Wisconsin · Commercial code
Structural steel and the Wisconsin Commercial Building Code
Wisconsin has one commercial building code for the whole state, chapters SPS 361 to 366, adopted from the IBC with Wisconsin amendments and administered by the Department of Safety and Professional Services. Many commercial buildings need plan approval before construction starts, from the DSPS or a municipality the state has delegated.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and sent by rail through Chicago to your Wisconsin site.
- Statewide code
- SPS 361–366, IBC based
- Administered by
- Dept. of Safety and Prof. Services
- Plan review
- DSPS or delegated city
- Our part
- Code edition on sheet one
Why it matters
Approved plans before the first footing
In Wisconsin, plan approval is a real step in the schedule. The submittal needs drawings and calculations that the reviewer can follow, and changes after approval can mean a revision. Getting the steel design basis right at the start keeps the review short.
We confirm the code edition and loads with your Engineer of Record before modeling, state them on the first calculation sheet, and prepare the steel calculations and drawings your team submits for plan approval.
Design basis
What the steel design states
The items we confirm with your Engineer of Record before modeling.
| Item | What we state |
|---|---|
| Code edition | The Wisconsin Commercial Building Code and the IBC it adopts |
| Snow | Ground snow, drift and sliding snow for the site |
| Wind | ASCE 7 wind speed, exposure and risk category |
| Frost | Frost depth for anchorage, from your engineer |
| Seismic | Site class and seismic design category |
Who does what
Codes and plan review, split clearly
World Steel supplies
- Steel design or detailing to the stated code basis
- Calculations and drawings for the plan submittal
- Answers to reviewer comments on the steel
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Plan approval submittal and fees
- Engineer of Record approval and PE seal
- Local permit and inspections
- Foundations and erection
- Special inspections where required
Wisconsin
What we do not claim
World Steel holds no Wisconsin approval and no Wisconsin engineering license, and does not submit plans for approval. Your Engineer of Record seals the design and your team submits it to the DSPS or the delegated municipality.
Wisconsin ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · Wisconsin contractors
Wisconsin contractors: let’s win the next project together
If your next bid involves commercial code and plan review, World Steel wants to be your long-term, win-win steel partner in Wisconsin. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your Wisconsin project is cut, welded, inspected and packed.
Q&A
What Wisconsin buyers ask
Does every Wisconsin project need state plan approval?
Not every one, but many commercial buildings do, from the DSPS or a delegated municipality. Your Engineer of Record confirms it for your building.
Do the loads change across the state?
Yes. Snow and frost rise to the north, so we confirm the loads for each address.
Can you answer plan review comments?
Yes. We answer comments on the steel design and revise drawings through your Engineer of Record.
Official sources: Wisconsin DSPS: commercial buildings
Wisconsin solutions
Every Wisconsin guide
Related pages
Code facts on this page summarize Wisconsin practice, the Wisconsin Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in Wisconsin?
Send the drawings or the site address, size and use. We set the Wisconsin design basis with your Engineer of Record, design or detail the steel to the Wisconsin Commercial Building Code and to snow, drift and frost, and quote it made in our plant in Vietnam, packed in erection order for rail through Chicago to your site.