Solutions · Steel building design

Steel building design to US codes, ready for your engineer’s review

World Steel designs and fabricates the steel structure. We engineer your building to the code your jurisdiction has adopted and deliver a clear calculation package and drawing set that the US contractor, our customer, and their Engineer of Record review, approve and take to the building department.

Our scope
Design and fabrication of the steel structure
Design basis
IBC, ASCE 7, AISC 360 and AISI S100 as adopted locally
Software
SAP2000 analysis and Tekla Structures detailing
Approval
Your Engineer of Record reviews and approves the drawings

How it works

From your site data to an approved drawing set

  1. Site and code data

    You give us the address, the use of the building and any geotechnical report. We confirm the code edition your jurisdiction enforces and the loads that follow from it.

  2. Design basis letter

    Before any frame is sized, we put the loads, codes, materials and deflection limits in writing for you and your Engineer of Record to check.

  3. Analysis and design

    Frames, secondary members, bracing and connections are designed in SAP2000 and modeled in Tekla, the same model the plant fabricates from.

  4. Your review and approval

    The calculations, anchor bolt plans and building drawings go to you and your Engineer of Record, who review and approve them for your permit submittal.

  5. Review comments

    If your engineer or the building department sends comments, the engineers who designed the building answer them in writing and reissue revised sheets.

  6. Released for fabrication

    Only the revision you approved is released to the shop, and PEB Studio records which revision every member was made to.

  7. Request a quote A napkin sketch, a site plan or a full permit set is enough to get a steel package priced for your US site. Start a quote →
  8. Quality you can check Mill certificates, signed inspection records and factory checks you can join by video from the US. Quality control →

What you receive

Documents in your design package

  • ✓ Design basis letter with loads, codes and load combinations
  • ✓ Structural calculations that name each code check
  • ✓ Anchor bolt plan with column reactions for your foundation engineer
  • ✓ Frame elevations, roof and wall framing plans and bracing layout
  • ✓ Connection details and a bolt schedule
  • ✓ Shop drawings for every assembly and part, included at no extra charge
  • ✓ Erection drawings with piece marks that match the labels on the steel
  • ✓ IAS AC472 accreditation certificate for the plant that fabricates your building

Who does what

How our design fits around your team

RoleWhoScope
Steel structure design and fabrication World Steel Frames, secondary framing, bracing, connections, column reactions, calculations, drawings and fabrication in our Vietnam plant
Engineer of Record The US contractor’s or owner’s team Review and approval of our drawings and calculations, the PE seal and the overall building design
Foundation engineer Your design team or contractor Footings, slab and anchorage embedment, designed from the reactions we provide
Building official Your jurisdiction Plan review, permit and any special inspection requirements, through the US contractor

Designed for your site

Loads we design for at your address

Wind

Basic wind speed, exposure category and pressure zones under ASCE 7, with debris region rules on hurricane coasts.

Snow

Ground snow, drift against higher roofs and unbalanced loads, from the snow map or the value your jurisdiction sets.

Seismic

Seismic design category, lateral system and anchorage that follow from your site class.

Collateral and equipment

Sprinklers, ducts, lighting, solar panels and hung equipment you tell us about.

Cranes

Runway loads, impact and fatigue for bridge cranes and monorails, when the building carries them.

Energy code

Roof and wall assemblies that meet the IECC for your climate zone.

Design optimization

Optimized first, then sent for your review

Before the drawings reach your engineer, our engineers optimize the design: less steel for the same code loads, every member sized to fit a shipping container and materials from Vietnam plants ready for production.

  • Optimized steel tonnage

    Tapered built-up frames follow the bending moment, and bay spacing, purlins and girts are tuned as one system. Your building carries the same code loads with the steel it actually needs, and the proposal reports the tonnage for your project.

    Tapered framesBuilt-up steel sectionsZ purlins

  • Lower investment cost

    Less steel to buy, fewer shop hours, fewer containers and simpler bolted erection all lower the installed cost of the building. The proposal shows the effect of each option on your project, never a generic percentage.

    Complete building packageBuilding packagesComponents-only supply

  • In-depth project assessment

    Engineers review your drawings, the code edition your jurisdiction enforces, wind, snow and seismic data, foundations, erection sequence and the route to your site, then write down the risks and options they find before you commit.

    Steel building designDesign processUS codes & standards

  • Designed to ship in containers

    Every member is detailed to fit inside a standard 20 ft or 40 ft shipping container, with splices placed by the engineer, not cut on the shop floor. Containers are the most economical way to move steel from Vietnam to the US, and they reach your port sealed.

    Shipping Vietnam to USAExport packing & shippingIncoterms for steel buildings

  • Fast response to your production schedule

    Design, detailing and fabrication sit under one roof, and the materials are already available in Vietnam, so approved drawings move into production without waiting on imported steel. Your production slot is booked against your site date and tracked live in PEB Studio.

    Shop drawings, includedPEB StudioProject management

  • Quality materials from Vietnam plants

    Most of the plate, coil and sections come from steel plants in Vietnam, ready for our plant without long import queues. Each heat arrives with the mill’s EN 10204 type 3.1 inspection certificate, and its heat number follows every member it goes into.

    World Steel factoryQuality controlIAS AC472 accreditation

Shop drawings, included on every project

Asked by US buyers

Questions about steel building design

Who approves and seals the drawings?

The US contractor, our customer, and their Engineer of Record. World Steel designs and fabricates the steel structure and prepares the calculations and drawings they review, approve and seal for the permit.

We already have an Engineer of Record. Can you still help?

Yes. We design the steel structure to the criteria your Engineer of Record sets, and they review our calculations and drawings against the contract documents.

Which code edition do you use?

The edition your jurisdiction has adopted. IBC 2024 and ASCE 7-22 are our default when a jurisdiction allows them, and we confirm the local edition before design starts.

Do you design the foundations?

No. We provide the column reactions and an anchor bolt plan, and your foundation engineer designs the footings and slab.

Who answers review comments on the steel design?

The engineers who designed your building, in writing, with revised sheets for your Engineer of Record.

More solutions

Often used together

Bidding a large US project?

Send the bid documents, or just a footprint and an address. Our engineers check them against US code requirements and confirm what World Steel would supply, from a plant that fabricates 2,500 metric tons of structural steel a month.