- Location
- Can Tho City, Vietnam
- Building type
- Factory
- Year
- 2024
- Structural steel
- 5,000 t
Project overview
About Sunpro Steel Factory
World Steel designed, fabricated and supplied the steel structure for Sunpro Steel Factory in Can Tho City, Vietnam, completed in 2024. A building for a steel-industry owner tends to be judged by people who know the material well, so its frame, connections and finish are looked at with a trained eye rather than taken on trust.
US metal service centers, roll formers and fabricators building a new shop can draw on this reference. Their buildings often need heavy handling loads and long clear runs for material. We design to AISC 360 and AISI S100 under IBC 2024 and ASCE 7-22, unless your Engineer of Record sets another basis. Tell us your material flow and building size.
About 5,000 tonnes makes Sunpro Steel World Steel's largest project, roughly two months of the plant's capacity. It shows the company can design, fabricate and deliver a package that size in planned phases, the scale large US general contractors need for major industrial work.
Gallery
Sunpro Steel Factory images
Site photos are marked “Photo”. Images marked “3D model” come from World Steel’s design model and are not photographs.
In context
Sunpro Steel Factory by the numbers
Steel weight
About 5,000 metric tons of structural steel (5,512 short tons), about 2 months of the plant's 2,500 t monthly fabrication capacity.
It is the largest of the 20 projects on this site with a published steel tonnage.
In the portfolio
Sunpro Steel Factory is one of 33 factories in the World Steel portfolio on this site, and one of 43 projects listed for Vietnam.
World Steel supplied Sunpro Steel Factory in 2024, together with 16 other projects shown here from that year.
Closest in steel weight:
Design points
What a factory needs from its steel
General points for every factory, not specific to this one.
Process first, frame second
Production lines, crane coverage and utility runs are laid out first, and the frame is sized to carry what they need.
Learn more →Mezzanines in the model
Offices, control rooms and equipment decks are part of the main structural model rather than bolted on later.
Learn more →Heat, cold and condensation
Insulation, ventilators and louvers are chosen for the process heat and the IECC climate zone, so the shop floor stays workable year-round.
Learn more →How we work
How World Steel delivers a building like this
Project record
- Scope of supply
- Factory. Steel structure design, fabrication and supply by World Steel.
More projects
Related projects
Photo
Hai Phong City, Vietnam · 2020
Hai Duong Tongwei Animal Feed Factory
Factory
Photo
Dong Nai Province, Vietnam · 2020
GPPD Energy Factory
Factory
Photo
Tay Ninh Province, Vietnam
Tay Ninh AA Corporation Factory
Factory
Photo
Request a quote
A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site.
Start a quote →Planning a factory in the United States?
Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.