Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Utah · Mining and refining

Structural steel for Utah mining and refining plants

Utah has one of the largest open-pit copper mines in the world on the edge of the Salt Lake Valley, with a smelter and refinery nearby, and potash, magnesium, salt and other mineral plants across the west desert and the Uinta Basin. These plants need heavy process buildings, crane bays and conveyor steel built to owner specifications.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and landed at Los Angeles–Long Beach or Oakland for your Utah site.

Stiffened heavy plate girders resting on shop supports
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.
Minerals
Copper, potash, magnesium
Projects
Process plants, truck shops
Specs
Owner standards
Coating
Galvanized or painted

Why it matters

Heavy steel to owner standards

Mining and refining owners write their own structural, welding and coating standards, and their plants carry heavy cranes, equipment and conveyors. Steel has to match those standards, arrive complete and fit the shutdown or construction window.

We fabricate heavy built-up members, crane and conveyor steel to the owner specification, galvanize or paint them for the exposure, and pack each load against the erection sequence.

What we design and fabricate

Steel for mines and refineries

Process buildings

Heavy frames and crane bays for process equipment.

Truck shops

Tall bays and cranes for haul truck maintenance.

Conveyor steel

Trusses and supports for long conveyor runs.

Coatings

Galvanized or painted systems for the exposure.

Who does what

Plant steel, split clearly

World Steel supplies

  • Heavy built-up members, crane and conveyor steel
  • Fabrication to the owner’s specification
  • Galvanized or painted coating systems
  • Loads packed against the erection sequence
  • Tekla shop and erection drawings, included

The US contractor arranges

  • The owner contract and site access
  • Engineer of Record approval and PE seal
  • Permits and inspections
  • Foundations and equipment installation
  • Erection and site work

Utah

What we do not claim

World Steel names no mining or refining company as a customer and claims no completed mine project in Utah. We fabricate the structural steel for the US contractor who builds the plant.

Utah ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Utah contractors

Utah contractors: let’s win the next project together

If your next bid involves mining and refining, World Steel wants to be your long-term, win-win steel partner in Utah. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Utah project is cut, welded, inspected and packed.

Finished columns with base plates resting on shop rails
Finished columns laid out for dimensional checks, World Steel, Vietnam.
Welder guiding a drilled base plate hanging from a jib hoist
A drilled base plate on its way to fit-up in the Vietnam plant.
Roller conveyor carrying members into a shot-blasting machine
Surface preparation: the automatic shot blaster at the Vietnam plant.
Rows of labeled steel bundles ready to leave the plant
Labeled bundles lined up for dispatch from World Steel in Vietnam.

Q&A

What Utah buyers ask

Can you fabricate to an owner’s specification?

Yes. We work to the owner’s structural, welding and coating standards as written into the contract.

Do you galvanize?

Yes. Members can be hot-dip galvanized or painted, depending on the exposure and the owner specification.

Can you supply conveyor steel?

Yes. Conveyor trusses, bents and walkways can come in the same package as the buildings.

Official sources: Utah Geological Survey: energy and minerals

Utah solutions

Every Utah guide

Related pages

Code facts on this page summarize Utah practice, the Utah State Construction Code, the IBC with Utah amendments, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in Utah?

Send the drawings or the site address, size and use. We set the Utah design basis with your Engineer of Record, design or detail the steel to the Utah State Construction Code and for seismic and snow loads, and quote it made in our plant in Vietnam, packed in erection order and landed at Los Angeles–Long Beach or Oakland for the rail or truck run to your site.