Hotels and resorts
Palm Beach, Noord, Oranjestad
High-rise and low-rise hotels, timeshare blocks and long-span lobbies designed for wind and salt.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Aruba guides
DIP permits and the choice of Eurocode or US codes, trade winds and passing storms, the region’s harshest salt and sun, the hotel towers of the north-west, the port of Barcadera, and the energy, water and industry buildings an island without rivers needs, one guide each.
National symbols of Aruba
The red four-pointed star edged in white, the divi-divi tree bent by the trade winds, the shoco owl of the dry hills, and the sun and salt that shape every surface. Four symbols, and what each one means for the steel we make for Aruban buildings.
The four-pointed red star edged in white stands for the island and the four points of the compass. Every load on a frame is checked from all four directions.
The divi-divi grows bent to the south-west by the trade winds. Steady wind from one side shapes Aruban buildings too, from wind loads to the side the salt comes from.
The small burrowing owl of Aruba nests in the ground of the dry hills. Ground conditions matter for every foundation we supply base plates for.
Sun almost every day, little rain and the sea on every side. Coatings for Aruba are chosen for strong sun and heavy salt together.
Project types
The four project types behind most steel orders on the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Palm Beach, Noord, Oranjestad
High-rise and low-rise hotels, timeshare blocks and long-span lobbies designed for wind and salt.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Oranjestad and every region
Composite frames for offices, clinics, schools and public buildings.
Going up beside the plant in Vietnam: World Steel framed its own office building.
San Nicolas, Barcadera, the east coast
Wind and solar substations, power and desalination buildings, pipe racks and workshops.
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Barcadera, Oranjestad, Santa Cruz
Clear-span warehouses, distribution and retail buildings near the port.
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.
Eight regions on one long, dry island
Aruba has eight census regions along its length: Noord with the hotel coast, Oranjestad West and Oost in the capital, Paradera, Santa Cruz and Savaneta in the centre and on the south coast, and San Nicolas Noord and Zuid at the eastern end. Each page covers the main town, the ground, the wind and salt conditions, the haul from Barcadera and the steel we recommend for what gets built there. The region map is schematic.
The hotel coast and the capitalThe centreSan Nicolas and the east
Noord, Oranjestad West and Oranjestad Oost: the high-rise and low-rise hotels on the north-west beaches, the capital, the cruise harbour and the airport.
Paradera, Santa Cruz and Savaneta: the rock formations and the Hooiberg, the road into Arikok National Park, and the island’s oldest town on the south coast.
San Nicolas Noord and San Nicolas Zuid: the second town, the old refinery area, the wind farms and the beaches at the eastern tip.
Why World Steel
2,500 metric tons of structural steel a month from our own plant, released building by building.
Large-project program →Calculations that state the code basis, Eurocode or US, for your engineer and DIP.
Building permits guide →Frames and cladding designed for strong, steady trade winds and the storms that pass close by.
Wind guide →Paint systems and galvanizing chosen for the most corrosive salt air in the region.
Coatings guide →Composite frames for high-rise and low-rise hotels, released floor by floor.
Hotels guide →Packed in erection order and shipped to the port of Barcadera on the south coast.
Port delivery guide →Buy it all in one place · Aruba
High-rise hotels, energy and water plants, warehouses near Barcadera. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Barcadera, with every piece tracked live in PEB Studio.
All solutions and products for Aruba→Picked for Aruba
Hurricane, salt air and earthquake guides
Also from the same plant
One desk, every step
No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.
Seeking Aruban contractor partners
Hotels and timeshare towers on the north-west beaches, the airport, schools, clinics and offices in Oranjestad, warehouses near Barcadera and energy and water buildings are large steel packages for a small island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Barcadera and back your bid with drawings and live tracking.
Hurricanes, salt air, earthquakes
A broad hazard picture for Aruba and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.
Real World Steel photos
Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Aruba.
Questions from Aruban buyers
Building permits are handled by the Department of Infrastructure and Planning (DIP). Your engineer of record agrees the code basis for the structure, often Eurocode, Dutch NEN or US codes, with the authorities. We state that basis on the first sheet of our calculations.
Rarely. Aruba lies near the southern edge of the hurricane belt, but storms such as Ivan in 2004 and Matthew in 2016 passed close enough to bring heavy seas and rain. Strong trade winds blow most of the year. We design for the wind your engineer sets.
Aruba lies near the boundary of the Caribbean and South American plates, and seismic loads are usually low to moderate. Your engineer sets the values; we design and detail the frame to suit.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
The port of Barcadera, Aruba’s cargo port on the south coast between Oranjestad and Savaneta. The harbour in Oranjestad serves cruise ships.
No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.
Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Aruba and the US standards it references. We hold no approval, licence or registration in Aruba and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.
Contact World Steel · Aruba
WhatsApp, email or a video call with our engineers, booked at an hour that suits Oranjestad. Our contact page for Aruba has the ports, the local time and the form.