Current rules
What Section 232 means for a steel building today
Proclamation 11021 of April 2, 2026, as modified by Proclamation 11032 of June 1, 2026, is the framework in force. These are its points that matter most for a pre-engineered building or a structural steel package.
Full value
Since April 6, 2026
The Section 232 duty is charged on the full customs value of a covered article, regardless of how much of its value is steel.
50%
Annex I-A articles
Fabricated structural steel of HTSUS heading 7308 (columns, beams, girders, structures and parts of structures) is listed in Annex I-A.
25%
Annex I-B articles
Prefabricated buildings of steel, HTSUS 9406.20.00, are listed in Annex I-B of the same proclamation.
No
Vietnam carve-out
Neither proclamation names Vietnam, so goods of Vietnam pay the standard Section 232 rate for their annex.
Three rates in the steel annexes
- 50% for Annex I-A articles, made entirely or almost entirely of steel (clause 2).
- 25% for Annex I-B derivative articles (clause 3).
- 10% for derivative articles whose steel was melted and poured in the United States. Proclamation 11032 lowered the “entirely” test from 95% to 85% of content from June 8, 2026.
Lower rates for the United Kingdom and for listed trade-agreement partners (Argentina, Ecuador, El Salvador, Guatemala, Japan, Korea, Liechtenstein, Switzerland, Taiwan and EU members) do not extend to Vietnam.
What changed in 2026
- Full customs value. The duty base is the whole value of the article, not its steel content.
- No low-steel exception for Chapter 73. Articles under 15% metal by weight are excluded, but not those in HTSUS Chapters 72 and 73, where structural steel sits.
- No exclusions on request. Product exclusions ended in March 2025; scope changes now come by proclamation or Federal Register notice.
- Temporary rates end December 31, 2027. The reduced Annex I-C and Annex III rates are set to revert on January 1, 2028.
Timeline
How the steel tariff got here, 2018 to 2026
Section 232 of the Trade Expansion Act of 1962 lets the President adjust imports that the Commerce Department finds threaten national security. The steel action has been changed many times since 2018; these are the steps that shape today’s rules.
Reading this for an order?
Your licensed customs broker confirms the treatment of each line at entry.
Questions US buyers ask →-
Mar 8, 2018
Proclamation 9705
Signed March 8; a 25% duty on steel mill articles applies from March 23, 2018, after a Commerce finding that steel imports threaten to impair national security. Source
-
Jan 24, 2020
Derivatives added
Proclamation 9980 extends the duties to certain derivative steel articles, such as nails and bumper stampings. Source
-
Feb 10, 2025
Proclamation 10896
Country exemptions and the product exclusion process end on March 12, 2025, and more derivative articles are covered. Source
-
Jun 3, 2025
Proclamation 10947
The steel duty rises from 25% to 50% from June 4, 2025, with a lower rate kept for the United Kingdom. Source
-
Aug 19, 2025
Inclusions round one
The Commerce Department (BIS) adds 407 HTSUS codes as steel and aluminum derivatives, effective August 18, 2025. Source
-
Apr 2, 2026
Proclamation 11021
The steel, aluminum and copper programs are restructured: duty on full customs value, Annex I-A at 50% and Annex I-B at 25%, from April 6, 2026. Source
-
Jun 1, 2026
Proclamation 11032
A new Annex I-C and lower rates for listed trade-agreement partners take effect June 8, 2026. Vietnam is not on that list. Source
-
Aug 6, 2026
14 more categories proposed
BIS asks for comments on adding 14 derivative categories, such as cranes, trailers and welding machine parts. None is a building product. Source
-
Oct 14, 2026
US-content guidance
A Federal Register notice tells CBP how "U.S. content" is assessed under Proclamation 11032 for qualifying goods of Canada and Mexico. Source
HTSUS lines
Where a steel building package sits in the annexes
The rate follows the tariff line, so a frame shipped as parts and a complete prefabricated building can be treated differently. These are the lines a World Steel package most often touches, as printed in the Proclamation 11021 annexes.
