World Steel USA

Building package · Warehouse & distribution

Your racking sets the frame. We make it at any size.

A distribution center is a racking plan with a roof over it. World Steel, a structural steel fabricator producing 2,500 t (5.5 million lb) a month in our own plant in Vietnam, lays the frames on your racking, fabricates warehouses of any footprint and ships them zone by zone to your US contractor.

Drone view of a 36 × 114 m steel warehouse frame by World Steel during erection
Largest published footprint
36 × 300 m (118 × 984 ft)
Capacity
2,500 t (5.5 million lb) a month
Designed to
IBC 2024 · ASCE 7-22 · AISC 360
Shop drawings
Included at no extra charge

Racking first

Pick your racking. Watch the column grid follow.

Pallet racks, aisles and trucks decide where columns may stand and how wide the frames must span. Choose a racking type to see how the plan changes. Red squares are columns; blue bars are racks.

Racking type

Selective pallet racking

Every pallet reachable from an aisle. The most common layout.

  • Column lines placed in the flue between back-to-back rack runs
  • Bay spacing chosen to fit whole rack bays between frames
  • Clear height set by the top beam level plus sprinkler clearance

Narrow aisle

Narrower aisles with turret or reach trucks, more pallets per square foot.

  • Taller racking, so more clear height at the eave
  • Tighter floor flatness for the trucks, coordinated with the slab contractor
  • Columns kept to the rack lines so aisles stay clear

Drive-in and block storage

Deep lanes for one product, few aisles, the highest density.

  • Wide clear spans so lanes are not broken by columns
  • Heavier frames for the longer span, compared by steel weight
  • Doors and docks placed at the ends of the lanes

Drawings for illustration only. Your racking supplier’s layout and your Engineer of Record’s loads set the real grid; we compare options by steel weight in the proposal.

Built to a US distribution spec

The spec sheet a leasing broker reads first

US distribution buildings are judged on a short list of numbers. Here is what decides each one and how we design the steel around it.

Spec lineWhat decides itWhat World Steel does

Clear height

Racking, sprinklers and target tenants; often 9.8 to 12.2 m (32 to 40 ft)

Keep it clear below every member, joist and main

Column grid

Rack layout and aisle widths; grids near 15 m (50 ft) are common

Columns placed in the flue spaces, not the aisles

Speed bay

Staging depth behind the dock doors

A wider first bay along each dock wall

Sprinklers

ESFR design by the fire protection engineer

Roof steel sized for mains; clearances on our drawings

Roof loads

Solar-ready roof, rooftop units and future racks

Collateral loads agreed and designed in from the start

Expansion

Phase two along the long wall

End or side wall framed to come off later

Typical market values for reference only. Your racking, fire protection and leasing goals set the real spec.

Large projects, already built

Warehouses we have framed, drawn to the same scale

Every plan below is a published World Steel warehouse, drawn at one scale next to an American football field. Big footprints are routine work for our plant.

Warehouse 36 × 300 m, Thailand 10,800 m² (116,000 sq ft)
Warehouse 40 × 240 m, Thailand 9,600 m² (103,000 sq ft)
CPE warehouse 80 × 120 m, Thailand 9,600 m² (103,000 sq ft)
Warehouse 50 × 140 m, Thailand 7,000 m² (75,000 sq ft)
JSB warehouse 55 × 127 m, Thailand 6,985 m² (75,000 sq ft)
Warehouse 53 × 120 m, Thailand 6,360 m² (68,000 sq ft)
Warehouse 72 × 74 m, Thailand 5,328 m² (57,000 sq ft)
Warehouse 36 × 114 m, Thailand 4,104 m² (44,000 sq ft)
For scale: a US football field110 × 49 m (360 × 160 ft) with end zones

Plan sizes as published by World Steel. Projects outside the US, shown for the building size; they are not US sites.

Fabrication capacity

Big boxes need a big shop behind them

2,500 metric tons a month

About 2,750 short tons of structural steel fabricated every month in World Steel’s own plant in Vietnam.

Big tonnage does not have to queue behind other work. The plant is sized to take the steel package of a large US job, from heavy frames and built-up girders to multi-story framing, and to ship it to your US port in the order your erector needs it.

Largest jobs delivered: Sunpro Steel 5,000 t · CPV Food 2,500 t · Long Son petrochemical 2,000 t · M&D Thailand 2,000 t →

Real World Steel frames

Long rows of strong frames

Warehouse frames from World Steel’s plant, standing on site. Tap a photo to open it full size.

Inside a finished steel warehouse with blue portal frames Photo Warehouse 36 × 114 m
Long warehouse interior with steel frames and an interior column line Photo JSB 55 × 127 m
Drone view of a square steel warehouse frame with purlins Photo Warehouse 72 × 74 m
Tall steel frames standing at the end of an 80 m wide warehouse Photo Mongkolphisan 80 × 70 m
Wide steel warehouse frames during erection Photo CPE 80 × 120 m

Projects outside the US, shown for the structure type; they are not US sites.

The warehouse ecosystem

From your racking plan to your loading dock

One line from layout to erection. Each stop links to the pages and products behind it.

  1. Racking plan

    Your layout and trucks set the grid.

  2. Frame design

    Clear spans or interior columns, compared by weight.

  3. Fabrication

    2,500 t a month in our own plant.

  4. Packed by zone

    Bundled in erection order, labeled to the drawings.

  5. US port

    Containers or breakbulk to the port in your quote.

  6. Your dock

    Erection by the US contractor, our customer.

