How we work · US projects

Your US steel package, delivered under your control

We design and fabricate in our own plant in Vietnam; you run the job from your office in the US, with a say at every stage gate and a record of everything that was checked.

How a US job runs

Who does what, from bid to closeout

Seven phases, three parties. World Steel designs, fabricates and ships the steel structure; you, the US contractor and our customer, erect it; your Engineer of Record and building official approve it.

Bid and value engineering
World Steel, VietnamTakes off the tonnage, checks the US code basis, proposes lighter framing options and confirms the production slot.
You, the US contractorSends bid documents, a model or a sketch with the address and occupancy.
Your Engineer of Record and building officialNames the code edition and any local amendments.
Design basis
World Steel, VietnamWrites loads, codes, steel grades and coating onto one sheet and runs the ASCE 7 combinations.
You, the US contractorConfirms the scope letter, Incoterm and importer of record.
Your Engineer of Record and building officialReviews and confirms wind, snow, seismic and risk category.
Approval drawings
World Steel, VietnamIssues the anchor rod plan, reactions, framing plans and calculations, revision by revision.
You, the US contractorMarks up or approves; starts the foundation design.
Your Engineer of Record and building officialReviews and approves; the PE seal and the permit stay on your side.
Release and fabrication
World Steel, VietnamDetails in Tekla, buys mill-certified steel, cuts, welds and coats by erection sequence.
You, the US contractorReleases the approved set in writing and follows production live in PEB Studio.
Your Engineer of Record and building officialSpecial inspection program agreed for the job.
Inspection
World Steel, VietnamRuns the agreed Inspection and Test Plan and keeps every record per member.
You, the US contractorWitnesses hold points by video, sends a third party or visits the plant.
Your Engineer of Record and building officialAccepts the fabricator’s program or sets in-plant inspection.
Packing and shipping
World Steel, VietnamScans released members into bundles, photographs each container and ships to the US port that suits the site.
You, the US contractorReceives the locked packing list; your broker clears customs per the Incoterm.
Your Engineer of Record and building officialNo action.
Erection and closeout
World Steel, VietnamAnswers field questions from the engineers who detailed the steel and hands over records.
You, the US contractorYour crew erects from our erection drawings and scans QR tags on site.
Your Engineer of Record and building officialField inspections and final sign-off.

World Steel does not erect steel or hold a PE license. Drawing approval, the PE seal and the permit sit with you and your Engineer of Record.

Quote to warrantyEvery stage of a World Steel job, explainedTwenty stages from your quote request to warranty, each with what you send, what you receive and who owns it. See the full process

Control · PEB Studio

Our shop’s own job file, open to your team

PEB Studio is World Steel’s in-house project system. It imports the Tekla model of your structure and gives each member an ID and a QR label that follow it from cutting to your jobsite. Your login shows the records our production and QC staff create, the moment they create them, from any US time zone.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data

Production

Shop progress by stage, with the holdup flagged

Cutting, fit-up, welding, blasting and painting are tallied by count and weight, alongside what is waiting on QC and what failed. Your regular production report is built from the same numbers.

These are real PEB Studio screens filled with sample training data, so no customer’s job is exposed and personal names are masked.

Nine gates where the decision is yours

Each gate has a decision that belongs to you and a record you can open. The shop never runs ahead of a gate you have not cleared.

Design basis

You decide
Code edition, risk category, loads and coating, signed with your Engineer of Record.
You see
The design basis sheet and SAP2000 calculation set.

Approval drawings

You decide
Approve or mark up; every round gets a new revision letter.
You see
Each revision, the anchor rod plan and column reactions.

Release for fabrication

You decide
Nothing is cut until you release the approved set in writing.
You see
The Tekla model and bill of materials, one ID per member.

Material

You decide
Grades from your design basis, certified by the mill.
You see
Each member tied to its mill test report by heat number.

Fabrication

You decide
Ask for a re-sequence when your site changes.
You see
Progress by shop stage, weekly reports and shop photos.

Inspection

You decide
Attend any hold point, live or by proxy.
You see
Every inspection attempt and how each NCR was closed.

Packing

You decide
Review what goes into each container.
You see
Bundle lists, container photos and video, seal numbers.

Erection

You decide
Your crew sets steel in the planned sequence.
You see
Readiness by erection step and the 3D model colored by status.

Closeout

You decide
Accept the records your owner and building official need.
You see
Released documents fingerprinted in one closeout package.

Schedule

Six ways we keep steel off your critical path

On a US job the steel package often sets the pace for every trade after it. We plan backward from the day your crew needs the first column, and show you the plan moving.

A slot sized for large jobs

2,500 metric tons a month of our own capacity, with several projects running in parallel. The slot your job needs is confirmed in the quote.

