Design optimization · Value engineering

Less steel, lower cost, and every member fits the container

Our engineers optimize your building before a plate is cut: tapered built-up frames that carry the same code loads with less steel, members sized to ship in standard containers, and materials from Vietnam plants ready for production. Every option is written up so your Engineer of Record can approve it line by line.

A steel frame split at engineered splices and packed into a 40 ft container A tapered portal frame with red splice points on its rafters. Arrows lead down to a 40 ft shipping container shown in cutaway, packed with the rafter and column pieces, purlins and panels. The container's internal length is 12,032 mm (39 feet 6 inches). SPLICE SPLICE RIDGE SPLICE Same design loads · less steel 40 FT CONTAINER · PACKED IN ERECTION ORDER 12,032 mm (39'-6") internal length
Every member fits a standard container

Photo: One of the World Steel fabrication halls in Vietnam where US orders are built.

Design basis
IBC 2024 · ASCE 7-22 · AISC 360 · AISI S100
Shipping
Every member fits a 20 ft or 40 ft container
Materials
US grades, mainly Vietnamese mills · EN 10204 3.1 certificates
Control
No VE option is built until your EOR signs it off

Why optimize the design

Six advantages you get before a plate is cut

Before a single plate is cut, our engineers optimize your building for the loads at your site, for our plant and for the trip across the Pacific. The result is a frame that carries the same code loads with less steel, ships in standard containers and goes into production quickly, from materials already available in Vietnam.

  • Welder beside a deep built-up girder running through the automatic line Photo

    Optimized steel tonnage

    Steel only where the forces need it.

    Tapered built-up frames follow the bending moment, and bay spacing, purlins and girts are tuned as one system. Your building carries the same code loads with the steel it actually needs, and the proposal reports the tonnage for your project.

  • Rows of columns, rafters and purlins inside a large steel building Photo

    Lower investment cost

    Less to buy, ship and erect.

    Less steel to buy, fewer shop hours, fewer containers and simpler bolted erection all lower the installed cost of the building. The proposal shows the effect of each option on your project, never a generic percentage.

  • Fitter comparing a built-up beam with its shop drawing Photo

    In-depth project assessment

    Engineers read your project before they quote.

    Engineers review your drawings, the code edition your jurisdiction enforces, wind, snow and seismic data, foundations, erection sequence and the route to your site, then write down the risks and options they find before you commit.

  • Rows of labeled steel bundles ready to leave the plant Photo

    Designed to ship in containers

    Every member sized to fit the box.

    Every member is detailed to fit inside a standard 20 ft or 40 ft shipping container, with splices placed by the engineer, not cut on the shop floor. Containers are the most economical way to move steel from Vietnam to the US, and they reach your port sealed.

  • Long shop floor of built-up members, overhead cranes and a center walkway Photo

    Fast response to your production schedule

    Approved drawings go straight to production.

    Design, detailing and fabrication sit under one roof, and the materials are already available in Vietnam, so approved drawings move into production without waiting on imported steel. Your production slot is booked against your site date and tracked live in PEB Studio.

  • Plate and coil strip racked by grade and heat number in the store Photo

    Quality materials from Vietnam plants

    EN 10204 type 3.1 mill certificates.

    Most of the plate, coil and sections come from steel plants in Vietnam, ready for our plant without long import queues. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and its heat number follows every member it goes into.

The wider view

What a well-optimized building does beyond the frame

Tonnage is where optimization starts, not where it ends. When we review your project we also look at what the design means for your foundations, your crew, the next phase of the building and the paperwork at the border.

  • Lighter foundations

    Lighter frames and pinned bases often reduce column reactions. We issue the anchor rod plan and reactions early so your foundation engineer can size footings from real numbers.

    Anchor bolts →
  • Faster, safer erection

    Repeated bolted connections, clear piece marks and containers packed in erection order mean fewer crane hours and fewer surprises for your crew.

    Structural bolts →
  • Ready for the next phase

    End walls, frames and foundations can be designed now for a future bay, mezzanine or crane, so expanding later does not mean rebuilding.

