New Hampshire · Seismic
Structural steel and New Hampshire seismic design
New Hampshire has moderate seismic hazard by US standards. The 1940 Ossipee earthquakes were felt across New England, and soft soils can raise the Seismic Design Category. Your Engineer of Record sets the category for each site. We design the bracing for it and detail to AISC 341 where it applies.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through New York or Boston for your New Hampshire site.
- Hazard
- Moderate
- Reference events
- 1940 Ossipee
- Design
- AISC 341 where it applies
- Welds
- AWS D1.8-qualified
Why it matters
Moderate is not zero
A hospital, school or plant on soft valley soils can land in a Seismic Design Category that changes how bracing and connections are detailed, and essential buildings carry a higher importance factor.
We design the lateral system for the category your engineer sets, detail to AISC 341 where it applies and weld demand-critical joints with AWS D1.8-qualified WPS and welders.
What we design and fabricate
Steel for seismic categories
Braced frames
Special concentric and buckling-restrained frame steel.
Moment frames
Prequalified connections under AISC 358 where specified.
Demand-critical welds
Welds made by AWS D1.8-qualified welders with procedures on file.
Anchorage
Base plates and anchor rods for the seismic reactions.
Who does what
Seismic steel, split clearly
World Steel supplies
- Lateral system steel designed or detailed to AISC 341 where it applies
- AWS D1.8-qualified procedures and welders for demand-critical welds
- Protected zones marked on the members on request
- Mill certificates traced by heat, with Charpy results on request
- Tekla shop and erection drawings, included
The US contractor arranges
- Site class and Seismic Design Category by the Engineer of Record
- Engineer of Record approval and PE seal
- Special inspections and the quality assurance plan
- Foundations and anchorage installation
- Erection and site work
New Hampshire
What we do not claim
AISC 341 is a design standard, not a fabricator certificate, and World Steel holds no New Hampshire engineering license. We design and fabricate to AISC 341 where it applies, and your Engineer of Record approves and seals the design.
New Hampshire ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Hampshire contractors
New Hampshire contractors: let’s win the next project together
If your next bid involves moderate seismic, World Steel wants to be your long-term, win-win steel partner in New Hampshire. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Hampshire project is cut, welded, inspected and packed.
Q&A
What New Hampshire buyers ask
Does New Hampshire need seismic design?
Yes. Every building is checked for the category your engineer sets.
Is AISC 341 always required?
Only where the category and system call for it. Your engineer decides.
Is AISC 341 a certificate?
No. AISC 341 is a design standard. We design and fabricate to it where it applies.
Official sources: New Hampshire Geological Survey
New Hampshire solutions
Every New Hampshire guide
Related pages
Code facts on this page summarize New Hampshire practice, the New Hampshire State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Hampshire?
Send the drawings or the site address, size and use. We set the New Hampshire design basis with your Engineer of Record, design or detail the steel to the New Hampshire State Building Code, mountain snow and seismic, and quote it made in our plant in Vietnam, packed in erection order and delivered through New York or Boston to your site.