What you measure us on
Control, schedule, quality and cost: four promises on every US job
A US contractor buying steel from overseas needs four things from a fabricator. This page shows how we deliver each one, and where you can check it.
You stay in control
Every decision that matters is yours, and every record behind it is open to you.
- A PEB Studio login to your own project
- Nine sign-off gates from PO to closeout
- One named project manager answering to you
Steel lands on schedule
The plan is built backward from the day your crew needs the first column.
- Production slot confirmed in your quote
- Fabricated and packed by erection sequence
- Port and inland route planned to your site date
Quality you can verify
Designed to US codes, welded to AWS, inspected at hold points you can attend.
- IAS AC472 accredited plant since 2019
- Witness by video, third party or in person
- Records ready for your special inspector
Cost kept down
Savings come from engineering, fit and logistics, not from cutting corners.
- Value engineering on every frame
- Shop drawings included at no extra cost
- Holes laser-cut so the steel bolts up first time
How a US job runs
Who does what, from bid to closeout
Seven phases, three parties. World Steel designs, fabricates and ships the steel structure; you, the US contractor and our customer, erect it; your Engineer of Record and building official approve it.
World Steel does not erect steel or hold a PE license. Drawing approval, the PE seal and the permit sit with you and your Engineer of Record.
Quote to warrantyEvery stage of a World Steel job, explainedTwenty stages from your quote request to warranty, each with what you send, what you receive and who owns it. See the full processControl · PEB Studio
Our shop’s own job file, open to your team
PEB Studio is World Steel’s in-house project system. It imports the Tekla model of your structure and gives each member an ID and a QR label that follow it from cutting to your jobsite. Your login shows the records our production and QC staff create, the moment they create them, from any US time zone.
Demonstration data
Production
Shop progress by stage, with the holdup flagged
Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.
These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.
Nine gates where the decision is yours
Each gate has a decision that belongs to you and a record you can open. The shop never runs ahead of a gate you have not cleared.
- You decide
- Code edition, risk category, loads and coating, signed with your Engineer of Record.
- You see
- The design basis sheet and SAP2000 calculation set.
Design basis
- You decide
- Approve or mark up; every round gets a new revision letter.
- You see
- Each revision, the anchor rod plan and column reactions.
Approval drawings
- You decide
- Nothing is cut until you release the approved set in writing.
- You see
- The Tekla model and bill of materials, one ID per member.
Release for fabrication
- You decide
- Grades from your design basis, certified by the mill.
- You see
- Each member tied to its mill test report by heat number.
Material
- You decide
- Ask for a re-sequence when your site changes.
- You see
- Progress by shop stage, weekly reports and shop photos.
Fabrication
- You decide
- Attend any hold point, live or by proxy.
- You see
- Every inspection attempt and how each NCR was closed.
Inspection
- You decide
- Review what goes into each container.
- You see
- Bundle lists, container photos and video, seal numbers.
Packing
- You decide
- Your crew sets steel in the planned sequence.
- You see
- Readiness by erection step and the 3D model colored by status.
Erection
- You decide
- Accept the records your owner and building official need.
- You see
- Released documents fingerprinted in one closeout package.
Closeout
Schedule
Six ways we keep steel off your critical path
On a US job the steel package often sets the pace for every trade after it. We plan backward from the day your crew needs the first column, and show you the plan moving.
A slot sized for large jobs
2,500 metric tons a month of our own capacity, with several projects running in parallel. The slot your job needs is confirmed in the quote.
Approvals that cannot go quiet
Each drawing issued and each approval due is tracked with a date, so a stalled review is raised before it reaches the shop.
Made in the order it goes up
The shop works sequence by sequence, so the columns and rafters your erector sets first are fabricated first.
Packed in erection order
Bundles follow the erection sequence and only QC-released members can be scanned in, so the first trucks carry the first lifts.
Shipping planned backward from your site
Our logistics team picks the West Coast, Gulf or East Coast port and the inland route that reach your site with the least risk.
Field answers from the people who drew it
The engineers who detailed your steel answer site questions by phone and video, during your US workday.
Quality · US standards
Designed to the codes your building official reads
Your calculation package names the code edition, every load input and its source. By default we design to the editions below, or to the ones your jurisdiction has adopted.
Checked by outside bodies
IAS AC472 accredited
Design and fabrication of metal building systems, accredited since 2019, the first and only plant in Vietnam, audited twice a year with IAS experts.