    Expansions & add-ons →
  • Envelope and energy code together

    Roof and wall panels, insulation and girt spacing are laid out together to meet the IECC for your climate zone with the fewest framing members.

    Insulated metal panels →
  • Coatings matched to exposure

    Interior members and exposed coastal or agricultural members each get the coating system their environment calls for, instead of one system everywhere.

    Coastal corrosion protection →
  • A leaner import file

    Section 232 duties are assessed on the value of the imported steel. A lighter, fully documented package keeps that base lean and makes the customs entry easier to check.

    Section 232 steel imports →
  • Smoother plan review

    An optimized design arrives with calculations that name each code check, so your engineer and the building department review a clear, consistent set.

    Steel building design →
  • Less steel, less embodied carbon

    Every ton of steel you do not buy is a ton that never has to be made, coated or shipped, which lowers the building’s embodied carbon along with its cost.

    Primary structural system →

From proposal to production

The drawings that carry your optimized design

Optimization happens in the drawings. Each stage below builds on the one before, and nothing moves to the next stage until the people who need to approve it have signed off.

  1. With the quotation

    Proposal drawings

    For projects World Steel designs: general arrangement, frame lines, elevations and the scope of supply the quotation covers, so you see exactly what the price includes.

    Reviewed by: You, your architect and your estimator

    See a sample set →
  2. After the contract is signed

    Approval drawings (APD) and Design Report

    Anchor rod plan with column reactions, framing plans, elevations and sections, plus the Design Report with the structural calculations. Your Engineer of Record reviews, approves and seals them for the permit.

    Reviewed by: Your Engineer of Record, architect and building department

    Learn more →
  3. After the APD is approved

    Shop drawings and Tekla model

    Assembly and single-part drawings, CNC files, roof and wall sheeting, erection drawings, bolt lists and the IFC model, all from one Tekla model. Included on every project at no extra charge.

    Reviewed by: Your reviewer, then our plant

    Learn more →
  4. Once sheets are released

    Fabrication to the approved revision

    Members are cut, welded, coated and inspected in our Vietnam plant against the approved revision, and PEB Studio records which revision every piece was made to.

    Reviewed by: You, live in PEB Studio

    Learn more →

What we need from you

To optimize your design, send us

  • Architectural drawingsPlans, elevations and sections with clear heights, openings and finishes.
  • Structural drawings, if you have themYour engineer’s design and calculations, or the structural concept, so we optimize from a known starting point.
  • Your preferred schemeFrame type, spans, bay spacing, cranes, mezzanines, any future expansion and anything you want kept as drawn.
  • Site address and code editionThe location sets wind, snow and seismic loads; we confirm the code edition your jurisdiction enforces.
  • Geotechnical reportSoil data lets us choose base fixity and report reactions your foundation engineer can use.
  • Your site dateThe day your site needs steel, so production and shipping are planned backward from it.

Advice from our engineers

Eight habits of steel building projects that run smoothly

Most cost and schedule surprises on a metal building are decided in the first weeks, long before steel is cut. This is what we ask every US owner, designer and contractor to settle early.

  • Freeze the design criteria first

    Agree the code edition, risk category, wind, snow, seismic and collateral loads in writing before the APD. Most late changes start with a load that was never confirmed.

  • Get the anchor rod plan out early

    Foundations are poured while your steel is in production. An early, approved anchor rod plan keeps the site from waiting on steel, or steel waiting on concrete.

  • Plan approval around the permit

    Once your engineer approves and seals them, the APD and Design Report go into your permit set. Building plan review should close before sheets are released for fabrication.

  • Mark up once, in one set

    Return one consolidated mark-up from your team for each submittal. Every change is clouded, answered in writing and reissued as a new revision.

  • Tell us about collateral loads now

    Sprinklers, solar panels, ducts and hung equipment add load. Known at the APD stage, they cost little; added after fabrication, they can mean new steel.

  • Decide on future expansion today

    A removable end wall or a frame sized for a future crane costs far less now than a retrofit later.

  • Agree special inspection early

    Ask your building official how they apply our IAS AC472 accreditation under IBC Chapter 17, so inspections are planned before production starts.

