Shipping long spans

A 47.5 m span, packed into boxes that cross the Pacific

Our footbridges are made in Vietnam and shipped by sea, so a long span is designed to come apart. We place bolted splices where the forces allow and where each segment fits a 40 ft container or a flat rack, trial-assemble the span, then pack it in the order your crew will set it.

Span 47.5 m (156 ft), cut at bolted splices

11.5 m 12 m 12 m 12 m
40 FT HIGH-CUBE · ≈12.0 M INSIDE
Segment
40 FT FLAT RACK
Deep truss segment

Diagram. Splice positions are set with your Engineer of Record.

Box or rack

Two ways a segment rides across the ocean

40 ft high-cube

About 12.0 m (39 ft 5 in) inside, 2.35 m wide, 2.69 m high. Closed, dry and handled with ordinary port gear.

Carries: Shorter or flatter segments, deck panels, rails, bolts and crates.

40 ft flat rack

No roof or sides, so deep or wide truss segments can ride lashed and covered.

Carries: Box-truss segments with their top bracing, portal frames, tall towers.

Where to cut a span

Four rules for a splice that travels well

Where forces are low

Splices go near points of low moment, agreed with your Engineer of Record.

Within the box

Each segment fits the box or rack it is planned for, with room to lash it.

Within the crane

Segment weight stays inside the crane the site can take, listed on the drawings.

Bolted, not welded

Field splices are bolted, so no site welding is needed to join the span.

Every splice is bolted once in our shop first: shop trial assembly.

Packing

Packed the way your crew will unpack it

Erection order. Bundles leave in the order your crew sets steel.
Labelled. Every bundle and crate is labelled with span and piece marks.
Photographed. Each load is photographed and filmed before the seal goes on.
Tracked. PEB Studio shows which segment is in which box, and where it is.

Plant to site

The route a bridge takes to your job

Our plant, Tay Ninh

Fabricated, trial-assembled, coated, packed

Ho Chi Minh City port

Containers and flat racks loaded and sealed

Pacific crossing

Tracked box by box

Your US port

West, Gulf or East Coast, chosen for the inland route

Your site

Import, haul and erection as the Incoterm and contract set out

More on the sea leg: Vietnam to the US, jobsite delivery and landed cost.

Packing hall

Bundles ready to leave our plant

Painted members strapped into bundles and stacked for the voyage
Packing hall with steel bundles, timber dunnage and loading racks
Gray members stacked and strapped together on a packing rack
Black-coated members bundled on a loading rack

Questions

Shipping a bridge from Vietnam

How do you ship a long pedestrian bridge from Vietnam?

The span is fabricated in segments with bolted field splices, trial-assembled in our plant, then shipped in 40 ft containers or on flat racks. Segments are sized for the box, the truck and the crane on site.

What length fits in a 40 ft container?

A 40 ft high-cube is about 12.0 m (39 ft 5 in) long inside, so segments are usually kept a little shorter than that. Deeper truss segments may ride on a flat rack instead.

Will the splices weaken the bridge?

No. Splices are designed as part of the structure, placed where forces are low and checked by your Engineer of Record. They are bolted and trial-fitted in our shop.

Which US ports can you ship to?

West, Gulf or East Coast ports, chosen for the inland route to your site. The quote names the Incoterm and the importer of record.

Who handles customs and the haul to site?

That depends on the Incoterm agreed in the contract. Erection and site handling are always the scope of the US contractor, our customer.

Worried how a long span will travel?

Send the span, depth and site access. We propose splice points, segment weights and the box or rack each segment rides in.