ISO 3834-2 welding quality
Fusion welding certified by Bureau Veritas to the comprehensive quality level.
AWS D1.8-qualified welding
Qualified procedures and welders for seismic force-resisting frames.
Mill certificates
EN 10204 3.1 certificates, with Charpy V-notch results on request, traced by heat number.
Witness any hold point, three ways
- Live on Zoom or Microsoft Teams
- Your third-party or special inspector
- In person at the plant
Cost
Where the savings come from
We never publish prices: every quote is built for its project. What we can show is how the total cost of your steel package comes down without trimming quality.
Lighter frames, same code
Value engineering tunes bay spacing, tapered members and secondary framing, then your Engineer of Record makes the call. Steel saved in one bay is saved in every bay.
Shop drawings included
Every project gets its shop and erection drawings at no extra cost, from the same Tekla model that drives the shop.
Fit that saves field hours
Our laser machines cut plate and make holes in steel up to 100 mm (4 in) thick, so connections bolt up without reaming or torch work on site.
No crane waiting on steel
Erection-sequence packing and step-by-step readiness in PEB Studio stop a rented crane from idling for one missing piece.
No surprise change orders
The scope letter lists what is supplied and what is by others. A change is priced and agreed in writing before any work continues.
Coatings you can buy at home
We apply UL-certified products from paint makers sold across the US, so touch-up and warranty work is simple once the steel is standing.
Proven at scale
The same process has carried jobs of up to 5,000 tons
Our own plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month. These are some of the largest packages it has delivered, run with the same gates, records and erection-sequence shipping.
5,000 t (about 5,500 short tons)
Sunpro Steel Factory
Steel industry · Can Tho City, Vietnam · 2024
2,500 t (about 2,750 short tons)
CPV Food Processing Factory
Food processing · Dong Nai Province, Vietnam · 2020
2,000 t (about 2,200 short tons)
Long Son petrochemical complex
Oil and gas · Ba Ria–Vung Tau, Vietnam · 2022
2,000 t (about 2,200 short tons)
M&D (MD Factory)
Warehouse and industrial · Thailand · 2024
1,500 t (about 1,650 short tons)
Tongwei Tien Giang feed factory, phase 1
Animal feed · Dong Thap Province, Vietnam · 2018
1,000 t (about 1,100 short tons)
New Era cold storage
Cold storage, phase 1 tonnage · Tay Ninh Province, Vietnam
Go deeper
Six guides to the way we work
Each guide covers one part of a US order: what we do, what lands on your desk and what we need back from you.
Questions
Working with World Steel on a US project
How does World Steel deliver a US project from Vietnam?
We design to the US code basis of your job, detail in Tekla, fabricate in our own IAS AC472-accredited plant in Vietnam and ship to the US port that suits your site. A named project manager runs the job, and your team follows every member in PEB Studio.
Who erects the steel and seals the drawings?
You do. World Steel designs, fabricates and supplies the steel structure. The US contractor, our customer, erects it, and with its Engineer of Record approves the drawings and handles the PE seal and the permit.
Which US codes do you design to?
IBC 2024 with ASCE 7-22 by default, or the edition your jurisdiction has adopted, with AISC 360, AISC 341 where seismic detailing applies, AISI S100 and AWS D1.1, D1.3 and D1.8 for welding.
How do I keep control of the schedule?
The production slot is confirmed in your quote, approvals are tracked with dates, the shop works in erection sequence and PEB Studio shows progress as it is scanned, so you see a slip before it reaches your site.
How do I check quality without flying to Vietnam?
An Inspection and Test Plan is agreed before production. At each hold point you can join on Zoom or Microsoft Teams, send a third-party inspector or visit the plant, and the records go into your project file.
Can you take a large package?
Yes. Our own plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and our largest jobs reach 5,000 tons.
Where do the cost savings come from?
Value engineering on the frame, shop drawings included at no extra cost, accurate laser-cut holes that cut field rework, and erection-sequence shipping that keeps your crane and crew working. We do not publish prices; every quote is project-specific.
Does World Steel have a US office or crew?
World Steel has a US office in Westminster, California, but no US plant or erection crew. Your steel is made in Vietnam and erected by your own crew or the erector you hire.
Send your steel package, get a plan you can control
Share bid documents, a model or just a footprint and an address. Our engineers check the US code basis, confirm the production slot and show you how the job would run in PEB Studio.