Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Quality inspector taking dimensions on a finished steel member

Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

Accredited testing laboratories

Every material on every project, tested at an ILAC-accredited lab or the lab you name

Plate, sections, bolts, welding consumables and coatings for World Steel projects are tested at laboratories accredited to ISO/IEC 17025 under the ILAC MRA, or wherever your specification says. SGS, Intertek and Bureau Veritas can witness it all, at the scale of a plant that fabricates 2,500 metric tons of structural steel a month.

Our testing promise

Accredited test results for every material, on every project

A mill certificate tells you what the mill found. We add an independent answer: every material on every World Steel project is tested at an ILAC-accredited laboratory, or at the laboratory or place your specification names. The results are filed against the heat or lot they tested, so your Engineer of Record can follow each number to the members it covers.

No material on a World Steel job goes into a member on the strength of a mill certificate alone.

Last reviewed . A guide for US contractors, engineers and inspectors, written by a fabricator. The current edition of each standard named in your specification governs.

Every material, every project

Plate, sections, coil, bolts, welding consumables and coatings: no material on a World Steel job goes untested.

ILAC-accredited laboratories

Tests run at laboratories accredited to ISO/IEC 17025 by an accreditation body that signs the ILAC MRA.

Or the lab you name

If your specification or your Engineer of Record names a laboratory, the samples go there instead.

Traced to your members

Each report is filed against the heat or lot it tested, and through it to the piece marks that use that material.

ILAC MRA, ring by ring

Why an accredited report from Vietnam carries weight in the US

Accreditation is a chain. Each ring checks the one inside it, and the ILAC Mutual Recognition Arrangement ties the outer rings together across borders, so a result from an accredited lab in Vietnam rests on the same system as one from an accredited lab in California.

ILAC

International Laboratory Accreditation Cooperation

Runs the ILAC Mutual Recognition Arrangement (ILAC MRA). Signatories accept each other’s accredited results as equivalent, and are peer-evaluated to keep their seat.

Region

Regional cooperations

Peer evaluation is organized by region: APAC for Asia Pacific, which includes Vietnam and the United States, IAAC for the Americas, EA for Europe.

Body

National accreditation body

In Vietnam, the Bureau of Accreditation (BoA), whose laboratory program is VILAS. In the US, bodies such as A2LA, ANAB and IAS. Each assesses labs against ISO/IEC 17025.

Lab

Accredited laboratory

Accredited for a listed scope of test methods, not for “testing” in general. It reports results with stated uncertainty, traceable calibration and trained staff.

Report

Your test report

Names the method, the sample, the result and the lab’s accreditation. It can carry the accreditation body’s symbol, and with it the ILAC MRA mark.

Three certificates, three meanings

ISO/IEC 17025, ISO/IEC 17020 and ISO 9001 are not interchangeable

A US reviewer sees all three on supplier documents. Only one of them says a test result is right.

ISO/IEC 17025

Testing and calibration laboratories

What it proves
The lab is technically competent to run each test method on its scope and to report a valid, traceable result.
Who holds it on a steel job
Laboratories that run tensile, Charpy, chemical, bolt and coating tests, and those that calibrate gauges.

ISO/IEC 17020

Inspection bodies

What it proves
The body is competent and impartial to inspect and judge conformity: witness tests, inspect welds, review records.
Who holds it on a steel job
Third-party inspection firms such as SGS, Intertek and Bureau Veritas, and many US special inspection agencies.

ISO 9001

Quality management systems

What it proves
An organization runs a documented quality system. It says nothing about whether a given test result is right.
Who holds it on a steel job
Mills, fabricators and suppliers. Useful, but no substitute for an accredited lab’s report.

Four hands on every sample

Who tests what on your steel, from the mill to the hold point

Each party tests something different and hands you a different record. Together they make the material file your Engineer of Record accepts.

Mill laboratory

Who
The steel mill’s own lab, validated by its inspection department, independent of production.
Tests
Chemistry, tensile and, when ordered, Charpy tests on each heat, to the ASTM product specification.

