Washington, DC · Building code
Structural steel and the DC Construction Codes
The District adopts the ICC codes with its own amendments as the DC Construction Codes, Title 12 of the DC Municipal Regulations. The Department of Buildings reviews plans, issues permits and inspects, and projects may use approved third-party plan reviewers to keep the schedule. We confirm the edition and review path before we model.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore for your Washington, DC site.
- Code
- DC Construction Codes
- Regulation
- Title 12 DCMR
- Reviewed by
- Department of Buildings
- Our part
- Code stated on sheet one
Why it matters
One city, one code, a busy desk
A DC permit set is reviewed by the Department of Buildings or an approved third-party reviewer, and structural comments come back on calculations, connections and special inspections.
We confirm the edition and review path with your Engineer of Record, state the code basis and loads on the first calculation sheet and answer reviewer comments on the steel through your team.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code | The DC Construction Codes edition with District amendments |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Snow | Ground snow, drift and the roof shape |
| Seismic | Site class and Seismic Design Category |
| Envelope | Girt and purlin details for the adopted energy code |
Who does what
Code work, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for plan review
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- The permit application
- Engineer of Record approval and PE seal
- Geotechnical report and site class
- Special inspections and local inspections
- Foundations and erection
Washington, DC
What we do not claim
World Steel holds no Washington, DC approval and no Washington, DC engineering license, and does not apply for permits. Your Engineer of Record seals the design and your team files it with the building official.
Washington, DC ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Washington, DC contractors
Washington, DC contractors: let’s win the next project together
If your next bid involves DC Construction Codes, World Steel wants to be your long-term, win-win steel partner in Washington, DC. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Washington, DC project is cut, welded, inspected and packed.
Q&A
What Washington, DC buyers ask
Who reviews the steel design?
The Department of Buildings or an approved third-party reviewer.
Do you handle street permits?
No. Street occupancy and crane permits are your team’s scope.
Can you answer plan review comments?
Yes. We answer comments on the steel and revise drawings through your Engineer of Record.
Official sources: DC Department of Buildings
Washington, DC solutions
Every Washington, DC guide
Related pages
Code facts on this page summarize Washington, DC practice, the DC Construction Codes, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Washington, DC?
Send the drawings or the site address, size and use. We set the Washington, DC design basis with your Engineer of Record, design or detail the steel to the DC Construction Codes, and quote it made in our plant in Vietnam, packed in erection order and delivered through Baltimore to your site.