Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Corrosion protection

Coatings chosen for the real exposure

Surface preparation, coatings and detailing picked for the site: coastal air, road salt, farm atmospheres or a dry inland plain. Blasting and painting run in-house, on the same lines that coat 2,500 t of structural steel a month, and every result goes into the Manufacturing Data Record.

ISO 12944-2 corrosivity · pick your site
Shot blasting machine cleaning steel members before painting at the World Steel plant

Typical C2 system

Often enough indoors or in dry rural air.

Topcoat40 µm
Shop primer80 µm
Blast-cleaned steel, Sa 2½

Example only, not a specification. Total about 120 µm.

Typical C3 system

The common choice for most US commercial sites.

Polyurethane topcoat50 µm
Epoxy intermediate80 µm
Zinc-rich primer60 µm
Blast-cleaned steel, Sa 2½

Example only, not a specification. Total about 190 µm.

Typical C4 system

Where salt or chemicals reach the steel.

Polyurethane topcoat60 µm
Epoxy intermediate120 µm
Zinc-rich primer60 µm
Blast-cleaned steel, Sa 2½

Example only, not a specification. Total about 240 µm.

Typical C5 system

Duplex systems for the harshest air.

Polyurethane topcoat60 µm
Epoxy tie coat80 µm
Hot-dip galvanizing85 µm
Blast-cleaned steel, Sa 2½

Example only, not a specification. Total about 225 µm.

Four tools

Galvanize, paint, both, or detail it out

Hot-dip galvanizing

Members dipped in molten zinc by a galvanizer, for weather, salt and animal housing.

Shop paint systems

Blast cleaning, then primer, intermediate and topcoat applied and checked in our plant.

Duplex

Paint over galvanizing for the most aggressive exposures.

Detailing

Drain holes, sealed crevices and separated dissimilar metals help any coating last.

Recorded, member by member

Blast, coat, measure, record

Blast profile, dry film thickness and adhesion results go into the Manufacturing Data Record you receive with the steel. Tap a photo to open it full size.

Steel members fed into the blasting line on rollers Photo
Painted steel members drying in the World Steel paint shop Photo
Finished painted members laid out for inspection Photo
Painted frame parts stacked before packing Photo

In detail

How we specify protection

Hot-dip galvanizing

Arranged with a galvanizer for members that face weather, salt or animal housing.

Paint systems

After blast cleaning, shop systems such as zinc-rich primer, epoxy intermediate and polyurethane topcoat are applied in the factory.

Duplex systems

Galvanizing with a paint system over it, for the most aggressive exposures.

Detailing

Drain holes, sealed crevices and separation of dissimilar metals help coatings last longer.

Inspection

Blast profile, dry film thickness and adhesion results are recorded in the Manufacturing Data Record.

Large-project capacity

Coated in-house for the largest jobs

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

In the catalog

Corrosion protection items in the catalog

Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Hot-Dip Galvanizing

Fabricated steel dipped in molten zinc so the coating covers every face, edge and inside corner. Made by World Steel in Vietnam Verified
Primed column with its bolted end plate set on painting stands Photo

Zinc-Rich Primer

A zinc-loaded first coat sprayed onto freshly blasted steel in the shop to give the paint system sacrificial protection. Made by World Steel in Vietnam Verified
Coated members drying in rows on stands in the paint hall Photo

Epoxy Coatings

Tough epoxy middle coats that build film thickness and seal the primer from moisture and chemicals. Made by World Steel in Vietnam Verified
Members in gray finish paint laid out in the paint hall Photo

Polyurethane Coatings

Color-stable polyurethane finish coats that resist sunlight and weather on exposed steel. Made by World Steel in Vietnam Verified
Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Duplex Systems

Paint applied over galvanizing, for steel that faces the harshest coastal, chemical or agricultural exposure. Made by World Steel in Vietnam Verified
Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Corrosion-Resistant Fasteners

Galvanized, coated or stainless screws and bolts chosen so fasteners don't rust out before the panels and steel they hold. Made by World Steel in Vietnam Verified
Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Protective Connection Detailing

Design details such as drain holes, sealed joints and isolation of dissimilar metals that keep water from sitting on the steel. Made by World Steel in Vietnam Verified
Inspector walking a line of painted built-up members on the shop floor Photo

Coating Inspection

Shop checks of blast profile, film thickness and adhesion, logged in the Manufacturing Data Record shipped with your steel. Made by World Steel in Vietnam Verified
Drawn illustration of corrosion protection, standing in for a photo of this product Illustration

Maintenance Planning

Guidance for owners on what to inspect, clean and touch up so the coatings keep protecting the steel. Made by World Steel in Vietnam Verified

Where it meets the other systems

Primary Structural System

Main frame members receive their blast cleaning and coating system in our plant.

Design limit: The system suits the site’s corrosivity, and any slip-critical faying surfaces get a coating qualified for that slip class or are masked. · What gets checked: Film thickness and adhesion are measured and logged in the Manufacturing Data Record.

Secondary Framing

Purlins and girts arrive galvanized from the coil or with a shop paint finish.

Design limit: Zinc coating weight is picked for the exposure, and edges cut after coating get touch-up. · What gets checked: Coil mill certificate showing the coating designation.

Connections & Anchorage

Bolts and anchor rods get a finish that works with the coating on the steel they connect.

Design limit: Keep metals alike: galvanized steel takes galvanized bolts, so no galvanic couple forms. · What gets checked: Fastener certificates checked against the bolt list.

Optional Add-Ons (Made in Vietnam)

Fireproofing or intumescent coating goes over a shop primer it is approved for.

Design limit: The fire protection manufacturer must accept the primer before the steel is painted. · What gets checked: Thickness readings recorded for the special inspector.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Coating system selection with you for the site exposure
  • Blast cleaning and shop painting in our plant; galvanizing arranged with a galvanizer
  • Blast profile, dry film thickness and adhesion results recorded in the Manufacturing Data Record
  • Touch-up paint matched to the shop system, shipped with the steel

The US contractor, our customer

  • Touch-up of transport and erection damage at site
  • Owner inspection and maintenance over the building’s life
  • Drawing approval, the PE seal and the permit with your Engineer of Record

Questions from US contractors

Corrosion protection questions and answers

6 answers, grouped by topic.

Choosing a system 3 answers

Paint or hot-dip galvanizing: which should I choose?

It depends on the exposure, the look you want and maintenance access. Galvanizing suits weather, salt and animal housing; shop paint systems give color and smooth finishes; duplex systems combine both for the harshest sites.

What do C2 to C5 mean?

They are the atmospheric corrosivity categories of ISO 12944-2, from low (C2) to very high (C5). We use them to match a coating system to the site.

Is the film build on this page a specification?

No. The systems shown are typical examples. The coating specification is set for each project with you and your design team.

Inspection 2 answers

What is recorded for each coated member?

Blast profile, dry film thickness and adhesion results go into the Manufacturing Data Record you receive with the steel.

Is coating life warranted?

No. Coating performance depends on the exposure, touch-up of damage and owner maintenance, so we do not warrant a coating life.

Large projects 1 answer

Can you coat a large tonnage in-house?

Yes. Blasting and painting are in-house lines sized for a plant that fabricates 2,500 t of structural steel a month, including jobs like the 2,000 t Long Son petrochemical complex.

Keep reading

Related pages

Price it or partner with us

Tell us where the building stands.

Send the site address and what happens inside. We propose a coating system for the exposure and record every result in the data book.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details