Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Mobile crane lifting a member into a multi-story steel frame

Seismic steel structures · Designed for US earthquake country

Steel built for the ground that moves

From California and Cascadia to the Wasatch Front, Alaska and New Madrid, we design seismic steel structures to ASCE 7-22 and AISC 341, fabricate them to AWS D1.1 and D1.8 in our own plant in Vietnam and ship them to your US port with every record your inspector will ask for.

The first and only fabricator in Vietnam accredited under IAS AC472. The steel comes mainly from mills in Vietnam, with Japan, Korea, Indonesia or Thailand when the project specification calls for it. Westminster, California is our US office, not a plant.

Tapered built-up rigid frame with a braced bay, over a ground motion trace SEISMIC FORCE Tapered built-up frame moment frame across the building Braced bay along the building GROUND MOTION
Designed to
IBC 2024 · ASCE 7-22 · AISC 341-22 & 358-22
Welded to
AWS D1.1, plus D1.8 for designated seismic welds
Approved by
Your Engineer of Record
Tracked in
PEB Studio, in real time

ASCE 7-22 · Seismic Design Category

Six letters decide how much seismic steel you need

Your site’s ground motion, its soil and how essential the building is set the category. Each step up the ladder adds design, detailing and inspection.

  1. AVery low

    A complete load path and minimum ties. No seismic system analysis.

  2. BLow

    Forces calculated. Steel with R = 3 needs no AISC 341 detailing.

  3. CModerate

    R = 3 still allowed. More rules for anchorage and nonstructural parts.

  4. DHigh

    AISC 341 detailing, height limits by system, seismic quality assurance.

  5. ENear major faults

    Tighter limits on systems and irregularities.

  6. FEssential, near faults

    Risk category IV near major faults. The strictest limits.

Seismic Design Categories explained

A plain-English summary; the category for your site is confirmed with your Engineer of Record.

The seismic solution group

Everything between a fault map and a finished frame

Nine guides written for US owners, contractors and engineers, each tied to the way we design, fabricate and document your steel.

How we work

From your site address to seismic steel on the dock

One team carries the seismic criteria from the first calculation to the last weld record, and you can watch every step.

  1. Site and criteria

    Coordinates, soil report and risk category set the Seismic Design Category, agreed with your Engineer of Record.

  2. System chosen

    Moment frames, braced bays or both, picked for your category, height, weights and openings.

  3. Designed for your approval

    Earthquake, wind and snow in one SAP2000 model, with drawings for your Engineer of Record.

  4. Shop drawings included

    Tekla shop drawings with protected zones and demand-critical welds marked, at no extra charge.

  5. Fabricated and tested

    Welded by procedures and welders qualified to AWS D1.8 and D1.1 in our IAS AC472-accredited plant in Vietnam.

  6. Tracked in PEB Studio

    Follow cutting, welding, testing and QC release of your seismic members in real time.

  7. Records for inspectors

    Mill certificates, weld records and test reports in the Manufacturing Data Record.

  8. Shipped to your port

    Packed in erection order and shipped from Vietnam to the US port nearest your site.

Real photos from our plant in Vietnam

Where your seismic steel is cut, welded and checked

Every frame, brace and connection for a US project is made in World Steel’s own plant in Tay Ninh Province, Vietnam. These are our real shop floors and jobs, not stock images.

Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Two welders operating a submerged-arc welding station on a member Photo
Submerged-arc welding of web-to-flange seams in the Vietnam plant.
Welder looking over the stiffeners and end plate of a heavy column Photo
Column stiffeners and end plate under inspection at World Steel, Vietnam.
Plate and coil strip racked by grade and heat number in the store Photo
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Quality inspector taking dimensions on a finished steel member Photo
Dimensional check by QC in Vietnam before a member goes on to blasting and paint.
Primed column with its bolted end plate set on painting stands Photo
Primer on a column and its end plate at the Vietnam plant, ready for the next coat.
Long factory building framed with red tapered portal frames and roof purlins Photo
World Steel job in Vietnam (Tay Ninh Province): tapered portal frames.
Rows of labeled steel bundles ready to leave the plant Photo
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Multi-story in earthquake country

Seismic multi-story steel buildings, with a full California solution

Mid-rise offices, clinics and mixed use in Seismic Design Categories D to F: special braced, buckling-restrained and moment frames to AISC 341, AWS D1.8 welding, and the California code, DSA and HCAI review paths.

The seismic solution ecosystem

One seismic structure, a whole ecosystem behind it

The frames, braces and connections we make, the engineering and services that come with them, and the industries and projects they serve, all linked from one place.

Seismic regions

Where we ship seismic steel in the US

Earthquake design reaches far beyond California. Every state guide covers the code edition, the site conditions, the ports that serve it and how steel reaches your site.

Pacific Coast

Plate-boundary faults and the Cascadia subduction zone put most coastal cities in the higher categories.

Alaska and Hawaii

The Aleutian arc and Hawaii’s volcanic island chain carry some of the highest ground motions in the country.

Intermountain West

The Intermountain Seismic Belt and the Basin and Range run from Nevada and Utah up through Idaho, Montana and Wyoming.

Central United States

The New Madrid and Wabash Valley seismic zones mean many sites far from any coast still need seismic detailing.

Southeast

Charleston, South Carolina was badly damaged in 1886, and the coastal plain soils there still drive design.

US codes and standards

The documents behind every seismic frame

We design and fabricate to these standards as your project requires. They are design references, not certifications: we claim no AISC or AWS company certification.

Questions from US buyers

Seismic steel questions we hear

Can a steel building made in Vietnam be used in a high seismic region of the US?

Yes. Where the building is in place does not change the code: it is designed to ASCE 7-22 and, where the system requires it, AISC 341, reviewed and approved by your Engineer of Record and fabricated in our IAS AC472-accredited plant with the records your building official and inspectors need.

Which seismic systems do you supply?

Tapered built-up rigid frames as ordinary moment frames, braced frames with rod, angle, HSS or pipe braces, portal frames, and, to your Engineer of Record’s design, intermediate and special moment frames and special braced frames.

Who approves and seals the seismic design?

The US contractor, our customer, and their Engineer of Record. World Steel designs and fabricates the steel structure and delivers the calculations and drawings they review, approve and seal.

Are shop drawings included for seismic projects?

Yes. We prepare shop drawings for every project at no extra charge, with protected zones, demand-critical welds and braced bays shown.

Can I follow the fabrication of my seismic members?

Yes. PEB Studio shows each member moving through cutting, welding, testing, coating and QC release in real time, with the reports attached.

Do you erect the building?

No. World Steel supplies the steel structure only. Erection is the scope of the US contractor, World Steel’s customer, and field special inspection is arranged by others.

Is a steel building earthquake-proof?

No building is. Steel’s light weight and ductility help, but performance depends on the criteria, the foundations, the erection and later changes. We design to the code your jurisdiction enforces.

Building in earthquake country?

Send the site address, the soil report if you have one, and what the building is for. We confirm the seismic criteria with your Engineer of Record, then return a written scope for steel designed to US codes and made in our plant in Vietnam.