  • Settle the erection sequence

    Tell us where your crew starts. Containers are loaded in that order, and large jobs can ship in lots that follow it.

Real photos from World Steel

Where your optimized design becomes steel

No stock images: these are World Steel’s own fabrication halls, inspection and packing in Vietnam, and a finished World Steel building. Every optimized design ends up here, made in our own plant and packed for the container.

  • Long shop floor of built-up members, overhead cranes and a center walkway Photo

    One of the World Steel fabrication halls in Vietnam where US orders are built.

  • Two welders operating a submerged-arc welding station on a member Photo

    Submerged-arc welding of web-to-flange seams in the Vietnam plant.

  • Stiffened heavy plate girders resting on shop supports Photo

    Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

  • Quality inspector taking dimensions on a finished steel member Photo

    Dimensional check by QC in Vietnam before a member goes on to blasting and paint.

  • Coated members drying in rows on stands in the paint hall Photo

    Members drying in the World Steel paint hall in Vietnam after coating.

  • Packing hall with steel bundles, timber dunnage and loading racks Photo

    Timber dunnage and bundles in the packing hall at the Vietnam plant.

  • Painted members strapped into bundles and stacked for the voyage Photo

    Bundles made up for an export shipment at the Vietnam plant.

  • Long-span warehouse inside an industrial campus, seen by drone Photo

    World Steel building abroad, from the air (location not stated).

Where the money goes

Where the dollars hide in a steel frame

The structural cost of a metal building comes down to a few drivers: the tons of steel purchased, the shop hours spent turning plate and coil into members, and the cost of getting those members to the jobsite and standing them up. A design built from uniform, conservative sections is safe, yet it often buys steel in places where the forces are small.

Value engineering holds the design criteria constant, from risk category, wind speed and exposure to ground snow load, Seismic Design Category, collateral and live loads, and changes how the structure carries them. Because we design and fabricate under one roof, the engineer suggesting a change already knows what it costs to make, ship to a US port and bolt together.

Tons of steel

Web depth and plate thickness follow the moment diagram along each member instead of its peak.

Shop hours

Repeated details sized for automatic welding and CNC drilling reduce labor per ton.

Ocean freight

Every member sized and spliced to fit 20 ft or 40 ft containers, the most economical way to cross the Pacific.

Erection days

Bolted field splices, clear piece marks and erection-sequence bundles cut crane time at the site.

Designed to ship

Every member sized to fit a shipping container

Containers are the most economical way to move steel from Vietnam to the US. So the container is a design input from the first day, not a packing problem at the end.

  • Splice locations are set by the engineer in the design model, so every bolted field splice is designed and checked to AISC 360.
  • Long rafters and columns are split at points of low moment, then joined on site with shop-drilled bolted end plates.
  • Purlins, girts, panels and trim are cut to lengths that pack tightly with the frames, with no wasted space.
  • Containers are loaded in erection order, so the first box opened holds the first steel your crew sets.
  • Sealed containers protect members and coatings at sea and move straight from port to truck or rail.
Typical internal dimensions of ISO dry containers. They vary slightly by carrier, and we confirm them with the booking.
ContainerInternal lengthInternal widthInternal height
20 ft standard5,898 mm (19'-4")2,352 mm (7'-8")2,393 mm (7'-10")
40 ft standard12,032 mm (39'-6")2,352 mm (7'-8")2,393 mm (7'-10")
40 ft high cube12,032 mm (39'-6")2,352 mm (7'-8")2,698 mm (8'-10")
Steel bundles stacked high on a packing frame awaiting loading Photo
A packing frame in the Vietnam plant stacked with bundles before they are loaded out.
Gray members stacked and strapped together on a packing rack Photo
Gray members strapped into a bundle on the packing rack, World Steel, Vietnam.

Materials from Vietnam plants

Steel that is ready when your drawings are

Every ton of plate, coil and sections in your building comes from steel plants in Vietnam. Materials are available close to our plant, so production starts on your schedule rather than on an import queue, and every heat arrives with the steel mill’s EN 10204 type 3.1 inspection certificate.

