Landed cost · Vietnam to USA

Landed cost of steel from Vietnam: the formula and a calculator

What a steel package really costs at your US job site is the goods value plus everything between our plant in Vietnam and your gate: ocean freight, insurance, US duties, CBP fees, clearance and trucking. Put in your own figures, see each line and export a PDF worksheet for your bid or your lender.

Rates as of . A planning tool, not a quote or customs advice. Verify every rate with your licensed customs broker.

The formula

Landed cost = goods + freight + duties + fees + delivery

Two lines do the heavy lifting: the customs value that duties are charged on, and the duties themselves. In the US the customs value is the transaction value, so international freight and insurance are left out of it when they are shown separately on the invoice.

FOB valuewhat you pay for the goods at the Vietnam port
Ocean freightVietnam port to US port
Insurancemarine cargo cover
DutiesMFN + Section 232 + AD/CVD
MPF + HMFCBP user fees
Broker, ISF, bondclearance services
Port to siteterminal, drayage, inland
Landed costcost at your job site

Customs value

CV = invoice − international freight − insurance

On an FOB invoice, CV is the invoice value. On CFR, subtract the freight; on CIF, subtract freight and insurance. Not CIF, as many other countries use.

Duties

Duty = Σ CV(line) × (MFN% + 232% + AD/CVD%)

Each HTSUS line has its own rates. Current Section 232 rates are on our Section 232 page.

CBP fees

MPF = CV × 0.3464%, min $34.58, max $670.86
HMF = CV × 0.125%

MPF floor and cap for fiscal year 2027 (October 1, 2026 to September 30, 2027) (CBP Dec. 26-14). HMF applies at seaports (19 CFR 24.24).

Calculator

Work out your landed cost

Type your own figures in US dollars. Everything is calculated in your browser and nothing is sent to us. Use the sample to see how the formula works, then replace it with your quotes.

Shipment

Incoterm on the commercial invoice
FOB: the invoice is the goods value at the Vietnam port. Freight and insurance are added below.
For cost per metric ton (and per short ton)
One per lot if the order ships in lots

Goods by HTSUS line

One row per tariff line. Rates in percent, from your broker: the HTSUS general rate (MFN), Section 232 and any AD/CVD or other duty.

International freight and insurance

Vietnam port to US port, from your carrier or forwarder
Leave empty to use the rate below
Of goods + freight + 10%, used when the amount is empty

Clearance and delivery to site

Entry, classification, disbursement
Single-entry bond, or your share of a continuous bond
Contingency for time past free time
For example state sales or use tax, if it applies

CBP fees and contingency

Of the subtotal

Prefilled: MPF 0.3464% with the fiscal year 2027 (October 1, 2026 to September 30, 2027) minimum and maximum, HMF 0.125%. CBP adjusts the MPF limits every October 1.

Each cost explained

Nine lines of a landed cost, and how each is worked out

Goods value (FOB)

Invoice value at the Vietnam port

What the buyer pays the seller for the steel, packed and cleared for export. On a CFR or CIF invoice the freight and insurance are inside this figure; the calculator takes them out again for the duty base.

Customs value

Transaction value, without international freight and insurance

The US values imports on the price actually paid, leaving out international freight and insurance when they are shown separately. Duties and the MPF are charged on this value, not on CIF.

Duties

Customs value × (MFN % + Section 232 % + AD/CVD or other %)

Each HTSUS line carries its own rates, so the calculator takes several lines. Section 232 is charged on the full customs value of a covered article.

Merchandise processing fee

Customs value × 0.3464%, between the minimum and maximum

One fee per formal entry, so splitting a large order into several entries adds a minimum each time.

Harbor maintenance fee

Cargo value × 0.125%

Charged on cargo unloaded at a US seaport. No cap.

Ocean freight and insurance

Your carrier’s and insurer’s quotes

Paid by the buyer on FOB terms, by the seller on CFR (freight) and CIF (freight and insurance). Insurance is often priced on CIF value plus 10%.

Clearance services

Broker entry fee + ISF filing + bond

Third-party charges from your broker and surety. A continuous bond spreads its premium over a year of entries.

Port to site

Terminal and chassis + drayage + inland freight

Terminal handling, chassis, drayage from the terminal and trucking to the site. Flat racks and open-tops cost more to move than standard boxes.

Storage and demurrage

Your contingency

Charged when containers sit past the terminal’s or carrier’s free time. A pre-filed entry and a booked trucker keep it low.

Questions for your broker

Six questions that keep a landed cost accurate

Not legal advice: these are the questions experienced US importers ask their customs broker before they commit to a number.

Classify before you order

Ask your broker to classify every line and consider a CBP binding ruling for a large or repeat order, so the duty you plan is the duty you pay.

Show freight and insurance separately

On CFR or CIF terms, an invoice that states freight and insurance separately lets them be left out of the duty base.

Plan the number of entries

Each formal entry carries its own MPF minimum and broker fee. Shipping in lots helps the site schedule but adds entries.

Size the bond once

A continuous bond sized to a year of duties can cost less than single-entry bonds on every lot.

Ask about foreign-trade zones

An FTZ can defer duty until goods leave the zone. Section 232 goods have special FTZ status rules, so ask your broker first.

Book the truck before the ship lands

Pre-filed entries and booked drayage keep containers inside free time and demurrage off the bill.

Landed cost questions

What US buyers ask about landed cost

What is landed cost for steel imported from Vietnam?

The total cost of getting the steel to your US job site: the goods value, ocean freight and insurance, US duties (normal duty, Section 232 and any AD/CVD), the MPF and HMF fees, customs broker, ISF and bond charges, and the port, drayage and inland trucking to the site.

Is US duty charged on FOB or CIF?

On the transaction value. International freight and insurance are left out when they are shown separately, so on a CIF invoice the duty base is the CIF price minus freight and insurance. The calculator does this for you when you choose CFR or CIF.

Does the calculator show World Steel prices?

No. It works only on the numbers you type. The sample button fills a round goods value of 100,000 and the published statutory rates so you can see how the formula works; freight and service lines stay empty for your own quotes.

Which rates should I use?

The HTSUS general rate for each line, the current Section 232 rate (listed with its source on our Section 232 page), any AD/CVD deposit rate your broker finds, and the MPF and HMF prefilled here. Rates change, so confirm them with your licensed customs broker on the day you plan.

Can I save the result as a PDF?

Yes. Export to PDF writes a one- or two-page worksheet in your browser with your inputs, every cost line, the total, the cost per metric ton and the date. Nothing is sent to our server.

Why is the MPF capped?

The merchandise processing fee is 0.3464% of the customs value but never less than the minimum or more than the maximum per entry. CBP adjusts the minimum and maximum each October 1.

Is sales tax part of landed cost?

There is no federal VAT on imports. State sales or use tax can apply to materials depending on the state and the contract; ask your tax advisor and add it under other costs if it applies.

Is this a quote or customs advice?

Neither. It is a planning tool. Your quote from World Steel states the scope, the Incoterm and the importer of record, and your licensed customs broker confirms the duties.

Ready for real numbers?

Send drawings or a footprint and your site address. Your World Steel quote states the scope, the Incoterm and the importer of record, so you can complete the landed cost with your broker.