Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA
Long shop floor of built-up members, overhead cranes and a center walkway

One of the World Steel fabrication halls in Vietnam where US orders are built.

Growth opportunities

Workforce housing · Modular · Multifamily

Residential & Modular Construction

Repeatable steel frames and modules for multifamily and workforce housing. Workforce housing, modular units and multifamily buildings assembled from repeatable steel components.

Frames
Braced steel frames and modular kits
Floors
Composite deck on steel beams
Packing
By unit or by floor
Envelope
Roof and wall assemblies to your IECC edition
Typical sectionIllustrative
Illustrative section of a residential & modular construction steel buildingFour storiesComposite floor steelBraced baysRepeatable columnsSteel stairs

Illustrative multifamily frame, not a design. Fire separation and acoustics are set by your architect.

Design once, build many

Repeatable steel that makes housing faster to build

Housing works best when the hundredth unit goes up like the first. We standardize members and connections, fabricate them in batches in Vietnam and pack them the way your crews build.

Standard bays

A small set of bay sizes and repeated connections cuts fabrication time and field labor.

Learn more →

Composite floors

Steel beams and metal deck create floors that go in quickly and carry partitions without fuss.

Learn more →

Kits packed by unit

Each unit or floor arrives as its own bundle, so crews open a familiar kit every time.

Learn more →

Energy-code envelope

Roof and wall assemblies are selected to meet the IECC edition your city has adopted.

Learn more →

In the US market

Housing shortages and tight construction labor markets push developers toward systems that move work off site. Modular builders also need frames that repeat accurately from one unit to the next.

What the building needs

A frame designed once and produced many times, roof and wall assemblies that meet the local energy code, and framing protected inside the wall cavity.

How World Steel helps

Members and connections are standardized across units, fabricated in batches and packed by unit or floor, so each crew opens a familiar kit.

Made in our Vietnam plant

What we supply

  • Cold-formed steel framing
  • Structural steel frames
  • Modular steel components
  • Prefabricated framing kits
  • Roof and wall panels

Products · Steel buildings

Building types and the frames behind them

Each type starts from a building package we already make in Vietnam, then gets engineered for your site, your codes and your layout.

All steel buildings →
Portal frames standing during erection on a cold site Photo

Modular building

Repeatable modular steel frame

Starts from: Self-Storage Buildings

Mobile crane lifting a member into a multi-story steel frame Photo

Multifamily building

Braced steel frame with composite deck floors

Starts from: Multi-Story Steel Buildings

Warehouse frame from above, purlins and girts fixed to the rafters and columns Photo

Building packages

Planned steel building packages for the building types US owners ask for most.

See packages →

Engineering

Engineered for US codes, your site and this use

Our engineers design to the code edition your jurisdiction has adopted, and deliver calculations and drawings ready for your Engineer of Record to review and approve.

Questions your engineer will raise

  • Standard bay sizes and repeated connections reduce fabrication and field labor.

  • Cold-formed framing inside the wall is protected to suit the climate zone and the wall assembly.

  • Fire separation, acoustics and IRC or IBC residential provisions are confirmed by the project architect.

Your Engineer of Record sets the design values, and your local building department decides which code edition and amendments apply.

IBC 2024ASCE 7-22AISC 360AISI S100AWS D1.1AWS D1.3

Site conditions to review

IAS AC472 accreditedWorld Steel is the first and only steel building plant in Vietnam accredited to IAS AC472 for design and fabrication inspection.

Solutions · End to end

From our plant in Vietnam to your site in the US

One partner carries your residential & modular construction building from the first calculation to the last container. Westminster, California is our US office; every member is made in Vietnam.

  1. Engineered to US codes

    Designed to IBC 2024 and ASCE 7-22, with drawings ready for your engineer’s review and approval.

    Steel building design →
  2. Made in our Vietnam plant

    Cut, welded and coated in World Steel’s own IAS AC472-accredited plant, from steel rolled mainly in Vietnam and ordered to US grades.