What an EN 10204 3.1 certificate shows

  • The steel grade and the standard it was produced to
  • Measured chemical composition for the specific heat
  • Measured yield strength, tensile strength and elongation
  • The heat number that ties the certificate to the steel
  • Sign-off by the mill’s inspection department, independent of production
Shop worker taking a measurement on a steel plate in the yard Photo
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.

EN 10204 type 3.1 is the steel mill’s inspection certificate for the heat it supplies. World Steel matches each certificate to the plate on receipt, records the heat number before cutting and keeps the link to every piece mark in PEB Studio.

Built-up tapered members

Put the steel where the moment is

A rolled W-shape keeps the same depth and flanges along its full length, so it must be sized for its worst point, typically the knee of a rigid frame. Away from that point much of the section does little work.

A built-up member is welded from three plates, two flanges and a web, cut to order. That lets the web taper and the flange thickness step along the length: deep at the haunch where moment peaks, shallow at the base and toward the ridge where it drops off. The outcome is a clear-span frame that typically weighs less than its rolled equivalent, with no interior columns in the way.

Built-up I-sections are designed to AISC 360 like any other steel member and are standard practice in US metal building systems. Web-to-flange welds run on automatic submerged-arc lines to qualified procedures, and plate grades are confirmed per project and traced to mill test reports by heat number.

Tapered built-up frame compared with a uniform hot-rolled frame Half portal frames side by side. The tapered frame is deep at the knee and shallow at the base and ridge. The uniform frame keeps the knee depth everywhere, so steel near the base and ridge is under-used. Tapered built-up Deep at the knee, shallow at the ends max moment at the knee Uniform W-shape Knee depth carried full length under-used steel under-used steel
Diagram for illustration, not to scale. Real member depths are set by the calculations for your building.
QuestionTapered built-up frameRolled W-shape frame
How depth is setChanges along the member to follow the momentOne section chosen for the peak moment
Steel weightTypically lower on clear spans; quantified per projectHigher where the section is underused
Clear spanLong clear spans with no interior columnsLong spans need deeper, heavier shapes
Material sourcePlate cut to order in our plantRolled shapes from a mill or service center
ConnectionsShop-welded bolted end platesOften more field work or added plates
Best fitWarehouses, shops, ag buildings, gyms, plants, retailShort spans, mezzanines, some multistory framing
Welder beside a deep built-up girder running through the automatic line Photo
A deep plate girder going through automatic welding at World Steel, Vietnam.
Stiffened heavy plate girders resting on shop supports Photo
Heavy plate girders with stiffeners, fabricated by World Steel in Vietnam.

Designed to US codes

VE never moves the code goalposts

On a US project, value engineering changes how requirements are met, never the requirements themselves. Each option in our proposal names the code provision it was checked against.

Code or standardWhat it coversHow VE stays within it
IBC 2024Model building code, adopted and amended by each state or cityThe edition and local amendments are confirmed with your Engineer of Record and building department before design
ASCE 7-22Wind, snow, seismic, rain, live and collateral loadsLoads are fixed on the design criteria sheet; VE never lowers them
AISC 360Strength of hot-rolled and built-up steel, including its connectionsEvery tapered member and bolted end plate in a VE option is verified against it
AISC 341Seismic provisions where the system requires themBrought in whenever your SDC and chosen lateral system trigger it
AISI S100Light-gauge Z and C members such as purlins, girts and eave strutsSpacing and lap lengths optimized together with the roof and wall panels
AWS D1.1Structural weldingWeld sizes and WPS/PQR qualified before production
RCSC specificationHigh-strength bolted jointsBolt grade and joint type (snug-tight or pretensioned) shown on the drawings
IBC Chapter 17 / IAS AC472Special inspection and approved fabricatorsOur AC472 in-plant program aligns with IBC §1704.2.5; the building official decides how it applies

What we look at

Twelve places we look for savings

Some levers matter on a hangar and not on a self-storage row. Your review lists the ones that change the number on your building.

Taper the frame

Columns and rafters get deep where bending peaks and slim down where it fades.

