Where it sits in the US code stack
Where it governs in your building
Zone by zone
Why the purlins on one roof are not all the same
Wind suction peaks at corners and edges, and drifted snow piles up at steps and parapets. AISI S100 sizes each purlin for the zone it sits in, so the roof plan on our drawings changes spacing, gauge and lap length across the roof.
Corner zones
Highest suction under ASCE 7 components-and-cladding pressures. Closest purlin spacing, heaviest gauge, extra screws.
Edge zones
High suction along eaves, rakes and ridge. Tighter spacing than the field of the roof.
Interior zone
Lowest wind pressure; snow and roof live load often govern. Widest economic spacing.
Drift zones
Where a higher roof, parapet or rooftop unit collects snow. Purlins sized for the drift height and length.
Z purlins
Nest and lap over the frames to act as continuous beams across bays: lighter for the same span. Used on roofs and long side walls.
C sections
Square ends for end walls, door jambs, headers and eave struts where laps are not possible.
14 answers from our engineers
AISI S100 questions and answers
What contractors and engineers ask about cold-formed purlins and girts designed to AISI S100: buckling, laps, bridging, panel bracing, coatings and what the drawings show. Pick a topic.
How thin steel behaves 4 answers
Why do purlins fail?
Most often because corner and edge uplift or drift near a roof step was underestimated, bridging was left out, or screws pulled out. Our drawings address all three explicitly.
What is distortional buckling?
A mode where the lip and flange of a C or Z rotate about the web junction before the whole member buckles. It is particular to cold-formed shapes, and AISI S100 has its own check for it, alongside local and global buckling.
Why is the bottom flange the problem under wind uplift?
Under snow, the top flange is in compression and the roof panels hold it. Under uplift, the bottom flange goes into compression, and nothing is screwed to it. Bridging, anti-roll clips and the panel's rotational restraint keep it from buckling.
What does the direct strength method mean for our purlins?
It is an AISI S100 method that predicts buckling strength from the member's whole cross-section rather than plate element by element. It handles complex lipped and stiffened profiles well; your reviewer will see which method governs in the calculations.
Laps, bridging and panels 4 answers
How long is a purlin lap, and who decides?
Lap length comes from the design: longer laps carry more moment over the frame. It varies across the roof, and our roof framing plan gives the lap and bolt pattern at every frame line so the erector does not have to guess.
Does a standing-seam roof brace the purlins like screw-down panels?
Much less. A screw-down panel braces the top flange well; a floating standing-seam roof with sliding clips gives limited restraint. We design for the roof system you choose, which can change purlin gauge and bridging.
What is bridging, and how many rows will we see?
Rows of bracing, often straps or angles, between purlins that stop them rolling and hold the unbraced flange. The number of rows depends on span, depth and uplift, and is shown on the drawings for each bay.
Can purlins carry a hung load such as a sprinkler main?
Yes, if the design allows for it. Concentrated hung loads should be within the collateral load stated on our drawings, hung at the locations shown. Larger point loads need their own support framing, which we design if you tell us early.
Girts and walls 3 answers
Are girts designed differently from purlins?
The same AISI S100 rules apply, but girts mainly resist wind pressure and suction on the walls, and their own weight acts sideways on the member. Sag rods and the wall panel attachment hold them straight.
Can girts be flush with the frame instead of bypassing it?
Yes. Bypass girts run outside the columns and are simpler; flush girts sit within the column depth for a thinner wall or an interior finish. Both are designed to AISI S100; tell us which your architect prefers.
How are openings framed in a girted wall?
With C-section jambs and headers designed for the door or window and its wind load. Large doors get their own jamb columns. Openings must be on the approved drawings; ones cut later in the field are outside our design.
Material and coating 3 answers
Are galvanized purlins enough?
In a closed, dry building, usually. Purlins under canopies, along open sides, in barns or close to the shore may need heavier zinc or paint, chosen from the exposure.
What steel are the purlins and girts made of?
Galvanized or uncoated high-strength sheet to the ASTM grade in your specification, such as A653 structural steel or A1011 for uncoated material, roll-formed to profile. The material schedule lists the grade and coating for each.
