Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

Insulation & building performance

From the Gulf Coast to the northern tier

Insulation and vapor control that meet US energy codes, keep people comfortable and stop condensation inside the steel. Supplied with the roof and walls from a plant that fabricates 2,500 t of structural steel a month, including cold-storage jobs like the 1,000 t first phase of New Era.

IECC climate zones, warm to cold

  • Hot-humid · Zones 1–2
  • Warm · Zone 3
  • Mixed · Zone 4
  • Cool · Zone 5
  • Cold · Zones 6–7

Simplified. Your county’s zone is in the energy code your building department adopts.

The warm side moves

Pick a climate. Watch the wall reorder.

Condensation forms where warm, moist air meets cold steel. Which side is warm depends on the climate, so the vapor retarder moves with it.

Climate
OutsideInside

Bar shows the warm side for most of the year. Illustration only.

Zones 1–2

Hot-humid

Gulf Coast, Florida, south Texas

Humid outdoor air is the moisture source, so the vapor control sits toward the outside and the inside can dry.

OutsideInside

Bar shows the warm side for most of the year. Illustration only.

Zone 3

Warm

Georgia, the Carolinas, southern California

Moisture drives both ways over the year. The design team places the retarder for the building’s use.

OutsideInside

Bar shows the warm side for most of the year. Illustration only.

Zone 4

Mixed

Virginia, Tennessee, Kansas

Heating and cooling seasons are close in length, so the assembly is checked for both.

OutsideInside

Bar shows the warm side for most of the year. Illustration only.

Zone 5

Cool

Ohio, Illinois, Colorado

Warm, moist indoor air is the risk in winter, so the vapor retarder sits on the warm inside face.

OutsideInside

Bar shows the warm side for most of the year. Illustration only.

Zones 6–7

Cold

Minnesota, Wisconsin, Maine

Long heating seasons: a continuous retarder on the inside face and sealed laps keep condensation out of the steel.

Label versus assembly

The wall is rated, not the roll

Product label versus finished assembly
An R-value or fire classification printed on a product is not the rating of the finished wall or roof. Energy and fire compliance are judged on the assembly.
Condensation control
Where the warm side of the wall sits depends on climate and use: a heated shop in Minnesota and a cooled warehouse in Texas need the vapor retarder in different places.
Project code requirements
IECC or ASHRAE 90.1 envelope values depend on climate zone and occupancy and are confirmed by the design team.
Bright interior of a finished steel warehouse with insulated roof by World Steel

Large-project capacity

Envelopes for large, conditioned buildings

World Steel fabricates 2,500 metric tons (about 2,750 short tons) of structural steel a month in its own IAS AC472-accredited plant in Vietnam, so the steel package of a large US job runs as one order.

2,500 metric tons a month

In the catalog

Insulation items in the catalog

Where it meets the other systems

Roofing System

Roof insulation sits over the purlins under the sheets, or comes built into insulated panels.

Design limit: Thicker insulation needs longer screws and can change the panel standoff or clip height. · What gets checked: Look for an unbroken vapor retarder with every facing seam taped.

Wall & Cladding System

Wall insulation goes behind the wall sheets, unless insulated metal panels are used instead.

Design limit: Screw length and trim depth follow the insulation thickness, the same as on the roof. · What gets checked: Insulation and vapor retarder run unbroken around doors, windows and louvers.

Scope, in writing

What we supply and what stays with your team

World Steel, our plant in Vietnam

  • Insulation, facings and liner panels supplied with the roof and walls
  • Assembly details for laps, edges and penetrations drawn on the shop drawings
  • Product data for the design team’s energy code check

The US contractor, our customer

  • The energy code compliance path (IECC or ASHRAE 90.1) with your design team
  • Drawing approval, the PE seal and the permit with your Engineer of Record
  • Installation at site and air sealing by your crew
  • Fire-resistance requirements set by occupancy and construction type

Questions from US contractors

Insulation questions and answers

6 answers, grouped by topic.

Energy code 2 answers

Which energy code does the insulation follow?

The one adopted where the building stands, usually the IECC or ASHRAE 90.1. Envelope values depend on the climate zone and occupancy and are confirmed by the design team.

Is the R-value on the label the value of the wall?

No. An R-value printed on a product is not the rating of the finished wall or roof. Energy and fire compliance are judged on the whole assembly, including the steel and fasteners.

Condensation 2 answers

Where does the vapor retarder go?

On the warm side of the assembly, which changes with climate and use. A heated shop in Minnesota and a cooled warehouse in Texas need it in different places.

How do you stop condensation dripping from a metal roof?

With the right insulation thickness, a continuous vapor retarder on the warm side and sealed laps and penetrations, all shown on the shop drawings.

Large projects 2 answers

Do you supply insulation for cold storage?

Yes, alongside the steel. Our cold-storage work includes New Era in Vietnam, where the first phase was about 1,000 t of steel. Insulated panels and their values are confirmed with your design team.

Can a fire rating be included?

Only where an approved, listed assembly applies to your project. Ratings are never assumed from a product label.

Keep reading

Related pages

Price it or partner with us

Tell us the climate and the use.

Send the site address and what happens inside. We supply the insulation and vapor control with the roof and walls, detailed for your design team’s energy check.

Why US contractors price with us

2,500 t / month

Own plant capacity, about 2,750 short tons

IAS AC472

Accredited since 2019, audited twice a year

Up to 5,000 t

Largest single job: Sunpro Steel, 2024

See our largest jobs →

Short project form

Have this system engineered for your site

Ask an engineer directly, or drop the basics below. You get a written scope of supply for a US-code building, checked by engineering first.

Or call +84 902 881 833

Or leave your project details