Tune the bay spacing

Frame spacing balanced against purlin and girt weight for the lightest overall system.

Compare frame types

Clear span, modular and lean-to frames tested against the floor plan you need.

Rethink bracing

Rod, cable, portal or wind-column bracing selected around door openings and the load path.

Repeat connections

Fewer unique end-plate and splice details, all bolted in the field.

Match material grades

Plate and coil grades chosen for strength, weldability and availability, confirmed per project.

Optimize purlins and girts

Z and C laps and spacing are worked out alongside the span the roof and wall panels can carry.

Fit coatings to exposure

Interior members and exposed coastal or ag members each coated for their own environment.

Plan for containers

Splices and member lengths set so bundles ship without wasted space.

Coordinate the envelope

Panels, fastener patterns and framed openings are laid out at the same time as the girts and purlins.

Check the foundations

Pinned bases and lighter frames can reduce reactions; anchor rod plans go to the foundation engineer.

Weigh the life cycle

Maintenance access and durability compared with first cost before an option is offered.

Design and coordination

Eight steps from your design to approved steel

Nothing here will surprise a US design team. Loads are agreed up front, every idea arrives as a written option, your Engineer of Record rules on each, and only approved drawings reach the shop floor.

  1. Design intake

    You upload the architectural set, any structural design, the geotechnical report and the specification.

  2. Design criteria sheet

    Code edition, local amendments, risk category, wind, snow and seismic data and loads are listed for your Engineer of Record to confirm.

  3. VE proposal

    A written memo lists each option, what it changes, its effect on tonnage, connections and freight, and the code provision it was checked to.

  4. Engineer of Record review

    Each option is accepted, modified or rejected, and the decision is logged so nothing changes quietly.

  5. Approval drawings and calculations

    SAP2000 calculations, framing drawings, anchor rod plan and column reactions for the foundation design.

  6. Submittals and plan review

    Calculations, design drawings and product data are packaged for your building department, and plan-check comments are answered in writing.

  7. Release for fabrication

    Production starts only on approved drawings, with RFIs closed and the current revision locked in PEB Studio.

  8. Change control

    Any later change returns to the Engineer of Record and is reissued as a new revision.

Who does what

PartyRole in a value-engineered metal building
OwnerSets the program and budget, hires the design team and contractor, and decides on VE options with their advisers.
ArchitectProtects layout, clear heights, openings and appearance, and confirms VE options keep the design intent.
Engineer of RecordResponsible for the overall structure; confirms criteria, approves or rejects each option and reviews submittals. The PE seal on the permit set stays with this engineer.
General contractor or erectorRuns the schedule, foundations, anchor rods and erection, and brings site constraints into the VE review.
World Steel USADesigns the metal building system as manufacturer, proposes VE options, prepares calculations, shop drawings and material records, and fabricates.
Building official and special inspectorReview the permit set and inspections, and decide how the fabricator’s IAS AC472 accreditation applies under IBC §1704.2.5.

Production at our Vietnam plant

From flat plate to a tapered rafter in our plant

Once your drawings are approved, the members are cut, welded and checked in World Steel’s own plant in Vietnam under its IAS AC472 inspection program.

Plate and coil strip racked by grade and heat number in the store Photo

Plate receiving and traceability

Plate and coil are checked against mill test reports and stored by grade and heat number.

Fitter comparing a built-up beam with its shop drawing Photo

Cutting and fit-up

Flanges and tapered webs are cut to the shop drawing, fitted and checked before welding.

Two welders operating a submerged-arc welding station on a member Photo

Automatic web-to-flange welding

Submerged-arc lines run the long seams to qualified procedures.

Welder looking over the stiffeners and end plate of a heavy column Photo

End plates and stiffeners

Connection plates, stiffeners and clips are welded and bolt holes drilled.

Quality inspector taking dimensions on a finished steel member Photo

Dimensional and weld inspection

Every weld is visually inspected, with NDT to the extent the specification calls for.

Roller conveyor carrying members into a shot-blasting machine Photo

Surface preparation

Members are shot-blasted to the cleanliness the coating system requires.

