
Inside a finished World Steel frame on a job abroad (location not stated).
Georgia · Food and cold storage
Steel for Georgia’s food plants and cold stores
Georgia leads the US in broiler chicken production, with Gainesville at the center of it, and processes peanuts, pecans and produce across the south of the state. Refrigerated imports land at Savannah and fill cold stores near the port. These buildings wash down daily, run cold and humid, and need steel and envelopes that last in those conditions.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and landed at a Georgia port.
- Market
- Gainesville, South Georgia, Savannah
- Rooms
- Washdown, chilled and frozen
- Envelope
- Insulated panels, sealed joints
- Coatings
- Galvanizing or epoxy where wet
Why it matters
Cold, wet and clean
A poultry or food plant combines very different rooms under one roof: chilled processing floors washed down every shift, freezers, dry packaging, boiler rooms and offices. Each room has its own temperature, humidity and cleaning regime, and the steel and envelope must suit all of them without condensation or corrosion.
Cold stores near the port are simpler but larger: tall racked rooms at freezing temperatures, with long dock walls and heavy refrigeration equipment. We frame for the racking, the roof equipment and the insulated panel envelope as one design.
What we fabricate
Steel for Georgia food buildings
Insulated envelopes
Insulated metal panels for walls, roofs and internal partitions, with sealed joints.
Washdown coatings
Hot-dip galvanizing or epoxy systems where steel is exposed to daily cleaning.
Refrigeration supports
Framing for evaporators, condensers and roof-mounted refrigeration equipment.
Tall racked rooms
Clear-span frames for high-bay cold stores with racking loads coordinated.
Dock walls and canopies
Long dock walls and canopies framed for the doors and the wind.
Farm and processing buildings
Storage and processing buildings for peanuts, pecans and grain.
What we do not claim
We name no food or poultry company as a World Steel customer and claim no federal food-safety approval for a building. Food-safety design is set by the owner’s team; we fabricate the steel and envelope to the approved design.
Georgia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Georgia contractors
Georgia contractors: let’s win the next project together
If your next bid involves food and cold storage, World Steel wants to be your long-term, win-win steel partner in Georgia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Georgia project is cut, welded, inspected and packed.
Q&A
What Georgia buyers ask
Can you supply the insulated panels with the frame?
Yes. We supply frames with insulated roof and wall panels, partitions and trims as one package, or the frame alone if your panels come from elsewhere.
Which coating suits a washdown room?
Usually hot-dip galvanizing or an epoxy system on exposed steel, following your specification and the cleaning chemicals used.
Do you have cold storage experience?
Yes. New Era cold storage in Vietnam, about 1,000 t of World Steel steel, is one of our reference projects.
Official sources: Georgia Department of Agriculture
Georgia solutions
Every Georgia guide
Related pages
Code facts on this page summarize Georgia rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Georgia?
Send the drawings or the site address, size and use. We set the Georgia design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, landed at Savannah and packed in erection order.