New Mexico · Long spans
Structural steel for New Mexico sound stages and long-span halls
Albuquerque and Santa Fe have grown into major film and television production hubs, with studio campuses built around large sound stages. A stage needs a column-free floor, a roof that carries heavy lighting grids and catwalks and tall elephant doors. Hangars and assembly halls need the same long spans.
Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered by rail or truck for your New Mexico site.
- Hubs
- Albuquerque, Santa Fe
- Key need
- Column-free floor
- Roof
- Grid and catwalk loads
- Doors
- Tall stage doors
Why it matters
Clear floors, loaded roofs
A sound stage roof carries far more than snow: lighting grids, catwalks, rigging points and mechanical plant hang from it, and the floor below must stay clear. Hangars at Kirtland or Spaceport-area sites need similar spans and doors.
We fabricate long-span trusses and built-up rafters for the grid and rigging loads your Engineer of Record sets, with door headers and catwalk steel in the same package.
What we design and fabricate
Steel for stages and hangars
Stage roofs
Trusses designed for grid, catwalk and rigging loads.
Stage and hangar doors
Deep headers over tall, wide doors.
Catwalks and mezzanines
Steel catwalks, stairs and support rooms.
Long-span frames
Built-up rafters over column-free floors.
Who does what
Hangar steel, split clearly
World Steel supplies
- Long-span frames and door headers
- Crane runways and mezzanines
- Releases matched to the erection sequence
- Mill certificates traced by heat
- Tekla shop and erection drawings, included
The US contractor arranges
- Aircraft and door data from the owner
- Engineer of Record approval and PE seal
- Hangar door supply and installation
- Fire protection and foundations
- Erection and site work
New Mexico
What we do not claim
World Steel names no New Mexico studio, airline or aerospace company as a customer and claims no completed New Mexico stage or hangar. Acoustic design, rigging and doors are your team’s scope.
New Mexico ecosystem
Products and solutions behind this guide
The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.
Open call · New Mexico contractors
New Mexico contractors: let’s win the next project together
If your next bid involves sound stages and long spans, World Steel wants to be your long-term, win-win steel partner in New Mexico. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.
Real World Steel photos
World Steel at work
Real photos from our plant in Vietnam, where the steel for your New Mexico project is cut, welded, inspected and packed.
Q&A
What New Mexico buyers ask
Can the roof carry lighting grids?
Yes. We design roof steel for the grid and rigging loads your engineer sets.
Do you design acoustics?
No. Acoustic design is your team’s scope; we frame for it.
Can you supply hangar steel too?
Yes. The same long-span frames suit hangars and assembly halls.
Official sources: New Mexico Film Office
New Mexico solutions
Every New Mexico guide
Related pages
Code facts on this page summarize New Mexico practice, the New Mexico Commercial Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.
Building in New Mexico?
Send the drawings or the site address, size and use. We set the New Mexico design basis with your Engineer of Record, design or detail the steel to the New Mexico Commercial Building Code, Rio Grande seismic rules and altitude snow, and quote it made in our plant in Vietnam, packed in erection order and delivered by rail or truck to your site.