Approvals that cannot go quiet

Each drawing issued and each approval due is tracked with a date, so a stalled review is raised before it reaches the shop.

Made in the order it goes up

The shop works sequence by sequence, so the columns and rafters your erector sets first are fabricated first.

Packed in erection order

Bundles follow the erection sequence and only QC-released members can be scanned in, so the first trucks carry the first lifts.

Shipping planned backward from your site

Our logistics team picks the West Coast, Gulf or East Coast port and the inland route that reach your site with the least risk.

Field answers from the people who drew it

The engineers who detailed your steel answer site questions by phone and video, during your US workday.

Quality · US standards

Designed to the codes your building official reads

Your calculation package names the code edition, every load input and its source. By default we design to the editions below, or to the ones your jurisdiction has adopted.

IBC 2024 + ASCE 7-22Loads: wind, snow, seismic, rain and their combinations
AISC 360Design of hot-rolled and built-up steel members and connections
AISC 341Seismic detailing where the system requires it
AISI S100Cold-formed purlins and girts
AWS D1.1 · D1.3 · D1.8Structural, sheet steel and seismic welding
MBMA practiceMetal building systems conventions US crews expect
US standards center

Checked by outside bodies

IAS AC472 accredited

Design and fabrication of metal building systems, accredited since 2019, the first and only plant in Vietnam, audited twice a year with IAS experts.

ISO 3834-2 welding quality

Fusion welding certified by Bureau Veritas to the comprehensive quality level.

AWS D1.8-qualified welding

Qualified procedures and welders for seismic force-resisting frames.

Mill certificates

EN 10204 3.1 certificates, with Charpy V-notch results on request, traced by heat number.

Witness any hold point, three ways

  • Live on Zoom or Microsoft Teams
  • Your third-party or special inspector
  • In person at the plant

Cost

Where the savings come from

We never publish prices: every quote is built for its project. What we can show is how the total cost of your steel package comes down without trimming quality.

Lighter frames, same code

Value engineering tunes bay spacing, tapered members and secondary framing, then your Engineer of Record makes the call. Steel saved in one bay is saved in every bay.

Shop drawings included

Every project gets its shop and erection drawings at no extra cost, from the same Tekla model that drives the shop.

Fit that saves field hours

Our laser machines cut plate and make holes in steel up to 100 mm (4 in) thick, so connections bolt up without reaming or torch work on site.

No crane waiting on steel

Erection-sequence packing and step-by-step readiness in PEB Studio stop a rented crane from idling for one missing piece.

No surprise change orders

The scope letter lists what is supplied and what is by others. A change is priced and agreed in writing before any work continues.

Coatings you can buy at home

We apply UL-certified products from paint makers sold across the US, so touch-up and warranty work is simple once the steel is standing.

Questions

Working with World Steel on a US project

How does World Steel deliver a US project from Vietnam?

We design to the US code basis of your job, detail in Tekla, fabricate in our own IAS AC472-accredited plant in Vietnam and ship to the US port that suits your site. A named project manager runs the job, and your team follows every member in PEB Studio.

Who erects the steel and seals the drawings?

You do. World Steel designs, fabricates and supplies the steel structure. The US contractor, our customer, erects it, and with its Engineer of Record approves the drawings and handles the PE seal and the permit.

Which US codes do you design to?

IBC 2024 with ASCE 7-22 by default, or the edition your jurisdiction has adopted, with AISC 360, AISC 341 where seismic detailing applies, AISI S100 and AWS D1.1, D1.3 and D1.8 for welding.

How do I keep control of the schedule?

The production slot is confirmed in your quote, approvals are tracked with dates, the shop works in erection sequence and PEB Studio shows progress as it is scanned, so you see a slip before it reaches your site.

How do I check quality without flying to Vietnam?

An Inspection and Test Plan is agreed before production. At each hold point you can join on Zoom or Microsoft Teams, send a third-party inspector or visit the plant, and the records go into your project file.

Can you take a large package?

Yes. Our own plant fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month, and our largest jobs reach 5,000 tons.

Where do the cost savings come from?

Value engineering on the frame, shop drawings included at no extra cost, accurate laser-cut holes that cut field rework, and erection-sequence shipping that keeps your crane and crew working. We do not publish prices; every quote is project-specific.

Does World Steel have a US office or crew?

World Steel has a US office in Westminster, California, but no US plant or erection crew. Your steel is made in Vietnam and erected by your own crew or the erector you hire.

Send your steel package, get a plan you can control

Share bid documents, a model or just a footprint and an address. Our engineers check the US code basis, confirm the production slot and show you how the job would run in PEB Studio.