Are cold-formed members welded?
Rarely. They are bolted to clips on the frame and lapped with bolts, which keeps the zinc intact and makes erection quick. Where a sheet steel weld is needed in the plant, it follows AWS D1.3.
More answers on every US code we design to: search all standards questions.
How thin steel behaves
Why cold-formed members need their own standard
Thin plates
Local and distortional buckling can govern before the steel ever yields, and AISI S100 addresses both.
Open sections
A Z or C shape tends to roll and twist. Sheeting and bridging keep it upright, and the calculation takes credit for exactly that.
Load reversal
Snow compresses the top flange, but uplift compresses the bottom one, which is frequently unbraced.
Lapped spans
Overlapping Z purlins at the frames makes them continuous and lighter, provided the lap length and bolting are right.
Design choices
Decisions we make for your roof and wall framing
| Decision | What it does |
|---|---|
| Z or C shapes | Z shapes lap for continuity across roof bays; Cs work better at end walls, jambs and girt lines |
| Spacing by zone | Tighter at corners, edges and drift areas |
| Bridging and anti-roll | Holds the compression flange steady when uplift reverses the load |
| Panel attachment | Screw-down panels brace the purlin well; a floating standing-seam roof offers far less bracing |
| Coating | Zinc weight or paint selected for the exposure |
Who does what under AISI S100
Light-gauge members work as a system, so each party has a part
A purlin designed to AISI S100 relies on its laps, its bracing and the roof panel fastened to it. Leave one out and the design no longer holds, so the split of work is spelled out.
World Steel
- Designs purlins, girts and eave struts to AISI S100, including laps and bracing
- Roll-forms the sections from coil to the ASTM grade specified
- Punches the holes and supplies bridging and sag rods where the design needs them
US contractor, our customer
- Installs purlins with the laps and bolts shown on the drawings
- Fits bridging and sag rods before the panels go on
- Fastens the roof and wall panels to the schedule the design assumed
Inspector
- Checks laps, bolts and bracing against the drawings
- Confirms the panel fastening pattern
- Reports any field cut or damaged member before it is covered
Cold-formed review
Four cold-formed questions a reviewer asks, and the answer in our package
Cold-formed steel is thin, so the checks are about buckling, bracing and the supports.
Is the roof panel relied on to brace the purlins?
Where the design uses through-fastened panels as bracing, the panel and fastener schedule is stated, and added bracing is shown where it is not enough.
What are the lap lengths at continuous purlins?
Lap lengths are dimensioned on the drawings, and the checks at the lap ends are in the calculations.
Which thickness was used in the design?
The base steel thickness without the coating, confirmed by the coil mill certificates.
Was web crippling checked at the supports?
Web crippling and its interaction with bending checked at frames and at concentrated loads.
In your submittal file
Four records behind your purlins and girts
From the coil to the roof layout, each record links back to the design.
-
Purlin and girt layouts
Sizes, laps, bolts and bracing for every bay, for your approval.
Shop drawing coordination -
Sheet steel welds
Where a light-gauge part is welded in the plant, it follows AWS D1.3.
AWS D1.3 sheet steel
Real photos from World Steel
Purlins and girts on World Steel frames
Photographed in our own plant in Tay Ninh Province, Vietnam, and on World Steel jobs. Not stock images.
AISI S100 never works alone
The standards and guides it works with
Each link opens the full page, with its own questions and answers.
Scope
Every purlin and girt size is set by calculation for the specific project; we assume no standard size for any region.
Who does what
World Steel designs, fabricates and supplies the steel structure from its own plant in Vietnam. The US contractor, our customer, erects it, has the drawings approved and sealed by their Engineer of Record and pulls the permit.
Details confirmed in quote Edition: As referenced
Source record: https://worldsteelstructure.com/
Last checked: November 8, 2026. Editions change on a cycle, so your Engineer of Record confirms which one your jurisdiction enforces.
All US codes & standardsNeed roof and wall framing sized for a tough site?
Send the address, the panel type and any rooftop equipment. We size every purlin and girt to AISI S100 for its zone and show spacing, laps and bridging on the drawings.