| HTSUS | Description | Annex | Section 232 rate (Vietnam) |
|---|---|---|---|
| 7308.90.30 / 7308.90.60 | Columns, pillars, posts, beams and girders of iron or steel | Annex I-A | 50% |
| 7308.90.95 | Structures (excluding prefabricated buildings of heading 9406) and parts of structures, of iron or steel, not elsewhere specified | Annex I-A | 50% |
| 7308.30.10 / 7308.30.50 | Doors, windows and their frames and thresholds, of iron or steel | Annex I-A | 50% |
| 7308.90.70 | Steel grating for structures or parts of structures | Annex I-A | 50% |
| 9406.20.00 | Prefabricated buildings of steel | Annex I-B | 25% |
Other duties
What else applies on the same entry
Section 232 is one of several US measures on imported goods. This is how each one meets steel covered by Section 232, as of the review date.
IEEPA tariffs
EndedThe Supreme Court held on February 20, 2026 that IEEPA does not authorize tariffs. CBP stopped collecting those duties on February 24, 2026.
Section 122 surcharge
ExpiredA 10% temporary import surcharge applied from February 24 to July 24, 2026. Goods subject to Section 232 were outside it.
Section 301 (forced labor)
Not on 232 goodsSince July 24, 2026 most goods of Vietnam carry an extra 12.5% under Section 301, but articles subject to Section 232 are exempt from it.
Normal (MFN) duty
AppliesThe ordinary column 1 duty of the HTSUS line still applies alongside Section 232.
Antidumping / countervailing
Check each lineAD/CVD orders apply in addition to Section 232. Your broker checks the product and country against current orders before entry.
Fees
ApplyThe merchandise processing fee and, at seaports, the harbor maintenance fee are charged on the entry as usual.
Importer checklist
Six things your importer of record gets right
- Classify every lineAgree the HTSUS number for frames, secondary members, panels, doors, fasteners and accessories with your licensed customs broker. The annex follows the HTSUS line, so the line decides the rate.
- Report melt and pourCBP requires the country where the steel was melted and poured for every steel and steel derivative entry. Our mill certificates give the mill and heat number for each grade.
- Declare the full valueSince April 6, 2026 the duty base is the full customs value. A commercial invoice that splits steel and non-steel value no longer lowers the Section 232 duty.
- Use the right Chapter 99 numberEach Section 232 entry line carries a Chapter 99 heading as well as its Chapter 72–97 number, as set out in CBP guidance (CSMS #68253075 and later messages).
- Mind foreign-trade zonesCovered goods admitted to an FTZ from April 6, 2026 must be admitted in privileged foreign status unless they qualify for domestic status.
- Ask for a binding ruling if unsureFor a large or repeat order, a CBP binding ruling under 19 CFR Part 177 settles the classification before the steel ships.
Our part
A clean customs file from a single plant in Vietnam
Section 232 is charged on what enters, so the paperwork matters as much as the steel. World Steel makes every building in its own plant in Tay Ninh Province, Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and ships it to the US port that suits your site. Our Westminster, California office handles quotes and coordination; it is not a plant.
All materials come from mills and factories in Vietnam and are traced from their mill certificates to each finished member, so the melt-and-pour country your broker reports is backed by documents.
Incoterm and importer named
Every quote states the Incoterm and who acts as importer of record, so the duty is assigned before you sign.
Line-by-line commercial invoice
Members and accessories grouped so your broker can classify each HTSUS line, with weights in kg and lb.
EN 10204 3.1 mill certificates
Mill, grade and heat number for the steel in your order, for the melt-and-pour declaration.
Documents in PEB Studio
Invoices, packing lists, certificates and container reports released to your login in real time, so your broker has the file before the ship arrives.
Sources
Official documents behind this page
Reviewed November 16, 2026. Section 232 has changed several times a year since 2025; if a newer proclamation, Federal Register notice or CBP message exists, it governs.
