Members drying in the World Steel paint hall in Vietnam after coating.
Florida · Salt air
Corrosion protection for Florida’s salt air and humidity
Florida has more coastline than any state in the lower 48, and most of its people and projects live close to it. Salt carried on sea breezes, high humidity and warm temperatures speed up corrosion of steel, fasteners and trims. We pick the protection for the exposure your site really has, apply it in our Vietnam plant and record every coat before the steel ships.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, and shipped to a Florida port.
- Exposure scale
- ISO 9223 and ISO 12944-2 categories C1 to CX
- Florida coast
- Often C4 to C5 near open salt water; lower inland
- Options
- Factory paint system, ASTM A123 hot-dip galvanizing, or both (duplex)
- Records
- Coating thickness measured and logged in the fabrication records
Exposure
Typical Florida settings and their likely category
A first guess only. The real category depends on distance to breaking surf, wind direction, shelter and what happens inside the building.
| Florida setting | Likely category | Watch for |
|---|---|---|
| Closed, air-conditioned interior | C1 to C2 | Condensation where cold ducts or roof panels meet humid air |
| Inland Central Florida, such as Orlando or Polk County | C2 to C3 | Fertilizer, citrus processing and pool chemicals raise it locally |
| Bay, river or Intracoastal frontage | C3 to C4 | Brackish spray and frequent wetting |
| Atlantic or Gulf beachfront | C4 to C5 | Salt deposits on surfaces rain does not wash |
| Marinas, boat wash bays, seawalls | C5 and above | Splash, salt water on members, standing water |
Protection
How we protect steel near the water
Paint systems by category
Primer and finish coats selected for the ISO 12944 category and the durability range your project needs.
Hot-dip galvanizing
ASTM A123 galvanizing for frames, and ASTM A153 for hardware, where exposure is high or inspection access is poor.
Duplex systems
Paint over galvanizing for marinas, open sheds near surf and members that stay damp.
Fasteners that last
Coated or stainless fasteners matched to the panel coating, with sealing washers, so screws do not fail before the sheets.
Details that drain
No water traps, sealed or drained hollow sections, and base plates held clear of standing water.
A care plan
Rinsing salt from sheltered surfaces and checking screws and trims each year are written into the handover.
No coating life promised
We record coating systems and measured thicknesses but warrant no coating life. Durability depends on the real exposure, maintenance and damage repair over the years.
Florida ecosystem
Products and solutions for this condition
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Real World Steel photos
World Steel at work
Florida solutions
Other Florida guides
Questions
What Florida buyers ask
Do I need galvanized steel for a building near the beach?
Often, yes, at least for members exposed to outside air. Some projects use a high-build paint system instead, or both. We propose options from the exposure and let you compare them.
What about dissimilar metals?
Aluminum doors, stainless fixings and copper flashings can corrode steel they touch in salt air. We detail isolation where different metals meet.
Do interior members need protection?
In an air-conditioned building, interior steel usually needs only a shop primer or light system. Open sheds, marinas and wet processes need more.
Keep reading
Related pages
Code facts on this page summarize the Florida Building Code, ASCE 7-22 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and building official confirm the edition and local amendments in force for your permit.
Building in Florida?
Send the site address, size and use. We set the Florida criteria, design the steel to the Florida Building Code and quote it made in our Vietnam plant, with approvals for every envelope product coordinated in writing.