Roof zones
Where the roof is pulled hardest
Wind flowing over a roof separates at the edges and swirls at the corners. Suction there is often two to three times the suction in the middle of the roof, so the fixings change from zone to zone, not just from building to building.
Field
The middle of the roof: the lightest suction, standard spacing.
Edge
Strips along the eaves, ridge and gables: closer purlins and more screws.
Corner
Where two edges meet: the highest suction, the tightest spacing of all.
Zone widths come from the code, based on building height and plan size. Your engineer of record confirms them.
What we change
Six things we tighten for a hurricane roof
Purlin spacing by zone
Purlins sit closer together in the edge and corner zones, and lap or sleeve over the frames so they act as continuous beams.
Fasteners at every rib
In the edge and corner zones the sheet is fixed at every rib, with screws and sealing washers chosen for marine exposure.
Flange braces
Uplift puts the inner flange of the purlin in compression; flange braces back to the rafter stop it from twisting out.
Thicker sheet where it counts
Sheet thickness and profile are picked for the zone pressure, not only for looks, and the substrate for the salt air.
Openings framed for the storm
Dock doors, roller shutters and windows get framing sized for the full wind load, so the opening does not become the weak point.
Anchor bolts sized for uplift
Each column base carries uplift and shear; bolt size, edge distance and embedment go to the foundation design.
The chain
Every link stronger than the pull on it
The roof holds only as well as its weakest link. Each link has its own way of failing, and we check each one against the suction of the zone it sits in.
Cladding
Cladding for wind and salt at once
We supply roof and wall cladding with the steel so the sheet, the screws and the purlins are designed together, for the zone pressure and for the salt air.
Real World Steel photos
Purlins, frames and cladding we supplied
Buildings framed with World Steel purlins and frames, and members in our plant. None is shown as a Caribbean site.
Caribbean hurricane and marine guides
The rest of the storm and salt-air story
The code, port and parishes of each island are on its own page:
Questions
Questions on roof uplift and cladding
Why do roofs fail first in a hurricane?
Roofs carry suction over their whole area and the highest peaks at the edges and corners. If one sheet or one fixing lets go, wind gets under the roof and the load on everything else jumps.
Do you supply the roof and wall sheeting?
Yes. We can supply roof and wall cladding, flashings, trims and fasteners with the steel, chosen for the zone pressures and the salt air of the site.
What screws do you use near the sea?
Screws with a coating class meant for marine exposure, or stainless steel, always with sealing washers. Where stainless meets coated steel we isolate it so the two metals do not corrode each other.
Can an existing roof be upgraded?
Often, by adding purlins and fasteners in the edge and corner zones. We can design and fabricate the added steel from your survey; your engineer checks the existing structure.
Do you supply hurricane-rated doors and windows?
We frame the openings for the full wind load. Rated doors, shutters and glazing are specified by your engineer and are usually bought locally.
Who sets the anchor bolts?
Your team, from our anchor bolt plan. We give the bolt layout, size, projection and the reactions at every column.
Need a roof that stays on?
Send the plan, roof slope and site. We size purlins, fixings and connections zone by zone for the wind your engineer sets and supply the steel and cladding as one package.