Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Coated members drying in rows on stands in the paint hall

Members drying in the World Steel paint hall in Vietnam after coating.

Corrosion protection

Salt air, de-icing salt or fumes? Match the coating to the site.

Describe the site and how close it is to the water, and an engineer talks you through coating and galvanizing options for the steel. We advise on the system; no coating life is guaranteed.

I need corrosion protection

Fields marked * are required. It takes a few minutes.

You and your company
The project
Message and files

Products in your request

VICTOR Dang, Global Sales Director, World Steel Group

Your direct line at World Steel

VICTOR Dang

Global Sales Director, World Steel Group

View Victor’s profile

Exposure zones

From the shoreline inland: where corrosion comes from

Choose the distance and the main exposure in the form. The coating system we propose follows from them.

  • On the shoreline

    Less than 200 m (650 ft) from the water: the harshest salt exposure.

  • Near the coast

    200 m to 3 km (650 ft to 2 mi): salt carried inland by wind.

  • De-icing salt

    Parking structures and road-side buildings in snow states.

  • Agricultural

    Livestock, fertilizer and feed buildings with ammonia and moisture.

  • Industrial fumes

    Process plants with chemical vapors or high humidity inside.

Protection systems

Applied and checked in our plant before the steel ships

  • Hot-dip galvanizingZinc coating on fabricated members where exposure calls for it.
  • Zinc-rich primer systemsZinc-rich primer with epoxy and polyurethane coats over blast-cleaned steel.
  • Detailing against corrosionDrain holes, sealed joints and no pockets where water stands.

We advise on the system and record the coating thickness. We do not guarantee how long a coating lasts: that depends on the site and its maintenance.

Inspector walking a line of painted built-up members on the shop floor

Before you send

Questions contractors ask first

Something else? Write it in the message box and an engineer answers with your quote.

Do you guarantee how long the coating lasts?

No. Coating life depends on the site, the maintenance and the system chosen. We explain the options and their trade-offs so you and the owner can choose.

Can you galvanize the whole frame?

Hot-dip galvanizing is available where the exposure calls for it. We confirm which members can be galvanized and how that affects connections and shipping.

Where is the coating applied?

In our plant in Vietnam, after blast cleaning, with coating thickness checked and recorded before packing.