEB Studio

Trace any member on your job back to the heat it was rolled from

You will not stand on our shop floor every day, so the records stand there for you. PEB Studio ties every piece mark to its mill heat, its welds, its inspections and its coating readings, live, and builds the Manufacturing Data Record from that same data.

Sample data

Piece mark

C-12 · Column, grid B/4

  1. Mill heatHeat 24A-7731 · EN 10204 3.1 Filed
  2. CutPlate 25 mm · nest N-118 Done
  3. WeldedWPS-07 · welder W-23 Done
  4. InspectedVisual + UT per ITP Passed
  5. CoatedDFT 215 µm average Recorded
  6. PackedBundle B-09 Locked
  7. ShippedContainer 4 of 11 Sealed

Built-in rules

Four things PEB Studio will not let anyone skip

Good intentions do not trace steel. These locks sit in the software, so they hold on every shift and every job.

No heat, no cut

A plate without a matched mill certificate cannot be released to cutting, so no untraceable steel enters your job.

No sign-off, no next station

The process tag needs the worker, the foreman and QC. A missing signature puts the member on hold.

No open inspection in a bundle

Members with an open check or an open NCR cannot be scanned into a bundle or onto a packing list.

No gaps in the record

Before the data record is released, PEB Studio lists any certificate or report that has not been uploaded yet.

From your office in the US

What your team can do with it

Read a member’s history

Point a phone at the QR label on a column or rafter to see which mill heat it came from, who fabricated it and which inspections it cleared.

Follow the inspection log

Every inspection, nonconformance report and sign-off is kept per project and per member, so nothing unresolved slips onto a truck.

Take a permit-ready record

Your permit file gets its Manufacturing Data Record straight from that data, not from a binder typed up at the end.

Records in your handover

  • Every mill certificate, filed under its heat
  • Welding procedures (WPS and PQR) and welder qualifications
  • Inspection and Test Plan, signed by both parties
  • NDT results (UT, MT, PT, VT) to the extent your specification sets
  • Dimensional check reports
  • Coating readings: blast profile, film thickness, adhesion
How the data book is put together →
PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

PEB Studio is World Steel’s in-house project control platform. Screens shown in demonstrations carry synthetic data unless marked otherwise, and client access to live project records is switched on project by project.

Questions

Questions about traceability and PEB Studio

Can we trace a member back to its mill certificate?

Yes. The heat number is entered when plate and coil arrive, before any cutting, and every part cut from that plate inherits it. Scan the QR label on the member, or search its piece mark in PEB Studio, to see the heat, the EN 10204 3.1 certificate and every check it passed.

Do we get live access or a report at the end?

Live access. Your team logs in to PEB Studio and follows your members through cutting, welding, inspection, coating, packing and loading as the records are made. Access is switched on project by project.

What is the Manufacturing Data Record?

The MDR is the set of quality records for your job: mill certificates, welding procedures and welder records, the ITP, inspection and test reports, coating readings and packing lists. PEB Studio builds it from the same data recorded on the shop floor and flags anything missing before release.

Is the data in the demo real?

No. Screens shown in demonstrations carry synthetic data unless marked otherwise. On a live project you see your own members and records.

Can our inspector use PEB Studio too?

Yes, on request. Your QA agency or special inspector can be given access to the inspection log and records for your project.

See your next job in PEB Studio

Send your drawings or bid package. We show you how each member would be traced, who signs each step and what lands in your data record, from a plant that fabricates 2,500 metric tons a month.

Download center

Documents to download

All documents

Certificates & accreditations

See all Certificates & accreditations