Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Structural steel solutions by state

Large structural steel projects, state by state

Every state builds to its own code, under its own loads, for its own industries, and its steel comes in through its own port. Pick your state for the guides behind your project, then send us the package: we design and fabricate the steel in our own plant in Vietnam, at 2,500 t a month.

2,500 tof steel a month from our own plant

51guide sets: every state and Washington, DC

407in-depth state guides

Pick a state51 sets live

Point at a state for its guide set: the code at your address, site loads, local industries and the port your steel ships to.

In-depth solutions set in every state

Sunpro Steel Factory, a 5,000 t structural steel project by World Steel
Sunpro Steel Factory · Can Tho City, Vietnam · 2024 · 5,000 t

Built for large projects

2,500 t of structural steel a month

Whatever the state, the steel comes from one place: World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472. These are some of the largest single projects it has made.

Sunpro Steel FactorySteel industry · Can Tho City, Vietnam · 2024 5,000 t
CPV Food Processing FactoryFood processing · Dong Nai Province, Vietnam · 2020 2,500 t
Long Son petrochemical complexOil and gas · Ba Ria–Vung Tau, Vietnam · 2022 2,000 t
M&D (MD Factory)Warehouse and industrial · Thailand · 2024 2,000 t
Tongwei Tien Giang feed factory, phase 1Animal feed · Dong Thap Province, Vietnam · 2018 1,500 t
See the large-project program

State solution sets

Pick your state

Each set opens with a hub for the state, then in-depth guides on its code, loads, industries and ports. Every guide links to the products and services it relies on.

The code at your address

The state code, the IBC edition behind it and who enforces it, so the design basis is set before we model the steel.

Site loads

Wind, hurricane debris, snow, seismic, heat or soils: the conditions that drive the frame in that state.

The industries building there

What large projects in that state need from the steel, sector by sector.

Ports and the route to site

The gateway port for the state and how the steel reaches your site, packed in erection order.

Find the guide for your site

Start from the condition that drives your steel

Hurricane wind, seismic, snow, heat, soils or the industry you build for: each condition below links straight to the state guides that cover it.

Heat and energy codes

Thermal movement, roof heat and the energy code for the envelope.

Difficult soils

Expansive clay, caliche, fissures and soft delta soils under the anchor rods.

Ports and delivery

Three coasts, one plant

Steel for every state ships from our plant in Vietnam to the gateway port that suits the site, packed in erection order, with inland delivery coordinated. Each state set has its own ports guide.

Planning the route? Vietnam to US logistics · US seaports we ship to · Incoterms explained

How a state project runs

From your site address to steel on your trucks

Send the site and the drawings

The address, size and use, or the full bid package from your Engineer of Record.

We set the state design basis

Code edition, wind, snow, seismic and soils confirmed with your Engineer of Record.

Designed and made in our plant

Tekla shop drawings at no extra charge, then cutting, welding and coating in Vietnam, followed live in PEB Studio.

Shipped to your state’s port

Packed in erection order and shipped to the gateway port, with inland delivery coordinated.

Your crew erects

The US contractor, our customer, erects with our erection drawings and packing lists; approval, any PE seal and the permit stay on your side.

Real World Steel photos

Every state’s steel starts in our plant in Vietnam

Real photos from World Steel’s own plant, where the steel for your project is cut, welded, blasted, painted and packed. None is shown as a US site.

Drone view across the World Steel plant: office block in front, fabrication halls behind Photo
Welder beside a deep built-up girder running through the automatic line Photo
Fitter comparing a built-up beam with its shop drawing Photo
Welder looking over the stiffeners and end plate of a heavy column Photo
Roller conveyor carrying members into a shot-blasting machine Photo
Coated members drying in rows on stands in the paint hall Photo
Painted members strapped into bundles and stacked for the voyage Photo
Coated frame parts with welded brackets in the paint hall Photo

Q&A

What contractors ask about state projects

Why does each state have its own guide set?

Because the steel changes from state to state. Each state adopts its own edition of the building code, its sites face different wind, snow, seismic and soil conditions, its large projects come from different industries, and its steel arrives through a different port. Each set gathers that for one state, so your team and your Engineer of Record start from the right basis.

Does every state have its own guide set?

Yes. All 50 states and Washington, DC now have a hub and in-depth guides on the code at your address, site loads, local industries and the port route. We still confirm the design basis for your site with your Engineer of Record before we model the steel.

How large a project can you take on in one state?

World Steel’s own plant in Vietnam fabricates about 2,500 t of structural steel a month. Our largest single projects include Sunpro Steel Factory at 5,000 t, the CPV Food plant at 2,500 t and the Long Son petrochemical complex at 2,000 t. Large packages are released area by area to match your erection sequence.

Do you hold state approvals or engineering licenses?

No. World Steel designs and fabricates the steel to the code adopted at your site and to ASCE 7 and AISC standards. Drawing approval, any PE seal, inspections and the permit stay with the US contractor and the Engineer of Record. We hold no state approval, registration or engineering license.

Do you erect the steel in my state?

No. World Steel supplies the steel structure only. Erection and all site work are the scope of the US contractor, our customer, or the erector they hire. We send erection drawings, bolt lists and packing lists organized by erection sequence.

Which port will my steel ship to?

The port that suits your site and schedule: a West Coast port for the West and Southwest, a Gulf port for Texas and the Gulf states, or an East Coast port for the Southeast and the Atlantic states. Each state set has a ports guide, and we compare the options for your address before we quote.

State guides summarize state rules, the International Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.

Building in another state?

Send the drawings or the site address, size and use. We set the design basis with your Engineer of Record, design or detail the steel and quote it made in our plant in Vietnam, packed in erection order for your site.