Ohio · Chip and advanced plants
Structural steel for Ohio chip and advanced manufacturing plants
Licking County, east of Columbus, is home to one of the largest chip manufacturing projects in the country, and suppliers are following it into central Ohio. Around the fab buildings themselves, these campuses need warehouses, central utility plants, gas yards, office buildings and pipe bridges, all on tight schedules. Much of that is structural steel that can be fabricated off site.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and delivered to your Ohio site through the East Coast ports.
- Market
- Chip and supplier plants in central Ohio
- Steel
- Support buildings, utility plants, racks
- Design
- Stiff floors and heavy equipment loads
- Our part
- Released building by building
Why it matters
The campus around the fab is mostly steel
The cleanroom buildings of a chip plant follow the owner’s specialist design. The buildings around them, from central utility plants and chemical storage to warehouses and offices, are steel frames with heavy roof and floor equipment, long pipe runs and strict deflection limits.
These packages are large and run in parallel. We fabricate them to the owner’s specification and your Engineer of Record’s drawings, and release them building by building so each crew has steel when its foundations are ready.
What we design and fabricate
Steel for an advanced manufacturing campus
Central utility plants
Heavy frames for chillers, boilers and electrical rooms.
Stiff floors
Composite floor steel sized for vibration and deflection limits.
Pipe bridges and racks
Racks linking the buildings of the campus.
Equipment platforms
Platforms, stairs and access for process equipment.
Warehouses and logistics
Long-span storage and shipping buildings on the campus.
Release packages
Steel packed and shipped in your erection sequence.
Who does what
Our scope beside the owner’s specialists
World Steel supplies
- Structural steel for support buildings and utility plants
- Racks, platforms and equipment support steel
- Tekla shop and erection drawings, included
- Mill certificates by heat and fabrication records
- Release packages in erection order
Others provide
- Cleanroom and process design by the owner’s specialists
- Engineer of Record approval and PE seal
- Erection and site work by the US contractor
- Process piping and equipment installation
- Plan approval and inspections
What we do not claim
World Steel names no chip maker as a customer and claims no cleanroom design. We fabricate the structural steel to the drawings and specifications your team approves.
Ohio ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Ohio contractors
Ohio contractors: let’s win the next project together
If your next bid involves chip and advanced plants, World Steel wants to be your long-term, win-win steel partner in Ohio. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Ohio project is cut, welded, inspected and packed.
Q&A
What Ohio buyers ask
Can you meet owner specifications on large campuses?
Yes. We fabricate to the owner’s steel specification and the Engineer of Record’s drawings, with mill certificates traced by heat.
How do you handle very large packages?
Our plant fabricates 2,500 t a month. We split the work into release packages that follow your erection sequence.
Do you supply the cleanroom structure?
We supply structural steel to your drawings. Cleanroom systems and process design stay with the owner’s specialists.
Official sources: JobsOhio: advanced manufacturing
Ohio solutions
Every Ohio guide
Related pages
Code facts on this page summarize Ohio practice, the Ohio Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building department confirm the edition and amendments in force for your plan approval.
Building in Ohio?
Send the drawings or the site address, size and use. We set the Ohio design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for the trip to your site.