    Inside the plant →
  3. Tracked live in PEB Studio

    Watch each of your members move through fabrication and QC release, in real time.

    PEB Studio →
  4. Shipped to a US port

    Packed by erection sequence and shipped to West, Gulf or East Coast ports, then trucked to site.

    Vietnam to USA →
  5. Erected by your team

    Piece marks, erection drawings and packing lists let your erector start straight away.

    How we work →

PEB Studio

Watch your building being made, in real time

Log in to PEB Studio and follow every column, rafter and purlin of your project through cutting, welding, coating and QC release at our Vietnam plant. Your team plans erection around real progress, not promises.

PEB Studio production dashboard with fabrication progress by stage (demonstration data) Demonstration data
Live production status

The Residential & Modular Construction ecosystem

Everything that connects to your building

Products you can buy, solutions that deliver them, the states we ship to and the people we work with. Each link opens its own page.

Projects

Similar buildings we have fabricated

Comparable building types from our portfolio, with US work, including the US territory of Guam, shown first.

All projects →

Questions and answers

Residential & Modular Construction: what US contractors ask us

16 straight answers on design, fabrication in our Vietnam plant, shipping and who does what on your project.

Planning a steel housing project 4 answers

Can the same design be reused on another site?

Yes. A repeatable building can be fabricated again, with wind, snow and seismic loads re-checked for each new address.

Which housing types use your steel?

Multi-family podiums and frames, workforce and student housing, light-gauge framed buildings, garages and amenity buildings, and steel for modular builders.

Can steel framing reach several stories?

Yes. Braced or moment frames with composite deck floors support multi-story housing to the height the code and your Engineer of Record allow.

What do you need from the architect?

Floor plans, sections and elevations, the site address and the floor and wall assemblies they intend to use. Early plans let us place columns inside walls rather than rooms.

Framing and assemblies 4 answers

Do you supply complete modular units?

We supply the steel: frames, floor steel, stairs and roof and wall panels. Interior finishes and services are completed by your modular builder or contractor.

Who handles fire separation and acoustics?

Your project architect. We provide the steel that their wall and floor assemblies sit on, and coordinate openings and connections with their design.

Do you supply cold-formed steel framing?

Yes. Cold-formed members are designed to AISI S100 and fabricated with the primary steel, so the whole frame is coordinated in one model.

Can balconies and stairs be included?

Yes. Balcony framing, stair stringers and landings are detailed with the main frame and shipped labeled by unit and level.

Fabrication and delivery 4 answers

Is steel framing made in the US?

No. Every piece is fabricated in World Steel’s own plant in Vietnam from steel ordered to US grades, mainly from Vietnamese mills, and shipped to the US. Westminster, California is our office.

Can you supply a large multi-building development?

Yes. The plant fabricates up to 2,500 metric tons (2,756 short tons) of steel a month, and repeated buildings move through production as separate lots.

How is steel packed for a housing site?

By building, level and unit, with piece marks matching the erection drawings, so crews unpack only what they set next.

Can the developer track progress?

Yes. PEB Studio shows every member’s status in our plant in real time, so the developer and contractor plan the site around actual production.

Scope and approvals 4 answers

Does World Steel build the housing?

No. World Steel designs, fabricates and supplies the steel. The US contractor, our customer, erects it and completes the building.

Who approves the structure?

Your Engineer of Record reviews and approves our calculations and drawings, and the PE seal and permits stay with the US project team.

Are shop drawings included?

Yes, for every project and at no extra cost, reviewed by your team before fabrication.

Can the steel carry our brand as a modular builder?

Yes. OEM and private-label supply puts your labels on every piece and bundle, while the steel is still made in World Steel’s plant in Vietnam.

Ready to scope your housing project?

Send a footprint, a sketch or a full drawing set. An engineer checks it against US code requirements and replies with exactly what World Steel would make in Vietnam and ship to your port.