Virginia · Mountain snow
Snow loads and structural steel in western Virginia
Ground snow rises from the coast to the Blue Ridge and the Allegheny highlands. Distribution centers and plants along I-81 in the Shenandoah Valley have wide roofs, roof steps and parapets where drifts build, and elevation changes the load from one site to the next.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Virginia site through the Port of Virginia.
Exported steel in place in Thailand: a World Steel job abroad, shown for the building type rather than a US site.
- Hazard
- Ground snow and drift
- Most affected
- I-81 corridor and highlands
- Design basis
- ASCE 7 snow for the site
- Our part
- Purlins and frames sized
Why it matters
Drifts govern, not the average
Snow failures rarely come from the average roof load. They come from drifts against a higher roof, a parapet or rooftop equipment, where the load can be several times the flat roof value.
We size purlins, rafters and bracing for the drift zones your Engineer of Record defines, and give the frame reactions for the foundations.
What we design and fabricate
Steel for snow country
Drift zones
Purlins tightened at steps and parapets.
Stronger frames
Rafters and columns sized for the site load.
Roof bracing
Bracing for unbalanced and drift loads.
Insulated roofs
Panels for heat loss and condensation.
Who does what
Snow design, split clearly
World Steel supplies
- Purlins, frames and bracing for the site snow
- Drift checks at steps, parapets and equipment
- Frame reactions for the foundations
- Insulated roof panels if in scope
- Tekla shop and erection drawings, included
The US contractor arranges
- Engineer of Record approval and PE seal
- Site ground snow confirmed with the locality
- Foundations and erection
- Roof equipment placement
- The permit
What we do not claim
We publish no snow rating for a building. The ground snow load comes from ASCE 7 and the locality for your site and is confirmed by your Engineer of Record.
Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Virginia contractors
Virginia contractors: let’s win the next project together
If your next bid involves mountain snow, World Steel wants to be your long-term, win-win steel partner in Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Virginia project is cut, welded, inspected and packed.
Q&A
What Virginia buyers ask
Does elevation change the snow load?
Yes. Ground snow in western Virginia rises with elevation, so the load is set for each site.
Will rooftop units add drift?
Yes. Equipment and screens collect drifts. Your engineer defines the zones and we size the steel for them.
Can you add a future expansion?
Yes. If a future building will sit beside yours, its drift can be designed into the roof now.
Official sources: ASCE Hazard Tool
Virginia solutions
Every Virginia guide
Related pages
Code facts on this page summarize Virginia practice, the Virginia Uniform Statewide Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and amendments in force for your permit.
Building in Virginia?
Send the drawings or the site address, size and use. We set the Virginia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.