Hotels and resorts
Pietermaai, Mambo Beach, Jan Thiel, Santa Barbara, Westpunt
Hotel blocks, resorts and villas designed for wind and salt air.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
Project types
The four project types behind most steel orders on the island, with where they cluster and what we recommend. Every photo is a World Steel project or our plant.
Pietermaai, Mambo Beach, Jan Thiel, Santa Barbara, Westpunt
Hotel blocks, resorts and villas designed for wind and salt air.
Process tower frame by World Steel in Vinh Long Province, Vietnam.
The Schottegat, Willemstad
Workshops, crane bays, pipe racks and platforms for the drydock, port and refinery area.
Lattice crane columns on a World Steel job in Can Tho City, Vietnam.
Willemstad and every area
Composite frames for offices, schools, healthcare and public buildings.
Going up beside the plant in Vietnam: World Steel framed its own office building.
Hato, the Schottegat, Willemstad
Clear-span warehouses, distribution and retail buildings near the port and the airport.
Completed, clad building by World Steel in Quang Ngai Province, Vietnam.
Three areas, west to east
Curaçao is known in three parts: Bandabou, the rural west with its villages, beaches and Christoffel National Park; Willemstad in the centre, with the World Heritage waterfront, the Schottegat harbour and the airport; and Bandariba, the east, with Spanish Water, Jan Thiel and Santa Barbara. Each page covers the main places, the ground, the wind, flood and salt conditions, the haul from the port and the steel we recommend. The map is schematic.
The westWillemstadThe east
Bandabou, the quiet west of the island: villages, beaches, farms and Christoffel National Park.
The capital and its harbour: Punda, Otrobanda, Scharloo and Pietermaai, the Schottegat with the port, drydock and industry, and the airport at Hato.
Bandariba: Spanish Water, Jan Thiel, Caracasbaai and Santa Barbara, with resorts, marinas and new housing.
Curaçao guides
Building permits and the choice of Eurocode or US codes, trade winds, passing storms and flash floods, the harbour and industry of the Schottegat, salt and harbour air, the port of Willemstad, and the hotels and public buildings that drive the market, one guide each.
National symbols of Curaçao
The two white stars for Curaçao and Klein Curaçao, the painted gable fronts of the Handelskade, the bitter laraha orange and the tambú drum. Four symbols, and what each one means for the steel we make for Curaçaoan buildings.
The two white stars on the flag stand for Curaçao and Klein Curaçao. Two islands, one design basis on every sheet.
The painted gable fronts on Willemstad’s waterfront are a World Heritage site. New steel buildings stand beside them with respect for the old town.
The bitter laraha orange, grown in Curaçao’s dry soil, gives the island its famous liqueur. Dry, salty conditions shape what lasts, for trees and for steel.
Tambú, the drum and song of the island, carries stories from one generation to the next. Our drawings carry the design from our engineers to your crew.
Why World Steel
2,500 metric tons of structural steel a month from our own plant, released building by building.
Large-project program →Calculations that state the code basis, Eurocode or US, for your engineer and the authorities.
Building permits guide →Frames and cladding designed for steady trade winds and the storms that pass close by.
Wind and flood guide →Workshops, crane bays, pipe racks and platforms for the Schottegat industries.
Harbour and industry guide →Paint systems and galvanizing chosen for the harbour, the south coast and the windward north.
Coatings guide →Packed in erection order and shipped to the container terminal in the Schottegat.
Port delivery guide →Buy it all in one place · Curaçao
Harbour and drydock industry, hotels in Willemstad, warehouses and power. One World Steel order covers design, drawings, fabrication, coating, inspection, packing and shipping, FOB Vietnam or CIF Willemstad, with every piece tracked live in PEB Studio.
All solutions and products for Curaçao→Picked for Curaçao
Hurricane, salt air and earthquake guides
Also from the same plant
One desk, every step
No prices are published. World Steel designs and fabricates the steel; the local contractor, our customer, erects it, and the engineer of record approves the drawings and seals them where local rules require.
Seeking Curaçaoan contractor partners
Hotels and resorts on the south coast, the hospital, schools and offices in Willemstad, harbour and drydock works on the Schottegat, warehouses near the airport and energy and water buildings are large steel packages for an island. You win the job and run the site. We design, detail and fabricate the steel in our own plant, ship it to Willemstad and back your bid with drawings and live tracking.
Hurricanes, salt air, earthquakes
A broad hazard picture for Curaçao and the Caribbean guides that go deep on each one: wind and uplift design, ISO 12944 coatings, galvanizing, coastal details and post-storm care. Your engineer of record sets the site values.
Real World Steel photos
Real photos from World Steel: the plant, plate store, beam line, girders, fit-up, blasting, paint shop and packed bundles. None is shown as a site in Curaçao.
Questions from Curaçaoan buyers
Building permits are issued by the government of Curaçao through its planning and building department. Your engineer of record agrees the code basis for the structure, often Eurocode, Dutch NEN or US codes, with the authorities. We state that basis on the first sheet of our calculations.
Rarely. Curaçao lies near the southern edge of the hurricane belt, but storms still pass close by: Tomas in 2010 brought deadly flooding, and Matthew in 2016 brought heavy seas. Trade winds blow most of the year. We design for the wind your engineer sets.
Curaçao lies near the boundary of the Caribbean and South American plates, and seismic loads are usually low to moderate. Your engineer sets the values; we design and detail the frame to suit.
Our plant fabricates 2,500 metric tons of structural steel a month. Our largest jobs include Sunpro Steel at 5,000 t, CPV Food at 2,500 t and the Long Son petrochemical complex at 2,000 t.
The port of Willemstad, with its container terminal in the Schottegat, the inner harbour behind the Queen Juliana Bridge.
No. World Steel supplies the steel structure only. Erection and site work are the contractor’s scope, done from our erection drawings and piece marks with our engineers on call.
Talk to an engineer
Our engineers and project managers work in English and reply with the code, wind, ground and delivery questions for your site.
Honest status. World Steel designs and fabricates to the code basis your engineer of record sets for Curaçao and the US standards it references. We hold no approval, licence or registration in Curaçao and do not apply for permits; planning permission, building approval and inspections are the contractor’s scope with the engineer or architect of record. We supply the steel structure only; erection and site work are the contractor’s.
Contact World Steel · Curaçao
WhatsApp, email or a video call with our engineers, booked at an hour that suits Willemstad. Our contact page for Curaçao has the ports, the local time and the form.