Coated members drying in rows on stands in the paint hall Photo

Coating

Paint goes on to the system in your specification, and dry film thickness is logged per member.

Painted members strapped into bundles and stacked for the voyage Photo

Packing in erection order

Members are piece-marked, QR-labeled in PEB Studio and bundled by area for the site.

You can witness hold points at the plant, send a third-party or special inspector, or join an inspection live over Zoom or Microsoft Teams. Photos: World Steel factory, Vietnam.

What you receive

Documents your engineer and plan reviewer can check

  • Criteria sheet listing code edition and loads, signed by your EOR
  • VE memo that sets out each option separately
  • Log recording which options were taken and which were declined
  • SAP2000 calculations for the approved design
  • Framing and erection drawings
  • Anchor rod plan with column reactions
  • Tekla shop drawings and IFC model, included at no extra charge
  • Material list with mill test reports by heat number
  • Plant inspection and test records
  • IAS AC472 accreditation details for the permit file
  • Packing lists keyed to piece marks and QR labels
  • Plan-check comments answered in writing for your building department

We quote a saving only after running your project’s numbers in the VE proposal. Before-and-after case studies appear here only with calculations and the owner’s permission.

Asked by US owners and engineers

Design optimization questions

Does value engineering weaken the building?

No. Code edition, wind speed, exposure, snow and seismic data and loads stay exactly as your Engineer of Record set them. VE changes how the steel carries those loads, and each option is checked to the same code.

How much can value engineering save?

It depends on the starting design. A frame drawn with uniform rolled shapes usually has more room than one already optimized. The proposal shows the tonnage and price effect of each option for your project; we do not publish general percentages.

Are tapered built-up members accepted under US codes?

Yes. Welded built-up I-sections are designed to AISC 360, welded to AWS D1.1 procedures and traced to mill test reports. They are the standard frame in US metal building systems.

Who is Engineer of Record if World Steel USA designs the frame?

Your EOR is hired by the owner or the contractor, not by us, and keeps responsibility for the structure as a whole. We design the metal building system as manufacturer and submit calculations and drawings for that engineer’s review. That engineer approves the set, and the PE seal and permit stay with the US contractor, our customer.

Can VE start after the permit is issued?

Yes, but each accepted change needs Engineer of Record approval and may need a permit revision. The earlier we see the design, the more options remain and the less paperwork they create.

Will VE affect my foundations?

Often. Lighter frames and pinned bases can reduce column reactions, while bracing changes can move loads. We issue the anchor rod plan and reactions so the foundation engineer can check them before concrete is placed.

What drawings will I receive, and when?

Proposal drawings come with the quotation on projects we design. After the contract is signed you receive the approval drawings (APD) with the Design Report of structural calculations. Once the APD is approved, we produce the shop drawings and Tekla model, included at no extra charge, and only then does fabrication start.

What do you need from us to optimize the design?

The architectural drawings, any structural drawings and calculations, and your preferred scheme: frame type, spans, bay spacing, cranes, mezzanines and plans for expansion. The site address, a geotechnical report and your site date help us finish the picture.

Will every member really fit in a shipping container?

Yes. Splice points are set in the design model so each piece fits inside a standard 20 ft or 40 ft container, and every bolted field splice is designed and checked to AISC 360. Containers are the most economical way to ship steel from Vietnam to the US.

Where do the materials come from?

Mainly from steel plants in Vietnam, with Japan, Korea, Indonesia or Thailand when the specification calls for a grade or size rolled there. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and the heat number is traced to every member in PEB Studio.

Does optimization slow down production?

No. Design, detailing and fabrication happen under one roof and the materials are already available in Vietnam, so approved drawings move straight into the production slot booked for your site date.

Can we inspect members during production?

Yes. You or a third-party inspector can witness hold points at the plant or join an inspection by video. Records are stored against each piece mark in PEB Studio.

Have your next building optimized

Share drawings, a model or simply the size and location. We send back an optimized design with written options, checked to US codes and sized to ship in containers, ready for your Engineer of Record to review.