Hot-dip galvanizing
Members dipped in molten zinc by a galvanizer, for weather, salt and animal housing.
Four tools
Members dipped in molten zinc by a galvanizer, for weather, salt and animal housing.
Blast cleaning, then primer, intermediate and topcoat applied and checked in our plant.
Paint over galvanizing for the most aggressive exposures.
Drain holes, sealed crevices and separated dissimilar metals help any coating last.
Recorded, member by member
Blast profile, dry film thickness and adhesion results go into the Manufacturing Data Record you receive with the steel. Tap a photo to open it full size.
Photo
Photo
Photo
Photo
In detail
Arranged with a galvanizer for members that face weather, salt or animal housing.
After blast cleaning, shop systems such as zinc-rich primer, epoxy intermediate and polyurethane topcoat are applied in the factory.
Galvanizing with a paint system over it, for the most aggressive exposures.
Drain holes, sealed crevices and separation of dissimilar metals help coatings last longer.
Blast profile, dry film thickness and adhesion results are recorded in the Manufacturing Data Record.
Large-project capacity
World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.
2,500 metric tons a month
In the catalog
Photo
Photo
Photo
Photo
Main frame members receive their blast cleaning and coating system in our plant.
Design limit: The system suits the site’s corrosivity, and any slip-critical faying surfaces get a coating qualified for that slip class or are masked. · What gets checked: Film thickness and adhesion are measured and logged in the Manufacturing Data Record.
Purlins and girts arrive galvanized from the coil or with a shop paint finish.
Design limit: Zinc coating weight is picked for the exposure, and edges cut after coating get touch-up. · What gets checked: Coil mill certificate showing the coating designation.
Bolts and anchor rods get a finish that works with the coating on the steel they connect.
Design limit: Keep metals alike: galvanized steel takes galvanized bolts, so no galvanic couple forms. · What gets checked: Fastener certificates checked against the bolt list.
Fireproofing or intumescent coating goes over a shop primer it is approved for.
Design limit: The fire protection manufacturer must accept the primer before the steel is painted. · What gets checked: Thickness readings recorded for the special inspector.
Scope, in writing
World Steel, our plant in Vietnam
The US contractor, our customer
Questions from US contractors
6 answers, grouped by topic.
It depends on the exposure, the look you want and maintenance access. Galvanizing suits weather, salt and animal housing; shop paint systems give color and smooth finishes; duplex systems combine both for the harshest sites.
They are the atmospheric corrosivity categories of ISO 12944-2, from low (C2) to very high (C5). We use them to match a coating system to the site.
No. The systems shown are typical examples. The coating specification is set for each project with you and your design team.
Blast profile, dry film thickness and adhesion results go into the Manufacturing Data Record you receive with the steel.
No. Coating performance depends on the exposure, touch-up of damage and owner maintenance, so we do not warrant a coating life.
Yes. Blasting and painting are in-house lines sized for a plant that fabricates 2,500 t of structural steel a month, including jobs like the 2,000 t Long Son petrochemical complex.
Keep reading
Price it or partner with us
Send the site address and what happens inside. We propose a coating system for the exposure and record every result in the data book.
Why US contractors price with us
2,500 t / month
Own plant capacity, about 2,750 short tons
IAS AC472
Accredited since 2019, audited twice a year
Up to 5,000 t
Largest single job: Sunpro Steel, 2024