EN 10204 3.1 inspection certificate for every heat

Accredited laboratory

Who
An ISO/IEC 17025 laboratory under the ILAC MRA, or the laboratory your specification names.
Tests
Verification tests on samples cut from the delivered material, bolt and consumable lots, and welding qualification coupons.

Accredited test report filed against the heat or lot

World Steel shop QC

Who
Our QC inspectors in the Vietnam plant, inside the scope of our IAS AC472 accreditation.
Tests
Intake checks against the certificate, dimensions, visual weld inspection, coating thickness and NDT the ITP assigns to us.

QC records against each piece mark, open in PEB Studio

Third-party inspection

Who
An ISO/IEC 17020 inspection body you appoint, such as SGS, Intertek or Bureau Veritas, or your own agency.
Tests
Witness and hold points from the ITP, sample selection, record review and pre-shipment inspection.

Inspection reports and, where ordered, a co-signed 3.2 certificate

How the mill’s own record works is explained on EN 10204 mill test certificates, and the gate check against it on incoming material checks.

On the bench

Nine test families behind a structural steel package

Each one has its own method standard, its own number to read and its own report. Which of them your job needs, and how often, is set in your specification and your Inspection and Test Plan.

Tensile test

ASTM A370 · ASTM E8/E8M

Yield strength, tensile strength and elongation of plate, sections and bars, on a machined specimen pulled to failure.

345 MPa(50 ksi) minimum yield, ASTM A992 and A572 Grade 50
Read more →

Chemical analysis

ASTM A751 · ASTM E415

Carbon, manganese, phosphorus, sulfur, silicon and alloy content by spark emission spectrometry; the carbon equivalent follows.

CEcarbon equivalent, read for weldability and preheat
Read more →

Charpy V-notch impact

ASTM A370 · ASTM E23

Energy a notched 10 × 10 × 55 mm specimen absorbs at the temperature your specification names, three specimens a set.

27 J(20 ft·lbf), a common requirement for heavy members
Read more →

Hardness

ASTM E10 · ASTM E18 · ASTM E92

Brinell, Rockwell or Vickers hardness of base metal, weld and heat-affected zone, and of bolts, nuts and washers.

HV · HRChardness scales, set by the specification

Welding qualification coupons

AWS D1.1 · AWS D1.8

Reduced-section tensile, bend and macroetch tests on PQR and welder test coupons, with Charpy where the code or your specification asks.

PQRthe record each coupon result supports
Read more →

Nondestructive testing

ASTM E709 · ASTM E165 · AWS D1.1

Magnetic particle, dye penetrant and ultrasonic testing of welds, by technicians qualified to ASNT SNT-TC-1A, to the extent your ITP sets.

UT · MT · PTmethods, to the extent your ITP sets
Read more →

High-strength bolt lots

ASTM F3125 · ASTM F606/F606M

Proof load, wedge tensile and hardness of bolts by lot, with nuts to ASTM A563 and washers to ASTM F436.

Per lothow bolt test reports are issued and filed

Coating thickness and adhesion

SSPC-PA 2 · ASTM D7091 · ASTM D4541

Dry film thickness of each coat, surface profile and pull-off adhesion of the paint system your specification names.

µmdry film thickness, read coat by coat
Read more →

Galvanized coating

ASTM A123 · ASTM A153 · ASTM E376

Zinc coating thickness and adherence on hot-dip galvanized members and hardware, measured with magnetic gauges.

µmzinc thickness, against the ASTM A123 table
Read more →

For the submittal reviewer

Six checks before you accept a lab report

An accreditation logo on the letterhead is a start. These six checks confirm that the result in front of you is the accredited one, for your material.

  • The accreditation is current

    Find the lab in the accreditation body’s public directory and check the certificate number and expiry date.

  • The method is on the scope

    Accreditation covers listed methods. A lab accredited for tensile tests may not be accredited for Charpy or for coatings.

