Made in Vietnam, landed at Virginia
Why ship your building through Virginia
The Port of Virginia runs Norfolk International Terminals and Virginia International Gateway for containers, Newport News Marine Terminal for breakbulk and ro-ro, the Virginia Inland Port at Front Royal and the Richmond Marine Terminal on the James River. Its Wider, Deeper project brought the main channels to 16.8 m (55 ft) in 2026.
Your steel is fabricated in World Steel’s plant in Vietnam and arrives in Hampton Roads through the Panama Canal on most services. Norfolk Southern and CSX trains run straight from the terminals to the Ohio Valley and the Midwest.
-
One package, one plant
Primary frames, secondary steel, panels, trims and fasteners from World Steel’s plant in Vietnam. The steel comes mainly from mills in Vietnam, each heat on record.
-
Accredited fabrication
World Steel is the first and only steel building plant in Vietnam accredited under IAS AC472.
-
Designed to US codes
IBC and ASCE 7 loads, steel designed to AISC 360, with drawings ready for your engineer’s review.
-
Packed for this port
Containers or breakbulk sorted by erection sequence, with seal numbers, weights and photos in the packing report.
Port facts
Terminals, channel and connections at Virginia
Channel
16.8 m (55 ft) channels, completed 2026
Rail
CSX and Norfolk Southern, on-terminal rail
Highways
I-64, I-264, I-664
| Terminal | Where / operator | Cargo |
|---|---|---|
| Norfolk International Terminals | Norfolk | Containers |
| Virginia International Gateway | Portsmouth | Containers |
| Newport News Marine Terminal | Breakbulk and ro-ro | Breakbulk |
| Richmond Marine Terminal | Barge link up the James River | Breakbulk |
Source: The Port of Virginia: facilities, USACE and port notices, last reviewed November 17, 2026. Terminal operators and depths change; your booking names the terminal for your cargo.
From our plant to Virginia
How your steel gets here
Through the Panama Canal and up the Atlantic coast to the Chesapeake Bay entrance on most services; some services use the Cape of Good Hope or the Suez Canal.
Your shipment to Virginia, leg by leg
Run the full simulation →By road
About 2 hours
World Steel pays
By sea · via Panama
≈ 12,000 nmi illustrative lane
Split between us
Customs, truck or rail
Planned with your trucker
You pay
Risk passes to you when the steel is on board the vessel at the named Vietnamese port.
Inland reach
Where steel goes from Virginia
On-terminal rail sends double-stack trains west over the Norfolk Southern Heartland Corridor and CSX lines to Ohio and Chicago. Containers for Richmond can ride the barge up the James River.
Designed for the region
Site conditions we design for around Virginia
Hurricane Coast Steel Buildings
Coastal Virginia is in the hurricane-prone region; wind governs.
How we design for itSnow Load Steel Buildings
Western Virginia and the Appalachians need snow and drift loads.
How we design for itOn arrival
Receiving your steel at Virginia
Ohio and Midwest jobs
Ask about double-stack rail from Norfolk to an inland ramp.
Federal buyers
Confirm any foreign-steel restrictions with your contracting officer before ordering.
Richmond barge
The James River barge can save a truck leg to central Virginia.
Documents sent ahead to your broker
- Commercial invoice and packing list per container
- Bill of lading and certificate of origin
- Container packing report with seal number and VGM
- EN 10204 3.1 mill certificates
- Shipping marks with a QR link to each member’s passport
What the quote states for Virginia
- The Incoterm, for example FOB Vietnam, CFR or CIF Virginia
- Who acts as importer of record
- Containers, flat racks or breakbulk for oversize members
- Delivery to the port or to a named US place, if offered
No prices, freight rates or duty estimates are published.