Skip to content
Seeking US contractor partners IAS AC472 ACCREDITED ★ METAL BUILDINGS ★ AC472 IAS AC472 accreditedIAS AC472
World Steel USA

West Virginia · Mining

Structural steel for West Virginia mine and prep plant structures

West Virginia’s coalfields, in the south around Beckley, Logan and Bluefield and in the north near Fairmont, run preparation plants, conveyors, shops and bathhouses. Their structures follow the owner’s specifications and stand in dust, water and steep terrain. We fabricate and coat that steel.

Made in World Steel’s own plant in Vietnam, the first and only fabricator in Vietnam accredited under IAS AC472, 2,500 t a month, and delivered through Baltimore or Norfolk for your West Virginia site.

Galvanized steel frames with punched bolt plates at the corners on shop trestles
Galvanized frames with their bolt holes open and clean after dipping, Vietnam.
Coalfields
South and north
Typical steel
Prep plants, conveyors
Coatings
Galvanized or duplex
Spec
Owner specifications

Why it matters

Steel for dust, water and slopes

A prep plant stacks heavy equipment on several floors, with conveyors arriving at height across steep ground. Coal dust and water wear coatings, and access for repairs is hard.

We fabricate process buildings, conveyor galleries and transfer towers to the owner’s specifications, galvanize or coat them for the exposure and pack them for the mountain road to the site.

What we design and fabricate

Steel for mines and mills

Process buildings

Mill, concentrator and truck shop buildings.

Crane bays

Crane columns and runways for maintenance.

Conveyor steel

Galleries, trestles and transfer towers to owner specs.

Coatings

Galvanizing or duplex systems for dust and weather.

Who does what

Mine steel, split clearly

World Steel supplies

  • Process buildings, crane bays and conveyor steel
  • Fabrication to owner specifications
  • Coating systems for the exposure
  • Packing for remote site delivery
  • Tekla shop and erection drawings, included

The US contractor arranges

  • Process design and equipment data from the owner
  • Engineer of Record approval and PE seal
  • Site access and foundations
  • Mine safety and permits
  • Erection and site work

West Virginia

What we do not claim

World Steel names no West Virginia mining company as a customer and claims no completed West Virginia mine project. Mine permits and safety are the owner’s scope.

West Virginia ecosystem

Products and solutions behind this guide

The World Steel products, systems and services this guide relies on, made in our plant in Vietnam.

Open call · West Virginia contractors

West Virginia contractors: let’s win the next project together

If your next bid involves mine and prep plant steel, World Steel wants to be your long-term, win-win steel partner in West Virginia. You win the job and build it; we design, fabricate and supply the structural steel from our own plant in Vietnam.

Real World Steel photos

World Steel at work

Real photos from our plant in Vietnam, where the steel for your West Virginia project is cut, welded, inspected and packed.

Shop worker taking a measurement on a steel plate in the yard
Incoming plate is measured at intake, before any cutting, in the Vietnam plant.
Plate and coil strip racked by grade and heat number in the store
Stock in the Vietnam plant is kept by grade and heat number, so each piece traces to its mill certificate.
Long shop floor of built-up members, overhead cranes and a center walkway
One of the World Steel fabrication halls in Vietnam where US orders are built.
Welder beside a deep built-up girder running through the automatic line
A deep plate girder going through automatic welding at World Steel, Vietnam.

Q&A

What West Virginia buyers ask

Do you work to mine owner specifications?

Yes. We fabricate to the owner’s project specifications and inspection plan.

Can you supply conveyor galleries?

Yes. Galleries, trestles and transfer towers to the owner’s design.

Do you handle mine permits?

No. Mine safety and permits are the owner’s scope.

Official sources: West Virginia Office of Miners’ Health, Safety and Training

West Virginia solutions

Every West Virginia guide

Related pages

Code facts on this page summarize West Virginia practice, the West Virginia State Building Code, ASCE 7 and related standards for US buyers. They are not legal or engineering advice; your Engineer of Record and the local building department confirm the code and edition in force for your project.

Building in West Virginia?

Send the drawings or the site address, size and use. We set the West Virginia design basis with your Engineer of Record, design or detail the steel to the West Virginia State Building Code, mountain snow and valley floods, and quote it made in our plant in Vietnam, packed in erection order for mountain roads and delivered through Baltimore or Norfolk.