  • The body signs the ILAC MRA

    Check that the accreditation body is a signatory for testing, so the result carries across borders.

  • The sample is identified

    Heat or lot number, size and location in the product, and who selected and marked the sample.

  • Results meet the specification

    Each value is read against the ASTM grade or code limit, with units and test temperature stated.

  • The report is signed and whole

    Every page numbered, the authorized signatory named, and no result shown without its method.

Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.

Third-party inspection

SGS, Intertek and Bureau Veritas on World Steel jobs

All three run accredited laboratories and inspection bodies with staff in Vietnam, so your inspector can be in our plant without flying in from the US. SGS and Intertek have already inspected World Steel projects for our customers.

SGS

Founded 1878, headquartered in Geneva, Switzerland

Inspection, testing and certification across most industries, with inspectors and laboratories in Vietnam. On steel jobs: witness testing, product inspection, pre-shipment inspection and 3.2 co-signing.

SGS has inspected World Steel projects for our customers. Appointed by you, or arranged by us at your request.

Intertek

Headquartered in London, United Kingdom

Testing, inspection and certification with laboratories and inspectors in Vietnam and the US. On steel jobs: vendor inspection, expediting, NDT and material testing in its accredited labs.

Intertek has inspected World Steel projects for our customers. Appointed by you, or arranged by us at your request.

Bureau Veritas

Founded 1828, headquartered near Paris, France

Testing, inspection and certification worldwide, with a long history in marine and industrial steel. On steel jobs: third-party inspection, coating inspection, lab testing and system certification.

Bureau Veritas Vietnam already certifies our welding quality system to EN ISO 3834-2, comprehensive level.

Names are trademarks of their owners and are shown to describe the inspection services a customer can appoint. Any other inspection body or special inspection agency your specification names works with us the same way.

From hold point to data book

How a lab or inspector you appoint works with our plant

The rules are set once, in the Inspection and Test Plan both sides agree before production, and then followed for every heat and lot.

Named in the ITP

Your Inspection and Test Plan names the lab or inspection body, the tests, the sampling rate and every witness and hold point, agreed by both sides before production.

Called in time

We give notice before each hold point, and members are made available in the order your inspector wants them.

Samples marked and witnessed

Samples are cut, marked with the heat or lot number and sealed in front of your inspector, in person or on a live video call.

Tested at the lab

The accredited lab runs the methods on its scope and issues its report, which goes to you and to us at the same time.

Released or held

A pass releases the material. A failure puts it on hold under our nonconformance procedure until the disposition is agreed with your Engineer of Record.

Filed with the steel

Reports join the mill certificates in PEB Studio and the materials volume of your handover documents, filed by heat and lot.

2,500 t

of structural steel fabricated a month in one plant, with jobs up to 5,000 t delivered: Sunpro Steel, CPV Food at 2,500 t, Long Son at 2,000 t.

Testing on large jobs

Hundreds of heats, one test plan

Large US packages are where testing either runs ahead of the shop or holds it up. We plan it as part of the production schedule.

A test matrix, not one-offs

On a large package, testing is planned as a matrix of grades, thicknesses, heats and lots, set in the ITP before the first plate is cut.

Booked ahead of the shop

Sampling and lab slots run ahead of fabrication, so test results never become the thing a 2,500-ton month waits for.

One record for every heat

Hundreds of heats on one job stay sorted: each report is linked to its heat, and each heat to its members, in PEB Studio.

Labeled stacks of steel plate under a gantry crane Photo
Raw plate stock waiting in the World Steel yard, Vietnam.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Who does what

Four parties, one material record

Engineer of Record

Sets the tests, rates and acceptance criteria in the specification, accepts the results and decides any failure.

US contractor, our customer

Agrees the ITP with us, appoints any third-party inspector or lab, and brings the records to the building official.

Special inspection agency

Performs the inspections and tests the building official requires under IBC Chapter 17, in the plant or at the site.

World Steel

Buys certified material, has it tested at an ILAC-accredited lab or yours, runs shop QC and files every record against the steel.

