West Virginia · Manufacturing
Structural steel for Ohio Valley manufacturing plants
The Ohio River side of West Virginia, from Weirton and Wheeling through Parkersburg to Huntington, holds metals, polymer and manufacturing plants, and new plants are going up on old industrial sites. They need production halls, crane bays and heavy runway girders. We fabricate that steel bay by bay.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore or Norfolk for your West Virginia site.
- Corridor
- The Ohio River
- Typical steel
- Halls and crane bays
- Cranes
- Runway girders
- Release
- Bay by bay
Why it matters
New plants on old industrial land
Many Ohio Valley projects reuse old mill sites on narrow river terraces, with cranes, rail sidings and flood zones to plan around. New bays often join existing buildings.
We fabricate crane columns, runway girders, built-up members and platforms in our plant with mill certificates traced by heat, and release each bay to suit the site.
What we design and fabricate
Steel for industrial plants
Crane columns
Built-up and stepped columns for overhead cranes.
Runway girders
Crane runway beams with fatigue details.
Long-span halls
Clear-span frames over production lines.
Equipment supports
Platforms and frames for process equipment.
Who does what
Plant steel, split clearly
World Steel supplies
- Crane columns, runway girders and hall frames
- Platforms and machinery support frames
- Bay-by-bay releases for expansions
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Crane data from the crane supplier
- Engineer of Record approval and PE seal
- Foundations and crane rail installation
- Crane installation and commissioning
- Erection and site work
West Virginia
What we do not claim
World Steel names no West Virginia manufacturer as a customer and claims no completed West Virginia plant. World Steel can supply the overhead cranes with the steel; crane installation and commissioning are site scope.
West Virginia ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · West Virginia contractors
West Virginia contractors: let’s win the next project together
If your next bid involves Ohio Valley manufacturing, World Steel wants to be your long-term, win-win steel partner in West Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your West Virginia project is cut, welded, inspected and packed.
Q&A
What West Virginia buyers ask
Can you add bays to an existing plant?
Yes. We detail connections to existing frames from your survey.
Can you fabricate heavy crane bays?
Yes. We build crane columns and runway girders to the crane data.
Do you supply the cranes?
Yes, on request. World Steel can supply the overhead crane with the steel, designed to CMAA 70 or 74, so wheel loads and clearances are set in one design. If you buy the crane elsewhere, we design the runway to that supplier’s data. Installation, commissioning and the load test are site scope.
Official sources: West Virginia Department of Economic Development
West Virginia solutions
Every West Virginia guide
Related pages
Code facts on this page summarize West Virginia practice, the West Virginia State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in West Virginia?
Send the drawings or the site address, size and use. We set the West Virginia design basis with your Engineer of Record, design or detail the steel to the West Virginia State Building Code, mountain snow and valley floods, and quote it made in our plant in Vietnam, packed in erection order for mountain roads and delivered through Baltimore or Norfolk.