Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Hawaii · Energy

Structural steel for Hawaii energy and utility plants

Each Hawaiian island runs its own grid, so power plants, battery and solar sites, fuel terminals and water plants are spread across every island, many at Campbell Industrial Park on Oahu. Their buildings and equipment steel follow the owner’s specifications in salt air. We fabricate and galvanize that steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and shipped by ocean freight to Honolulu for your Hawaii site.

Long hot-dip galvanized ladder cages lying in a yard
Hot-dip galvanized ladder cages for a 50 m (164 ft) tower job, Vietnam.
Grids
One per island
Hub
Campbell Industrial Park
Coatings
Galvanized outdoors
Spec
Owner specifications

Why it matters

Island grids, island steel

A utility plant on the islands is hard to reach for repairs and sits in wind and salt air, so materials, coatings and inspection are specified in detail by the owner.

We fabricate to the owner’s specifications and inspection plan, galvanize exposed steel and pack it by system so each area goes up in order.

What we design and fabricate

Steel for energy sites

Equipment structures

Platforms and supports for process and electrical equipment.

Plant buildings

Process, compressor and maintenance buildings.

Galvanized steel

Hot-dip galvanizing for exposed outdoor steel.

Owner specifications

Fabrication to the owner’s project specifications.

Who does what

Energy steel, split clearly

World Steel supplies

  • Plant buildings, platforms and equipment steel
  • Fabrication to owner specifications
  • Galvanizing or coating systems for the exposure
  • Mill certificates traced by heat
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Foundations and equipment setting
  • Piping, electrical and controls
  • Erection and site work

Hawaii

What we do not claim

World Steel names no Hawaii energy or utility company as a customer and claims no completed Hawaii energy project. Process design and equipment are the owner’s scope.

Hawaii ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · Hawaii contractors

Hawaii contractors: let’s win the next project together

If your next bid involves energy and utility plants, World Steel wants to be your long-term, win-win steel partner in Hawaii. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your Hawaii project is cut, welded, inspected and packed.

Coated members drying in rows on stands in the paint hall
Members drying in the World Steel paint hall in Vietnam after coating.
Members in gray finish paint laid out in the paint hall
Gray finish coat applied in the Vietnam paint hall.
Coated frame parts with welded brackets in the paint hall
Frame parts with their brackets, coated and drying, World Steel, Vietnam.
Painted members strapped into bundles and stacked for the voyage
Bundles made up for an export shipment at the Vietnam plant.

Q&A

What Hawaii buyers ask

Do you work to utility specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you galvanize the steel?

Yes. Hot-dip galvanizing is available for exposed members.

Do you name utilities as customers?

No. World Steel names no company as a customer on this site.

Official sources: Hawaii State Energy Office

Building in Hawaii?

Send the drawings or the site address, size and use. We set the Hawaii design basis with your Engineer of Record, design or detail the steel to your county’s code, hurricane wind and island seismic, coat it for salt air, and quote it made in our plant in Vietnam, packed in erection order and shipped by ocean freight to Honolulu.