Sources

The standards behind this guide

Reviewed November 21, 2026. The current edition of each standard governs.

Questions from US reviewers

Testing lab and third-party inspection questions we hear most

Are the materials for every World Steel project tested at an accredited laboratory?

Yes. Every material for every project is tested at an ILAC-accredited laboratory, meaning one accredited to ISO/IEC 17025 by an accreditation body that signs the ILAC MRA, or at the laboratory or place your specification or your Engineer of Record names. The mill certificate for each heat comes on top of that.

What does ILAC accreditation mean for a test report?

It means the lab was assessed against ISO/IEC 17025 by an accreditation body that is a signatory of the ILAC Mutual Recognition Arrangement. Signatories accept each other’s accredited results as equivalent, so a report from an accredited lab in Vietnam is backed by the same system that backs an A2LA, ANAB or IAS accredited lab in the US.

Is ISO/IEC 17025 the same as ISO 9001?

No. ISO 9001 certifies that an organization runs a quality management system. ISO/IEC 17025 accreditation confirms that a laboratory is technically competent to run specific test methods and report valid results. For a test result, 17025 is the one that counts.

Will our building official accept a test report from a lab in Vietnam?

Acceptance is always the building official’s and your Engineer of Record’s decision. What they usually look for is an accredited lab, a method on its scope, an identified sample and a result against the specification. If your jurisdiction or specification names a US laboratory, samples can be sent there instead.

Can we appoint SGS, Intertek or Bureau Veritas to inspect our order?

Yes, and SGS and Intertek have already inspected World Steel projects for our customers. Your inspector is named in the ITP with the witness and hold points they will attend. We give notice before each point, make the members available and give them access to the records in PEB Studio. If you prefer, we can arrange the firm you choose at your request, with the scope agreed in the proposal.

What is the difference between a testing lab and an inspection body?

A testing laboratory, accredited to ISO/IEC 17025, measures: it runs a tensile or Charpy test and reports the number. An inspection body, accredited to ISO/IEC 17020, judges: it witnesses tests, inspects welds and coatings and reports whether they conform. SGS, Intertek and Bureau Veritas do both, through different accredited units.

Does an EN 10204 3.2 certificate need a third-party inspector?

Yes. A 3.2 is validated by the mill’s inspector and also by the purchaser’s authorized inspector or one designated by regulation, a role firms such as SGS, Intertek or Bureau Veritas often take. It has to be ordered before the steel is made, so it is agreed at the quote stage.

Can testing be witnessed without traveling to Vietnam?

Yes. Sample selection, marking and the tests themselves can be witnessed on a live video call, and the lab report goes to you as soon as it is issued. Many inspectors combine remote witnessing for routine points with one or two visits for the hold points that matter most.

How do we check that a lab is accredited for the test we need?

Look the lab up in its accreditation body’s public directory, BoA’s VILAS list in Vietnam or A2LA, ANAB or IAS in the US, and open its scope of accreditation. The exact test method, for example ASTM A370 tensile or ASTM E23 Charpy, should be listed.

What happens if an independent test fails?

The material goes on hold under our nonconformance procedure. Retests follow the rules of the product specification, and the disposition, whether replace, retest or another solution, is agreed with your Engineer of Record. Nothing on hold is used or shipped until it is released in writing.

Is Smith-Emery the testing lab for our job?

Smith-Emery Laboratories, itself accredited by IAS as inspection agency AA-554, carries out the periodic inspections of our plant for IAS AC472, twice a year since 2019. The lab or agency for your job is the one named in your ITP and specification.

How do test reports reach our submittal?

Each report is filed against the heat or lot it tested, next to the mill certificate, in PEB Studio while the job is in the shop. At handover, reports go into the materials volume of your project documents with the material schedule that ties each heat and lot to its members.

Name your lab, or use ours

Send drawings or a specification with the tests, rates and any third-party inspector you want. We confirm the laboratory, the test matrix and the witness points with the quote.