Finished steel warehouse with office block seen from a drone Photo
Drone view of a long red steel warehouse frame with purlins Photo
Empty steel warehouse interior with light frames Photo
Drone view of a large steel warehouse frame in Thailand Photo

Buying steel from outside the US

Every worry about an overseas fabricator, answered in writing

US buyers ask us the same ten questions before they order steel made in Vietnam. Here is what we do about each one, and where you can check it for yourself.

  • Designed to US codes, ready for your engineer’s review“Will steel designed overseas pass US plan check?”
  • An accredited plant you can inspect, live“I can’t see the quality from across the Pacific.”
  • Mill certificates by heat number“Will the materials be traceable to the grade on the drawings?”
  • Modeled, approved, then measured“What if pieces don’t fit when they reach the site?”
  • Real-time tracking in PEB Studio“How will I know where my order really is?”
  • Packed in erection order, listed per container“Ocean freight scares me: damage, missing pieces, a port I don’t know.”
  • Incoterm and importer of record in writing“Who handles customs and duties?”
  • One English-speaking project manager“Time zones and language will slow everything down.”
  • Your US contractor erects, with our drawings“Who erects it, and who stands behind the field work?”
  • Scope split agreed before you sign“Who is responsible for the design?”
Read every answer
  • First and only IAS AC472 plant in Vietnam
  • Designed to US codes
  • Shop drawings at no extra charge
  • Live production in PEB Studio
  • Supplied to US contractors

What the package contains

Components in this package

Start with the racking layout, the dock count and the forklift aisles, and the building width almost designs itself. We frame the warehouse around those three numbers, then check the roof for your site’s ground snow load and the walls for its basic wind speed under ASCE 7-22. Your erector receives the steel bundled in the order the bays go up.

standard = in the base scope · optional = add if you want it · confirm = depends on your design

Primary Structural System

Secondary Framing

Roofing System

Wall & Cladding System

Doors & Building Openings

Mezzanines & Floor Systems

Connections & Anchorage

Drainage & Weather Protection

Not included

  • Foundations, slabs-on-grade, anchor rod setting and other sitework.
  • Steel erection and field labor, provided by your erector or general contractor.
  • Permit applications and plan review fees, unless agreed in writing.
  • Mechanical, electrical and plumbing design and installation.
  • US customs duties, tariffs, port charges and inland trucking, unless the stated Incoterm includes them.

Talk to an engineer

Send the racking plan and the footprint.

Our engineers work in English. We lay the column grid over your racking, compare clear span with interior columns and send a written scope for the steel.

Asked by developers, 3PLs and contractors

Warehouse questions and answers

14 answers on racking, large footprints, phased shipping and scope.

Racking, clear height and layout 3 answers

Why do you ask for the racking plan first?

Because the racking decides the building. Rack runs, aisle widths and the forklift or reach truck set where columns can stand, how far the frames must span and how much clear height the eaves need. We lay the column grid over your racking plan so no column lands in an aisle.

Can you give us a clear-span warehouse?

Yes, where the span suits your loads and layout. Very wide buildings are often lighter and cheaper with one or more interior column lines placed between rack runs. We show both options with their steel weight so you can choose.

Do you design for future mezzanines, conveyors or sprinklers?

Tell us what will hang from the roof or stand on the slab. Collateral loads for sprinklers, lighting, conveyors and solar, and any future mezzanine, are included in the design so the frame does not need strengthening later.

Large warehouses and phased projects 3 answers

How large a warehouse can World Steel supply?

Our plant in Vietnam fabricates 2,500 t (5.5 million lb) of structural steel a month. Published World Steel warehouses include buildings of 36 × 300 m (118 × 984 ft), 80 × 120 m (262 × 394 ft) and 40 × 240 m (131 × 787 ft). Large distribution centers are scheduled in production slots confirmed in your quote.

Can a large distribution center ship in phases?

Yes. We split the building into erection zones, fabricate and pack each zone in sequence and ship it so your erector can start on the first zone while later zones are still in production.

Can several buildings on one campus be ordered together?

Yes. Multi-building sites are detailed from one model, packed building by building and labeled so each erection crew opens only the containers for its building.

Design and codes 2 answers

Which codes do you design warehouses to?

IBC 2024 and ASCE 7-22 by default, or your jurisdiction’s edition, with AISC 360 for hot-rolled and built-up members, AISI S100 for cold-formed purlins and girts and MBMA practice for the metal building system.

Who approves and seals the drawings?

Your Engineer of Record reviews and approves the calculations and drawings we prepare. The approval, the PE seal and the permit belong to the US contractor, our customer, and their engineer. World Steel designs and fabricates; it does not seal drawings.

Distribution-center specs 3 answers

Which clear height should a new distribution building have?

Many new US distribution buildings are specified with about 9.8 to 12.2 m (32 to 40 ft) clear. Your racking, your sprinkler design and the tenants you want decide yours; we design the frame to keep it clear below the lowest member, joist or sprinkler main.

What column grid do you use?

The one your racking needs. Grids around 15 m (50 ft) are common, with a wider speed bay along the docks for staging. We lay the grid over your racking plan so columns land in the flue spaces, not in the aisles.

Do you design for ESFR sprinklers?

We frame for them. ESFR systems need their own clearance below the roof and carry heavy mains; the fire protection engineer sets those, and we design the roof steel for the piping loads and keep the clearances on our drawings.

Buying, shipping and erection 3 answers

Do you erect the warehouse?

No. World Steel designs, fabricates and supplies the steel structure, and the roof and wall cladding if you want it. Foundations, slab, erection and site work are the scope of the US contractor, our customer.

How is a big warehouse shipped?

In 40-foot containers or as breakbulk for the longest members, packed by erection zone and labeled to the erection drawings, from Vietnam to the US port in your quote.

Do you publish prices?

No. Send the racking plan, the footprint and the site address and we return a written scope and quotation.