- Proclamation 11021, Strengthening Actions Taken To Adjust Imports of Aluminum, Steel, and Copper Into the United States (Apr 2, 2026), FR Doc. 2026-06960
- Annexes I-A, I-B, II, III and IV to Proclamation 11021 (White House, April 2026)
- Proclamation 11032, Further Adjusting the Tariff Regimes for Imports of Aluminum, Steel, and Copper Into the United States (Jun 1, 2026), FR Doc. 2026-11314
- CBP CSMS #68253075, Guidance: Section 232 Duties on Imports of Aluminum, Steel, and Copper (Apr 3, 2026)
- BIS, Request for Public Comments on Additional Aluminum, Steel, and Copper Derivative Articles, 91 FR 50756 (Aug 6, 2026)
- BIS, Adoption and Procedures of the Section 232 Steel and Aluminum Tariff Inclusions Process, 90 FR 40326 (Aug 19, 2025)
- Proclamation 10947, Adjusting Imports of Aluminum and Steel Into the United States (Jun 3, 2025), 90 FR 24199
- Proclamation 10896, Adjusting Imports of Steel Into the United States (Feb 10, 2025), 90 FR 9817
- Proclamation 9980, Adjusting Imports of Derivative Aluminum Articles and Derivative Steel Articles (Jan 24, 2020), FR Doc. 2020-01806
- Proclamation 9705, Adjusting Imports of Steel Into the United States (Mar 8, 2018), 83 FR 11625
- Guidance on "U.S. Content" under clause (2)(D) of Proclamation 11032, FR Doc. 2026-20938 (Oct 14, 2026)
- USTR, Section 301 forced-labor investigations: notice of final action (Jul 23, 2026)
- CBP, Binding rulings (19 CFR Part 177) and the CROSS rulings database
Questions from US buyers
Section 232 questions we hear most
Does Section 232 apply to a steel building made in Vietnam?
Yes. Fabricated structural steel of HTSUS heading 7308 is listed in Annex I-A and prefabricated buildings of steel (9406.20.00) in Annex I-B of Proclamation 11021. Neither proclamation gives Vietnam a lower rate or an exemption, so the standard rate for the annex applies.
Is the duty charged only on the steel content?
Not anymore. From April 6, 2026 the duty is charged on the full customs value of a covered article, regardless of metal content. The earlier split between steel and non-steel value no longer applies.
Which rate applies to my order: 50% or 25%?
It follows the HTSUS line your importer of record declares. Structures and parts of structures under 7308 are in Annex I-A; prefabricated buildings of steel under 9406.20.00 are in Annex I-B. Classification is a legal decision for the importer and its customs broker, and a CBP binding ruling can confirm it before you order.
Is there still a way to ask for an exclusion?
The product exclusion process ended on March 12, 2025 under Proclamation 10896. Products are now added or removed by proclamation or Federal Register notice.
Does the 12.5% Section 301 tariff on Vietnam stack on top?
No, for covered steel. The Section 301 forced-labor action that took effect July 24, 2026 exempts articles subject to Section 232. Parts of an order that fall outside Section 232 can still be subject to it.
Who pays the duty on a World Steel order?
The importer of record. Your quote names the Incoterm and who acts as importer of record, so the duty is assigned before you sign. We publish no landed costs or duty estimates.
Can a federally funded project use imported steel?
Federal and federally funded projects can carry domestic-content rules that are separate from Section 232. Confirm the requirements with the contracting officer or funding agency before you order.
Is this page legal advice?
No. It summarizes US government documents as of November 16, 2026 and the rules change often. Confirm the treatment of your shipment with a licensed customs broker or trade attorney.
Get a quote that names the importer of record
Send drawings, a sketch or just the footprint and your site address. Your quote states the scope of supply, the Incoterm, the importer of record and the US port we suggest, so duties are assigned before you sign.